Claim Missing Document
Check
Articles

Found 4 Documents
Search

The Closure of Isbat For Polygamous Marriage on Legal Purpose Perspective Alhaidar, Nihrul Bahi; Muhajir, Muhammad; Dhuha, Syamsud
Al-Hukama': The Indonesian Journal of Islamic Family Law Vol. 13 No. 1 (2023): June
Publisher : Islamic Family Law Department, Sharia and Law Faculty, UIN Sunan Ampel Surabaya, Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.15642/alhukama.2023.13.1.1-26

Abstract

After attendance, the enactment of the Supreme Court Circular (SEMA) Number 3 of 2018 answers the legal vacuum over isbat for Polygamous marriage. But in practice, the SEMA confuses its implementation. This study aims to analyze the application of polygamous marriage law in SEMA number 3 of 2018 and the juridical implications for justice, expediency, and legal certainty. This research includes normative legal research with statutory and conceptual approaches. Gustav Radbruch's theory of legal purpose is used as his analysis knife. The study concluded that closing the door of Isbat for Polygamous marriage is not the right solution because marriage isbat is one way to obtain legal guarantees in the eyes of the state. The aggrieved subject of the SEMA was a polygamous wife who could not take legal action in seeking justice. Judging from Gustav Radbruch's theory, SEMA number 3 of 2018 has not met the elements of legal objectives. The provisions in SEMA number 3 of 2018 only accommodate the interests of children. The rights of polygamous wives should be prioritized because the benefits received are more significant than tightly closing the door of isbat for Polygamous marriage. It is necessary to review SEMA number 3 of 2018 to contain concrete values of justice, expediency and legal certainty for children and wives.
Analisis Risiko Proyek Pembangunan Relokasi Jalan Nasional Mempawah – Sungai Duri Kalimantan Barat Menggunakan Metode Bow Tie Analysis Dhuha, Syamsud; Artama Wiguna, I Putu
GEMA EKONOMI Vol 12 No 8 (2023): GEMA EKONOMI
Publisher : Fakultas Ekonomi Universitas Gresik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55129/https://doi.org/10.55129/.v12i4.2927

Abstract

The National Road Relocation Development Project in Mempawah, West Kalimantan, functions as a substitute for a national road that will later be affected by the construction of the Kijing International Port in Mempawah Regency, West Kalimantan Province. Current conditions in the field have found several problems that impede the achievement of progress, which poses several risks. This study aims to analyze the highest level of risk from several identified risks. This is why it is important to conduct a risk analysis study on the National Road Relocation Project. This research method uses a qualitative and quantitative approach, starting with the identification of risks in similar projects, then proceeding to test the relevance of risks that may occur and the impact of those risks. Data collection methods were carried out by distributing questionnaires, conducting focus group discussions, and conducting interviews. Furthermore, quantitative analysis was carried out with response scenarios and Bowtie analysis. The results of this study identified the six highest risks: conditions and field data not in accordance with the design, design changes during the project, land for work that has not been acquired, bad weather disturbances, cost overruns, and material price increases. Contingency costs incurred amount to Rp. 15,757,472,740, or 8.34% of the project value, which is Rp. 188,909,724,300.
Inovasi Media Pembelajaran Nadzom di Taman Pendidikan Al-Qur’an Junaidi, Mohammad Rifqi; Rahayu, Linda; Mukaromah, Siti; Nur, Fitroh; Irfani, Alifah Nurul; Faizzatul, Anisa; Nahdiyah, Anis; Muhtadi, Mohammad; Muzaqi, Muhammad Yazid; Muslih, Muhammad; Dhuha, Syamsud
Jurnal Pembelajaran Pemberdayaan Masyarakat (JP2M) Vol. 2 No. 1 (2021)
Publisher : Universitas Islam Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33474/jp2m.v2i1.10686

Abstract

Taman Pendidikan al-Qur’an merupakan lembaga pendidikan dasar informal yang menyelenggarakan pembelajaran Al-Qur’an bagi anak. Peran TPQ sangatlah penting jika dihadapkan dengan kewajiban sebagai orang tua dan masyarakat muslim yang harus mengupayakan pendidikan bagi anak-anaknya untuk mempelajari dan mencintai al-Qur’an sejak dini.  Sebagaimana pendidikan formal yang dikelola dengan sangat baik dengan memperhatikan manajemen, strategi, model, dan media pembelajaran sesuai standar, TPQ pun harus dilaksanakan dengan perencanaan yang sangat baik. Hal ini untuk menjamin kualitas input yang diberikan akan sebanding dengan baiknya output yang dihasilkan. Melihat dari bebagai permasalahan yang ada di TPQ nurul Muttaqin khususnya dalam metode pembelajaran al qur'an yang cenderung monoton maka ksm unisma ditirejo berinovasi menggunakan metode yang asik dan menarik untuk para santri agar tidak bosan. Kemudian kita menggunakan media serta model pembelajaran al-qur'an yang menarik. Model pembelajaran yang kami gunakan yaitu nadzoman di mana nadzhaman yang berupa syi’ir yang dibalut dengan lagu-lagu Islami.
Analisis Risiko Proyek Pembangunan Relokasi Jalan Nasional Mempawah – Sungai Duri Kalimantan Barat Menggunakan Metode Bow Tie Analysis Dhuha, Syamsud; Artama Wiguna, I Putu
GEMA EKONOMI Vol 12 No 8 (2023): GEMA EKONOMI
Publisher : Fakultas Ekonomi Universitas Gresik

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55129/https://doi.org/10.55129/.v12i4.2927

Abstract

The National Road Relocation Development Project in Mempawah, West Kalimantan, functions as a substitute for a national road that will later be affected by the construction of the Kijing International Port in Mempawah Regency, West Kalimantan Province. Current conditions in the field have found several problems that impede the achievement of progress, which poses several risks. This study aims to analyze the highest level of risk from several identified risks. This is why it is important to conduct a risk analysis study on the National Road Relocation Project. This research method uses a qualitative and quantitative approach, starting with the identification of risks in similar projects, then proceeding to test the relevance of risks that may occur and the impact of those risks. Data collection methods were carried out by distributing questionnaires, conducting focus group discussions, and conducting interviews. Furthermore, quantitative analysis was carried out with response scenarios and Bowtie analysis. The results of this study identified the six highest risks: conditions and field data not in accordance with the design, design changes during the project, land for work that has not been acquired, bad weather disturbances, cost overruns, and material price increases. Contingency costs incurred amount to Rp. 15,757,472,740, or 8.34% of the project value, which is Rp. 188,909,724,300.