Perbaikan Kestabilan Dinamik Sistem Tenaga Listrik Multimesin dengan Metoda Linear Quadratic Regulator Danas, Aidil; Dibyo Laksono, Heru; ., Syafii
JURNAL NASIONAL TEKNIK ELEKTRO Vol 2, No 2: September 2013
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (259.997 KB) | DOI: 10.25077/jnte.v2n2.88.2013

Abstract

System stability is an inportant part in the planning and operation of electric power systems, especially dynamic stability. The ability of a power system to maintain stability under small disturbances defined as dynamic stability. The small disturbances consist of load variation in generation side in random, slow and cascaded. This condition may change system frequency which effect in system stability and can not work normally. The aim of this research is to design suitable control system via simulation to respond small disturbances in the power system.  The simulation test system is used PT. PLN data Sumbar-Riau system under Linear Quadratic Regulator (LQR) method. The method is used to obtain control value to reach desagn criteria, that are overshoot less then 5 % and steady state time less then 4 second. The simulatino result shows that the system design have reach the criteria of design at 0.65 times basic load to 1.35 times of basic load.  Keywords : Dynamic stability, controller, Linear Quadratic Regulator (LQR)AbstrakPada perencanaan dan operasi sistem tenaga listrik, kestabilan sistem adalah hal yang sangat penting terutama kestabilan dinamik. Kestabilan dinamik adalah kestabilan sistem terhadap gangguan kecil. Gangguan kecil ini berupa perubahan beban pada sisi pembangkit secara acak, pelan, dan bertingkat. Gangguan ini mengakibatkan perubahan frekuensi yang menyebabkan kestabilan sistem berubah sehingga tidak mampu bekerja secara normal. Tujuan penelitian ini untuk mendapatkan informasi perancangan pengendali melalui simulasi untuk memperbaiki kestabilan sistem akibat perubahan beban kecil. Simulasi dilakukan pada sistem tenaga listrik PT. PLN Sumbar-Riau dengan menerapkan metoda Linear Quadratic Regulator (LQR). Metode ini digunakan mendapatkan nilai pengendali agar dapat memenuhi kriteria rancangan yang diinginkan, yaitu lewatan maksimum tidak lebih dari 5 % dan waktu keadaan mantap kurang dari 4 detik. Hasil simulasi menunjukkan rancangan pengendali memenuhi kriteria pada kondisi 0.65 kali beban dasar sampai dengan 1.35 kali beban dasar.Keywords : Dynamic stability, controller, Linear Quadratic Regulator (LQR)  
Simulator Posisi Matahari dan Bulan Berbasis Web Dengan WebGL ., Kamshory; ., Syafii
JURNAL NASIONAL TEKNIK ELEKTRO Vol 3, No 2: September 2014
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2171.619 KB) | DOI: 10.25077/jnte.v3n2.84.2014

Abstract

Moon as a satellite of the earth has an important role for the life of the earth. Apart from being a source of illumination, moon also has an effect on the earth both on land and at sea. The influence of the moon to the earth relate to the its position. This research aims to create a simulator of the sun and moon position to the earth based on the time and location of the observation. This simulator is web-based and made in 3-dimensional (3D) using webGL technology. The position of the sun and moon expressed by latitude and longitude which is a position that is passed by the line connecting the earth to the sun or the line connecting the earth to the moon. The position of the sun and moon obtained from calculations based on previous research. Once the position is known, the earth, the sun, and the moon then described as a 3-D model. The position of the camera can be moved by dragging a web page so that the sun, earth, and moon can be seen from various positions. The camera always leads to the center of the earth to avoid user errors flipping the camera which causes the object is not visible.Keywords: sun, earth, moon, declination angle, moon phase, time systems, delta T, webGLAbstrakBulan sebagai sebuah satelit bumi mempunyai peranan penting bagi kehidupan bumi. Selain sebagai salah satu sumber penerangan, bulan juga mempunyai pengaruh bagi bumi baik di darat maupun di laut. Pengaruh bulan terhadap bumi berhubungan dengan posisinya. Penelitian ini bertujuan membuat simulator posisi matahari dan bulan terhadap bumi berdasarkan waktu dan lokasi pengamatan. Simulator dibuat berbasis web dalam 3 dimensi (3D) dengan menggunakan teknologi webGL. Posisi matahari dan bulan dinyatakan dengan lintang dan bujur yang merupakan posisi yang dilewati oleh garis yang menghubungkan bumi dengan matahari atau garis yang menghubungkan bumi dengan bulan. Posisi matahari dan bulan didapatkan dari perhitungan berdasarkan penelitian sebelumnya. Setelah posisi tersebut diketahui, bumi, matahari, dan bulan digambarkan sebagai model 3 dimensi. Posisi kamera dapat dipindahkan dengan men-drag halaman web sehingga matahari, bumi, dan bulan dapat dilihat dari berbagai posisi. Kamera selalu mengarah ke pusat bumi untuk menghindari kesalahan pengguna memindah-mindahkan kamera yang menyebabkan objek tidak terlihat.Kata kunci: matahari, bumi, bulan, sudut deklinasi, fase bulan, sistem waktu, delta T, webGL
Studi Peramalan (Forecasting) Kurva Beban Harian Listrik Jangka Pendek Menggunakan Metode Autoregressive Integrated Moving Average (ARIMA) ., Syafii; Noveri, Edyan
JURNAL NASIONAL TEKNIK ELEKTRO Vol 2, No 1: Maret 2013
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2353.943 KB) | DOI: 10.25077/jnte.v2n1.100.2013

Abstract

Prakiraan kebutuhan energi listrik merupakan langkah mula yang penting dalam perencanaan dan pengembangan penyediaan tenaga elektrik setiap saat secara cukup, baik dan  terus menerus. Oleh karena itu, diperlukan suatu metode permalan beban yang akurat dan mudah di implementasikan berdasarkan ketersediaan data yang ada.Metode ARIMA (Box-Jenkins) merupakan metode yang cocok digunakan untuk menjembatanipermasalahan tersebut, karena terbukti akurat untuk peramalan beban jangka pendek. Penentuan model untuk peramalanARIMA terdiri dari beberapa tahap yaitu : pengecekan pola  data, identifikasimodel yang terdiri dari uji stasioneritas varians dan means, estimasi parameter dan pengukuran tingkat keakuratan model yang akan digunakan untuk peramalan dengan MAPE sebagai indikatornya. Data yang digunakan dalam penelitian ini adalah data time series beban harian listrik per-jam (24jam) dari tanggal 1 Juli-31Oktober 2012. Hasil penelitian memperlihatkan model terbaik yang diperoleh adalah (0,1,0)(0,1,1)24 dengan MAPE terkecil yaitu 2,975% untuk pengujian pertama  dan MAPE kedua sebesar 3,08%Kata kunci :   Peramalan beban, ARIMA, data time series, stasioneritas, penentuan model, dan MAPE
Koordinasi Sistem Proteksi Arus Lebih Pada Penyulang Distribusi 20 kV GI Pauh Limo ., Erliwati; ., Syafii; Nurdin, Muhammad
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 2: September 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jnte.v4n2.144.2015

Abstract

The 20 kV feeder outages typically caused by short circuit fault. If the setting of over current relay (OCR) in the incoming or outgoing feeder unfavorable, can cause a total blackout. One of the efforts can be done is to evaluate the settings of 20 kV feeder protection relays in distribution substations Pauh Limo, to be well coordinated with each other and expected if an interruption in one of the 20 kV feeders it will not bring interrupt on the other feeders.Based on the short circuit current analysis on each feeder, where the largest short circuit fault current for three-phase fault at feeder Tingga Koto, the fault location 1%, which amounted to 7326.99 Ampere. This is because the line to Koto Tingga shortest compared to other feeders, around 9 km and load current = 230 Ampere. The OCR working time at the feeders id: Kuranji = 0.3 s Koto Tingga = 0.298 s, Teluk Bayur-2 = 0.292 s, Teluk Bayur-1 = 0.3 s, BLKI = 0.3 s, Kandis = 0.3 s and feeder UNAND = 0, 3 s. The relay working time for incoming side is 0.7 seconds. This relay setting can be used as a reference of evaluation and  resetting of  OCR.Keywords : Short circuit fault, Over current relay,  Relay setting.ABSTRAK—Pada penyulang 20 kV biasanya pemadaman disebabkan oleh gangguan hubung singkat. Jika penyetelan over current relay (OCR) di sisi incoming atau di outgoing kurang baik, dapat menyebabkan pemadaman total (black out). Salah satu upaya yang dilakukan adalah dengan mengevaluasi setting relai proteksi pada penyulang distribusi 20 kV gardu induk Pauh Limo, sehingga saling terkoordinasi dengan baik dan diharapkan jika terjadi gangguan pada salah satu penyulang 20 kV maka tidak akan membawa black out pada penyulang yang lain.Berdasarkan analisa arus hubung singkat disetiap penyulang, dimana arus gangguan hubung singkat 3 fasa terbesar yaitu pada penyulang Koto Tingga, dengan lokasi gangguan 1 %, yaitu sebesar 7326,99 Ampere. Hal ini dikarenakan saluran Koto Tingga terpendek dibandingkan dengan penyulang lain, yaitu = 9 km dan arus beban = 230 Amper. Waktu kerja relai pada penyulang (detik) : Kuranji = 0,3, Koto Tingga = 0,298, Teluk Bayur-2 = 0,292, Teluk Bayur-1 = 3, BLKI = 0,3, Kandis = 0,3 dan penyulang UNAND = 0,3. Pada sisi incoming waktu kerja relai adalah 0,7 detik. Setting relai ini dapat digunakan sebagai referensi dalam evaluasi dan setting ulang OCR.Kata Kunci : Gangguan hubung singkat, Relai arus lebih, setting relai..  
Comparative Study of Three Linear System Solver Applied to Fast Decoupled Load Flow Method for Contigency Analysis Syafii, Syafii; Andre, Hanalde
JURNAL NASIONAL TEKNIK ELEKTRO Vol 6, No 1: Maret 2017
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (439.268 KB) | DOI: 10.25077/jnte.v6n1.381.2017

Abstract

This  paper  presents the  assessment  of  fast  decoupled load flow computation using three linear system solver scheme. The full matrix version of the  fast  decoupled  load flow  based on XB  methods used in this study.  The numerical investigations are carried out  on  the  small and large test systems.  The execution time of small system such as IEEE 14, 30, and 57 are very fast, therefore the computation time can not be compared  for these cases.  Another cases IEEE 118, 300 and TNB 664 produced significant execution speedup. The superLU factorization sparse matrix solver has best performance and speedup of load flow solution as well as in contigency analysis. The invers full matrix solver can solved only for IEEE 118 bus test system in 3.715 second and for another cases take too long time. However for superLU factorization linear solver can solved all of test system in 7.832 second for a largest of test system. Therefore the superLU factorization linear solver can be a viable alternative applied in contingency analysis.Keywords : Fast Decoupled Load Flow, Contigency Analysis, and Linear System Solver
Tracker Tiga Posisi Panel Surya untuk Peningkatan Konversi Energi dengan Catu Daya Rendah Yandi, Welly; Syafii, Syafii; Pulungan, Ali Basrah
JURNAL NASIONAL TEKNIK ELEKTRO Vol 6, No 3: November 2017
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jnte.v6n3.468.2017

Abstract

This article describes the use of a three-position tracker to increase the conversion of electrical energy from the sun with a low power supply. The three-position tracker system has been tested using two identical solar panels with 250 Wp capacities mounted flat and with tracker. The testing process carried out for 3 days in the top of the building Department of Electrical Engineering Andalas University of Padang. The test results show the average percentage increase in energy conversion is 0.263 kWh / day or 27.9% per day. While the energy requirement for three position tracker actuator are 0.624 Wh / day and track control system of 18 Wh / day. So that the energy consumption of tracker system three positions is equal to 0.0186 kWh / day. This is because the three-position tracker system uses actuators with DC motors equipped with a gearbox so that the tracker's torque becomes greater. Energy consumption for tracker control using arduino is greater than tracker energy itself because the control is always active for 24 hours. While the three-position tracker is only active for 100 seconds. Thus, the energy consumption used by the three-position tracker system is much smaller than the increase in energy conversion produced by solar panels.Keywords : Three position tracker, Increased solar panel energy conversionAbstrak Artikel ini memaparkan tentang penggunaan tracker tiga posisi untuk meningkatkan konversi energi listrik dari matahari dengan catu daya rendah. Sistem tracker tiga posisi telah diuji menggunakan dua buah panel surya yang identik dengan kapasitas 250 Wp yang dipasang flat dan dengan tracker. Proses pengujian dilakukan selama 3 hari di atas gedung Jurusan Teknik Elektro Universitas Andalas Padang.  Hasil pengujian menunjukkan  persentase rata-rata peningkatan konversi energi sebesar 0,263 kWh/hari atau 27,9% per hari. Sedangkan kebutuhan energi untuk aktuator tracker tiga posisi sebesar 0,624 Wh/hari dan sistem kontrol tracker sebesar 18 Wh/hari. Sehingga besar konsumsi energi sistem tracker tiga posisi adalah sebesar 0,0186 kWh/hari. Hal ini disebabkan karena sistem tracker tiga posisi menggunakan aktuator dengan motor DC yang dilengkapi gearbox sehingga kemampuan torsi tracker menjadi lebih besar. Konsumsi energi untuk pengontrolan tracker menggunakan arduino lebih besar dibandingkan energi tracker itu sendiri karena pengontrolan selalu dalam keadaan aktif selama 24 jam. Sementara tracker tiga posisi hanya aktif selama 100 detik. Dengan demikian, konsumsi energi yang digunakan oleh sistem tracker tiga posisi jauh lebih kecil dibandingkan peningkatan konversi energi yang dihasilkan panel surya.Kata Kunci : Tracker tiga posisi, Peningkatan konversi energi panel surya
Pengembangan Sistem Proteksi Digital Arus Lebih Berbasis Logika Fuzzy Sebagai Pengaman PLTMH ., Cahayahati; ., Syafii; Darmana, Ija; ., Zulwisli
JURNAL NASIONAL TEKNIK ELEKTRO Vol 2, No 2: September 2013
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (627.193 KB) | DOI: 10.25077/jnte.v2n2.68.2013

Abstract

In this paper discussed digital overcurrent protection system fuzzy logic on plant systems or Micro Hydro Power Plants with fuzzy logic approach to the identification of the signal changes due to interference overcurrent short circuit the lifeboat station on the system. A digital overcurrent protection with a fuzzy logic-based method and the rules set if-then, fuzzification and defazzification which has 2 inputs are crisp and delta error and error the actual fault current has a crisp output 1 to input changes in current to drive the relay breaker. This system consists of a hardware system with microcontroller (mc) ATMega8535 and other series as well as software that helps in the protection process performance Delpi 7 computer using fuzzy logic and program using C language and dicompel with CodeVisionAVR software and uploaded to the microcontroller using ponyprog2000 ATMega8535. The success of a prototype digital overcurrent protection system was tested on a fuzzy logic system voltage of 220 volts with a simple system technique burdened beyond any current settings and calculated over a given working time protection relay. After testing and calculations, then the inverse Characteristics of digital protection between the current disruption to the working time protection can be envisaged that a larger fault current less time working to secure protection from interference generating systems.Keyword : Fuzzy Logic, ATMega8535, Proteksi Digital.AbstrakDalam makalah ini dibahas sistem proteksi digital arus lebih logic fuzzy (Fuzzy Logic Protection) pada sistem pembangkit atau Pembangkit Listrk Tenaga Mikro Hidro dengan pendekatan fuzzy logic untuk identifikasi perubahan sinyal besar gangguan arus lebih akibat hubung singkat yang terjdi pada sistem pembangkit. Suatu proteksi digital arus lebih dengan metode berbasis logika fuzzy dan kaidah-kaidah atur if-then, fuzzifikasi dan defazzifikasi yang mempunyai 2 crisp input yaitu error dan delta error arus gangguan aktual dan mempunyai 1 crisp output perubahan arus untuk input rele untuk menggerakan pemutus. Sistem ini terdiri dari perangkat keras dengan sistem mikrokontroler (mc) ATMega8535 dan rangkaian lainnya serta perangkat lunak yang membantu penampilan proses proteksi di komputer menggunakan Delpi 7 dan program fuzzy logic menggunakan bahasa C dan dicompel dengan software CodeVisionAVR dan diupload ke mikrokontroler ATMega8535 menggunakan ponyprog2000. Keberhasilan prototipe sistem proteksi digital arus lebih fuzzy logic diujikan pada sistem sederhana tegangan 220 Volt dengan teknik sistem dibebani melebihi setting dan setiap arus lebih yang diberikan dihitung waktu kerja rele proteksi. Setelah melakukan pengujian dan perhitungan, maka karaktristik invers proteksi digital antara arus gangguan terhadap waktu kerja proteksi dapat tergambar bahwa semakin besar arus gangguan semakin cepat waktu kerja proteksi untuk mengamankan sistem pembangkit dari gangguan. Keyword : Fuzzy Logic, ATMega8535, Proteksi Digital.  
Analisa Perbaikan Profil Tegangan Sistem Tenaga Listrik Sumbar Menggunakan Kapasitor Bank dan Tap Transformator Abadi, Akbar; ., Syafii
JURNAL NASIONAL TEKNIK ELEKTRO Vol 4, No 2: September 2015
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (400.986 KB) | DOI: 10.25077/jnte.v4n2.145.2015

Abstract

Voltage stability evaluation is needed to get the information of electrical power distribution system performance. Power flow calculation is used to determine the important parameters of power system in a steady state. An electric power system must have voltage value that does not exceed the limits of tolerance and the power loss as well as small. The improvement of voltage profile can be done by using voltage-control equipments, such as capacitor banks and transformer tap. Through simulation using the PowerWorld simulator, the value and location of capacitor banks and transformers tap will obtained in order to improve system performace. Sumbar electrical system was used in this study. From the simulation results, for the initial condition of the system, there are several buses that have voltage drop with total system losses 14.4 MW. After capacitor added, the system voltage has increased significantly so that no one passed the value of tolerance and the losses in the system down to 14.1 MW. As for setting the ratio of tap transformer, voltage system did not change so much, except on the secondary side of the transformer bus arranged with system losses almost the same that equal to 14.4 MW. For the case of the addition of the capacitor and transformer tap settings in the same time, the voltage drop no longer exceeds 5% and the total system losses decreased to 13.9 MW.           Keywords :Voltage stability, Capacitor bank, Tap transformator, Voltage drop, and System losses.Abstrak-Evaluasi stabilitas tegangan perlu dilakukan untuk mendapatkan informasi performasi sistem penyaluran tenaga listrik. Perhitungan analisa aliran daya digunakan untuk menentukan parameter-parameter penting sistem tenaga listrik dalam keadaan tunak. Suatu sistem tenaga listrik yang baik harus memiliki nilai tegangan yang tidak melebihi batas toleransi serta rugi-rugi daya yang kecil. Perbaikan profil tegangan dapat dilakukan dengan menggunakan peralatan pengatur tegangan, yaitu kapasitor bank dan tap transformator. Melalui simulasi menggunakan PowerWorld simulator akan diperoleh nilai dan lokasi kapasitor bank dan tap transformator yang tepat untuk  memperbaiki performasi sistem. Sistem kelistrikan Sumbar digunakan dalam penelitian ini. Dari hasil simulasi, untuk  kondisi awal sistem, terdapat beberapa bus yang mengalami drop tegangan dengan total rugi-rugi sistem sebesar 14,4 MW. Setelah penambahan kapasitor, tegangan sistem mengalami peningkatan yang signifikan sehingga tidak ada yang melewati nilai toleransi dan rugi-rugi sistem turun menjadi 14,1 MW. Sedangkan untuk pengaturan rasio tap transformator, tegangan sistem tidak mengalami perubahan yang begitu besar, kecuali pada sisi sekunder transformator bus yang yang diatur dengan rugi-rugi sistem hampir sama yaitu sebesar 14,4 MW. Untuk kasus penambahan kapasitor dan pengaturan rasio tap transformator sekaligus, tidak ada lagi drop tegangan yang melebihi dari 5 % dan  total rugi-rugi sistem turun menjadi 13,9 MW.                                                                                                                                                       Kata Kunci : Stabilitas tegangan, Kapasitor bank, Tap transformator, Drop tegangan, dan Rugi-rugi sistem.   
Analisa Operasi Ekonomis Pembangkit Termal untuk Melayani Beban Puncak Sistem Kelistrikan Sumbar Syafii, Syafii; Ika Putri, Kartika
JURNAL NASIONAL TEKNIK ELEKTRO Vol 7, No 1: March 2018
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (782.557 KB) | DOI: 10.25077/jnte.v7n1.458.2018

Abstract

The economical operation of electric power systems is an important aspect in energy system management. The research aim is analyzing the economical operation of thermal generators by performing calculations to obtain optimal power and minimum generation costs, using the lamda iteration method. The case study of the operation of the plant in serving the peak load is taken on the West Sumatera electrical system with the assumption that the thermal generator units used are the PLTD, PLTG Pauh Limo, and PLTU Ombilin power plant. The power demand (PD) to be serviced by the thermal generator is 76.8 MW taken from 15% of maximum load duration curve 512 MW. The distribution of load demand for each thermal generating unit obtained through the economic dispatch calculation. The resulted of economical operation of the thermal generator P1 = 1,25 MW, P2 = 15,867 MW, and P3 = 59,683 MW with total generation cost 57,295,977.57 IDR/h. The calculation and comparison with other configuration scheduling results showed that by using economic dispatch method in power generation scheduling, has obtained efficient generation configuration with minimum operating cost to serve the peak load. Thus, the generation cost can be saved as the generation capacity can be optimized or operated in accordance with the calculation of economic operation.Keywords : Thermal Power Plant, Economic Dispatch, Lamda Iteration MethodAbstrakOperasi ekonomis sistem tenaga listrik merupakan aspek penting dalam manajemen sistem energi. Penelitian ini bertujuan melakukan analisa operasi ekonomis pembangkit termal dengan melakukan perhitungan untuk mendapatkan daya yang optimal serta biaya pembangkitan minimum, dengan  menggunakan metode iterasi lamda. Studi kasus operasi pembangkit dalam melayani beban puncak diambil pada sistem kelistrikan Sumbar dengan asumsi unit pembangkit termal yang digunakan adalah PLTD, PLTG Pauh Limo, dan PLTU Ombilin. Besar daya beban (PD) yang akan dilayani oleh pembangkit termal tersebut diambil 15 % dari kurva lama beban harian maksimum 512 MW yaitu 76,8 MW. Pembagian pembebanan untuk masing-masing unit pembangkit termal diperoleh melalui perhitungan economic dispatch. Hasil perhitungan operasi ekonomis untuk masing-masing pembangkit termal tersebut adalah P1 = 1,25 MW, P2 = 15,867 MW, dan P3 = 59,683 MW dengan total biaya pembangkitan Rp 57.295.977,57 per jam. Hasil perhitungan dan perbandingan dengan konfigurasi penjadwalan lainnya memperlihatkan bahwa dengan menggunakan perhitungan operasi ekonomis dalam penjadwalan pembangkit, telah diperoleh konfigurasi pembangkitan yang efisien dengan biaya operasi minimum untuk melayani beban puncak.  Dengan demikian biaya pembangkitan dapat dihemat sekirannya kapasitas pembangkitan dapat dioptimalkan atau dioperasikan sesuai dengan hasil perhitungan operasi ekonomis.Kata Kunci :  Pembangkit Termal, Economic Dispatch, Metode Iterasi Lamda
Operasi Ekonomis dan Unit Commitment Pembangkit Thermal pada Sistem Kelistrikan Jambi ., Delima; ., Syafii
JURNAL NASIONAL TEKNIK ELEKTRO Vol 5, No 3: November 2016
Publisher : Jurusan Teknik Elektro Universitas Andalas

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25077/jnte.v5n3.313.2016

Abstract

Economical operation at power plants is an important aspect in the management of power system economic operation, his specialty in this paper discusses economic and operating unit Commitment to coordination of power plant electrical systems Jambi by applying method of the list of priorities. The data used in this paper is thermal power plant in November 2015 conducted in Jambi province retrieved results less economical, for it is need for calculation of economical operations for power generation units. The selected combination is the combination that produces the most fuel costs to a minimum. On the imposition of 235 MW power by operating unit 4 generating namely PLTG Batanghari unit 1, PLTMG segai gelam unit 3, unit 6, Rent PLTG PLTG Batanghari unit 2. With operating expenses amounted to Rp.,65.102.864.238 method of the list of priorities in solving unit commitment gives results which are more optimal as compared to the total costs incurred by PT. PLN (Persero) Area Of Jambi. The total cost of the plant from PT. PLN (Persero) Rp Jambi Region. 163,755,996.30 thus there are savings of Rp. 60,891,757.65. per mounth From the results of this data processing operations are economical in power plants in Jambi province need to be rethought to make it more efficient in the use of electrical energy.Keywords : Optimization of plant scheduling, economical operation, Combination of on / off priority list. Abstrak - Operasi ekonomis pada pembangkit tenaga listrik merupakan suatu aspek penting dalam manajemen sistem tenaga listrik khusus nya operasi ekonomis, dalam makalah ini membahas tentang operasi ekonomis dan unit Commitment untuk koordinasi pembangkit sistem kelistrikan Jambi dengan menerapkan metode daftar prioritas. Data yang digunakan dalam makalah ini  adalah pembangkit listrik tenaga termal pada bulan November 2015 dilakukan di Provinsi Jambi diperoleh hasil kurang ekonomis, untuk itu perlu adanya perhitungan pada operasi ekonomis untuk unit-unit pembangkit. Kombinasi yang dipilih adalah kombinasi yang menghasilkan biaya bahan bakar yang paling minimum. Pada pembebanan daya 235 MW dengan mengoperasikan 4 unit pembangkit yaitu PLTG Batanghari unit 1, PLTMG segai gelam unit 3, PLTG Sewa unit 6, PLTG Batanghari unit 2. Dengan biaya operasi sebesar Rp.102.864.238,65. Metode daftar prioritas dalam menyelesaikan permasalahan unit commitment memberikan hasil yang lebih yang lebih optimal dibandingkan dengan total biaya yang dikeluarkan oleh PT.PLN (Persero) Wilayah Jambi. Total biaya pembangkit dari PT.PLN (Persero) Wilayah Jambi Sebesar Rp. 163.755.996,30 dengan demikian ada penghematan sebesar Rp. 60.891.757,65./bulan. Dari hasil pengolah data  ini maka operasi ekonomis pada pembangkit tenaga listrik di Provinsi Jambi perlu dikaji ulang agar lebih efesien dalam penggunaan energi listrik.Kata Kunci : Optimalisasi penjadwalan pembangkit , Operasi ekonomis, Kombinasi on/off  daftar prioritas .
Co-Authors ., Cahayahati ., Delima ., Erliwati ., Kamshory Abadi, Akbar Aditio Pribadi, Rizki Adrianti Adrianti Adrianti, Adrianti Agung W. Setiawan Akshar, Muh Alex, Taman Ali Basrah Pulungan Almoataz Youssef Abdelaziz Andi Pawawoi Andrivo Rusydi Arnawan Hasibuan Arya, Engla Harda Asrizal . Aswardi Aswardi Aulia Aulia Aulia Aulia Axel Doriza Azhari Zakri , Azriyenni Azizah, Farah Azriyenni Azhari Zakri Azzahrah, Nadia Fatimah Beni Nugroho, Dionysius Benriwati Maharmi Budi Endarto Cahayahati . Chamdani, Chamdani Dadan Ramdan Danas, Aidil Darmana, Ija Dawam Habibullah Dawam Habibullah Delima . Dina Maizana Dona Juliandri Edyan Noveri Elmiyasna Kimin Elysia Sholiha, Almira Rahma Endang Tri Wahyuni Erliwati . Fahreza, Rahmad Fajril Akbar Farah Azizah Fierda Nurany, Fierda Fikriyatullatifah, Anisa Fitriyan, Rahmawati Gumilar, Candra Habib Satria Habib Satria Habibullah, Dawam Hanalde Andre Handayani, Mia Putri Hasdi Putra, Hasdi Herris Yamashika Herris Yamashika Heru Irianto Ija Darmana Ika Putri, Kartika Ilham Cholid Ilhamdi Rusydi, Muhammad Imam Fauzi Ath Thaariq Indrajaja, Nobella Indri Dayana Irfan El Fakhri Ita Merni Patulak Jaka Windarta Juliandri, Dona K. M. Nor K. M. Nor K. M. Nor Kamsidjo Budi Utomo Kamsory Kamsory, Kamsory Kartika Ika Putri Kartika Sri Kumala Sari Khin Moe Moe Kurniawan, Sulistyo Agung Dwi Kusnadi, Sekar Ayumeida Laksono, Heru Dibyo Layrenshia, Belinda Leily Wustha Johar Liambana, Junlianty Lovely Son, Lovely M. Yonggi Puriza Maharmi, Benriwati Marroh, Zahrotul Isti'anah Matalata, Hendi Maulidi, M. Alfi Moe, Khin Moe Mohammad Taufiq Hidayat Monice Monice Moranain Mungkin Muhammad Fadlan Siregar Muhammad Hadi Putra, Muhammad Hadi Muhammad Imran Hamid Muhammad Khahfi Zuhanda Muhammad Nasir Muhammad Nurdin Muhammad Ridha Fauzi Muhardika Muhardika Mumtazah, Lutfia Anis Muzamir Isa Nasir, Hikmah Afifah Nasir, Muhammad Nofri Dodi Noor Azahra, Anggraeni Noviandri, Dian Novizon, Novizon Nur Izrillah, Imra Nurdin, Muhammad Nurmarini, Eva Perdana Putra, Ilham Prihadini, Diana Purwadhi Purwadhi Putri, Lusi Ngestina Rahmad B.Y Syah Rahmad Fahreza Rahmawati Fitriyan Refdinal Nazir Ricky Maulana Ridwan, Ridwan Rizka Hadelina Roni Putra Rudi Salam Rusydi, Muhammad Ilhamdi Salfikri, Iqbal Sapto Nisworo Since Yuliana Frans, Inggrid Slamet Raharjo Sugiono Sugiono Syah, Rahmad B. Y. Syah, Rahmad B.Y Syukri Yunus Tahrir, Muhammad Thoriq Kurnia Agung Thoriq Kurnia Agung Veranita, Mira Wati Wati Wati Wati Wati, Wati Welly Yandi Yandi, Welly Yona Mayura Yudi Arfan Yusdiansyah, Yusdiansyah Zahroni, Teguh Rizali Zarta, Abdul Rasyid Zulwisli .