PENGENDALIAN BIAYA DAN JADUAL TERPADU PADA PROYEK KONSTRUKSI Ahmad Ridwan; Rekso Ajiono
U Karst Vol 1, No 1 (2017): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (482.575 KB) | DOI: 10.30737/ukarst.v1i1.84

Abstract

The main resources limited to the stage of implementing a construction project are cost, quality and time. Planning, scheduling and controlling are important steps to take in order to achieve the project's objectives with limited resources. The "Eaned Value" method is a method of control used to control project costs and schedules in an integrated manner. This method provides information on the status of project performance in a reporting period and provides information on the predicted costs required and time to complete all work based on performance indicators when reporting. In the Construction of the Hospital Medical Rehabilitation Installation Building. Overview of Kediri, the information obtained when reporting on the 91st day was Planed Value / PV = Rp 1.4325 billion, Earned Value / EV = Rp.1,3747 and Actual Cost / AC=Rp.1,3598 billion. At present the project performance in terms of cost is said to be profitable (Cost Variant / CV = + Rp. 0.01 billion and Cost Performed Index / CPI = 1.01> 1). From the schedule aspect, it is said that this project is experiencing delays (Schedule Variant / SV = -Rp.0.06 billion and Schedule Performance Index / SPI = 0.96 <1). The predicted cost needed to complete all work is Rp. 2.8683 billion, showing a profit (under a budget plan of Rp. 2.8998 billion). While the prediction schedule required 129 days, showed experiencing a delay of 2 days from the plan.AbstrakSumberdaya utama terbatas pada tahap pelaksanaan suatu proyek kostruksi adalah biaya, mutu dan waktu. Perencanaan, penjadualan dan pengendalian adalah langkah penting untuk dilakukan agar tujuan pelaksanaan proyek dengan sumberdaya terbatas ini tercapai. Metode ”Nilai Hasil” (Eaned Value) adalah sutau metode pengendalian yang digunakan untuk mengendalikan biaya dan jadual proyek secara terpadu. Metode ini memberikan informasi status kinerja proyek pada suatu periode pelaporan dan memberikan informasi prediksi biaya yang dibutuhkan dan waktu untuk penyelesaian seluruh pekerjaan berdasarkan indikator kinerja saat pelaporan. Pada Pembangunan Gedung Instalasi Rehabilitasi Medik RS. Gambiran Kediri, informasi yang didapat saat pelaporan pada hari ke-91 adalah Planed Value/ PV=Rp 1,4325 milyar, Earned Value/ EV=Rp.1,3747 dan Actual Cost /AC=Rp.1,3598 milyar. Pada saat ini kinerja proyek dari aspek biaya dikatakan untung (Cost Varian/ CV= + Rp. 0.01 milyar dan Cost Performed Index /CPI=1,01>1). Dari aspek jadual, dikatakan proyek ini mengalami keterlambatan (Schedule Varian /SV= -Rp.0,06 milyar dan Schedule Performance Indek/SPI=0,96 <1). Prediksi biaya yang diperlukan untuk menyelesaikan seluruh pekerjaan adalah Rp. 2,8683 milyar, menunjukkan mendapat keuntungan (dibawah rencana anggaran Rp. 2,8998 milyar). Sedangkan prediksi jadual yang diperlukan 129 hari, menunjukkan mengalami keterlambatan 2 hari dari rencana.
PELAKSANAAN MANAJEMEN KONSTRUKSI PADA PROYEK PEMBANGUNAN BANK SINAR MAS KEDIRI Yosef Cahyo Setianto Poernomo; Ahmad Ridwan; Zulkifli Lubis; April Gunarto; Sigit Winarto
U Karst Vol 2, No 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (421.668 KB) | DOI: 10.30737/ukarst.v2i1.101

Abstract

 Bank Sinar Mas Kediri project is a development project that uses a unique implementation method, namely the Top Down method, that is, the construction starts from the floor plate as a new foundation and then continues with the construction of the ground floor 1,2,3. The use of the Top Down method requires a column called King Post which is a column of steel profiles as a temporary column. The hotel is built on a land area of 3248 m2 with a building height of + 123,600 m, - 9,800 m and uses 118 boredpile foundations. This project uses the Fixed Price Lumpsum contract system. This research aims to identify the cause of the delay in the completion of the Sinar Mas Kediri development project. The results of the analysis show that the delay in the completion of the project is due to the delay in completion of the excavation work. The delay was due to the lack of procurement of water pumping or drying equipment, weather or climate and the lack of excavation and limited number of heavy equipment used. Keywords: Delays, Time, Construction.  Proyek Bank Sinar Mas Kediri merupakan proyek pembangunan yang menggunakan metode pelaksanaan yang unik yaitu metode Top Down yaitu pembangunan dimulai dari pelat lantai sebagai tumpuan baru kemudian dilanjutkan dengan pembangunan lantai dasar 1,2,3. Penggunaan metode Top Down memerlukan kolom yang disebut King Post yang merupakan kolom dari profil baja sebagai kolom sementara. Hotel tersebut dibangun di atas tanah seluas 3248 m2 dengan tinggi bangunan + 123,600 m, - 9,800 m dan menggunakan 118 pondasi boredpile. Proyek ini menggunkan sistem kontrak Lumpsum Fixed Price.Penelitian ini bertujuan untuk mengidentifikasi penyebab keterlambatan penyelesaian proyek pembangunan Bank Sinar Mas Kediri. Hasil analisis menunjukkan bahwa Keterlambatan penyelesaian proyek disebabkan keterlambatan penyelesaian pekerjaan penggalian tanah. Keterlambatan tersebut dikarenakan kurangnya pengadaan akan alat pemompa air atau alat pengeringan, cuaca atau iklim dan tidak adanya jumlah tenaga kerja penggalian dan terbatasnya jumlah alat berat yang digunakan. Kata Kunci : Keterlambatan, Waktu, Konstruksi Kata Kunci : keterlambatan, waktu, konstruksi.
PENGENDALIAN BIAYA DAN JADUAL TERPADU PADA PROYEK KONSTRUKSI Ahmad Ridwan; Rekso Ajiono
U Karst Vol. 1 No. 1 (2017): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v1i1.84

Abstract

The main resources limited to the stage of implementing a construction project are cost, quality and time. Planning, scheduling and controlling are important steps to take in order to achieve the project's objectives with limited resources. The "Eaned Value" method is a method of control used to control project costs and schedules in an integrated manner. This method provides information on the status of project performance in a reporting period and provides information on the predicted costs required and time to complete all work based on performance indicators when reporting. In the Construction of the Hospital Medical Rehabilitation Installation Building. Overview of Kediri, the information obtained when reporting on the 91st day was Planed Value / PV = Rp 1.4325 billion, Earned Value / EV = Rp.1,3747 and Actual Cost / AC=Rp.1,3598 billion. At present the project performance in terms of cost is said to be profitable (Cost Variant / CV = + Rp. 0.01 billion and Cost Performed Index / CPI = 1.01> 1). From the schedule aspect, it is said that this project is experiencing delays (Schedule Variant / SV = -Rp.0.06 billion and Schedule Performance Index / SPI = 0.96 <1). The predicted cost needed to complete all work is Rp. 2.8683 billion, showing a profit (under a budget plan of Rp. 2.8998 billion). While the prediction schedule required 129 days, showed experiencing a delay of 2 days from the plan.AbstrakSumberdaya utama terbatas pada tahap pelaksanaan suatu proyek kostruksi adalah biaya, mutu dan waktu. Perencanaan, penjadualan dan pengendalian adalah langkah penting untuk dilakukan agar tujuan pelaksanaan proyek dengan sumberdaya terbatas ini tercapai. Metode ”Nilai Hasil” (Eaned Value) adalah sutau metode pengendalian yang digunakan untuk mengendalikan biaya dan jadual proyek secara terpadu. Metode ini memberikan informasi status kinerja proyek pada suatu periode pelaporan dan memberikan informasi prediksi biaya yang dibutuhkan dan waktu untuk penyelesaian seluruh pekerjaan berdasarkan indikator kinerja saat pelaporan. Pada Pembangunan Gedung Instalasi Rehabilitasi Medik RS. Gambiran Kediri, informasi yang didapat saat pelaporan pada hari ke-91 adalah Planed Value/ PV=Rp 1,4325 milyar, Earned Value/ EV=Rp.1,3747 dan Actual Cost /AC=Rp.1,3598 milyar. Pada saat ini kinerja proyek dari aspek biaya dikatakan untung (Cost Varian/ CV= + Rp. 0.01 milyar dan Cost Performed Index /CPI=1,01>1). Dari aspek jadual, dikatakan proyek ini mengalami keterlambatan (Schedule Varian /SV= -Rp.0,06 milyar dan Schedule Performance Indek/SPI=0,96 <1). Prediksi biaya yang diperlukan untuk menyelesaikan seluruh pekerjaan adalah Rp. 2,8683 milyar, menunjukkan mendapat keuntungan (dibawah rencana anggaran Rp. 2,8998 milyar). Sedangkan prediksi jadual yang diperlukan 129 hari, menunjukkan mengalami keterlambatan 2 hari dari rencana.
PELAKSANAAN MANAJEMEN KONSTRUKSI PADA PROYEK PEMBANGUNAN BANK SINAR MAS KEDIRI Yosef Cahyo Setianto Poernomo; Ahmad Ridwan; Zulkifli Lubis; April Gunarto; Sigit Winarto
U Karst Vol. 2 No. 1 (2018): APRIL
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/ukarst.v2i1.101

Abstract

 Bank Sinar Mas Kediri project is a development project that uses a unique implementation method, namely the Top Down method, that is, the construction starts from the floor plate as a new foundation and then continues with the construction of the ground floor 1,2,3. The use of the Top Down method requires a column called King Post which is a column of steel profiles as a temporary column. The hotel is built on a land area of 3248 m2 with a building height of + 123,600 m, - 9,800 m and uses 118 boredpile foundations. This project uses the Fixed Price Lumpsum contract system. This research aims to identify the cause of the delay in the completion of the Sinar Mas Kediri development project. The results of the analysis show that the delay in the completion of the project is due to the delay in completion of the excavation work. The delay was due to the lack of procurement of water pumping or drying equipment, weather or climate and the lack of excavation and limited number of heavy equipment used. Keywords: Delays, Time, Construction.  Proyek Bank Sinar Mas Kediri merupakan proyek pembangunan yang menggunakan metode pelaksanaan yang unik yaitu metode Top Down yaitu pembangunan dimulai dari pelat lantai sebagai tumpuan baru kemudian dilanjutkan dengan pembangunan lantai dasar 1,2,3. Penggunaan metode Top Down memerlukan kolom yang disebut King Post yang merupakan kolom dari profil baja sebagai kolom sementara. Hotel tersebut dibangun di atas tanah seluas 3248 m2 dengan tinggi bangunan + 123,600 m, - 9,800 m dan menggunakan 118 pondasi boredpile. Proyek ini menggunkan sistem kontrak Lumpsum Fixed Price.Penelitian ini bertujuan untuk mengidentifikasi penyebab keterlambatan penyelesaian proyek pembangunan Bank Sinar Mas Kediri. Hasil analisis menunjukkan bahwa Keterlambatan penyelesaian proyek disebabkan keterlambatan penyelesaian pekerjaan penggalian tanah. Keterlambatan tersebut dikarenakan kurangnya pengadaan akan alat pemompa air atau alat pengeringan, cuaca atau iklim dan tidak adanya jumlah tenaga kerja penggalian dan terbatasnya jumlah alat berat yang digunakan. Kata Kunci : Keterlambatan, Waktu, Konstruksi Kata Kunci : keterlambatan, waktu, konstruksi.