Village-level infrastructure development requires a systematic planning process to ensure that construction activities are effectively implemented, properly targeted, and sustainable. One of the challenges faced by village governments is the limited technical capacity in preparing construction planning documents, particularly in developing technical designs, identifying work components, calculating quantities, and estimating construction costs. This community service activity aimed to improve the infrastructure planning capacity of Meunasah Tutong Village, Ingin Jaya District, Aceh Besar Regency, through technical assistance in preparing planning documents for a concrete pavement construction project at the village prayer hall. The activity was conducted using a participatory approach involving village authorities and community representatives. The implementation stages included initial coordination, field surveys, technical design preparation, work identification using a Work Breakdown Structure (WBS), quantity estimation, unit price surveys for materials and labor, and preparation of the Budget Plan (RAB). The results showed that the technical assistance successfully produced infrastructure planning documents consisting of technical drawings and a construction cost estimate with a total budget of IDR 62.3 million. Beyond the technical outputs, the activity also improved partners’ understanding of basic construction planning processes, including needs identification, work breakdown preparation, quantity calculation, and cost estimation. This activity demonstrates that a technical assistance approach based on learning by doing can effectively strengthen village government capacity in planning infrastructure development in a more systematic, transparent, and community-oriented manner.