PENYEBAB CHANGE ORDER PROYEK KONSTRUKSI RUMAH SAKIT Daniel Daniel; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.22252

Abstract

The number of hospital construction projects in Indonesia continues to grow. The main reason is because Indonesia's territory is getting denser, so it is necessary to develop supporting facilities to keep up with this development. In a construction project there are three important things in a construction project to focus on, namely quality, cost and time. In order for these three important elements to be carried out, an agreement must be made which must be agreed upon and regulated by the parties involved in accordance with the applicable provisions and in the form of a contract. In a project there may be a change in the contract caused by several predictable and unexpected variables, these changes are known as change orders. Change orders are common and unavoidable in every construction project, both government construction projects and private construction projects. To reduce the occurrence of change orders, it is necessary to know the factors that cause changes in contracts in hospital construction projects. Factors that cause change orders are compiled into a questionnaire to find out the main causes of change orders. Questionnaires were distributed to owners, consultants and contractors who are experienced in hospital construction projects in the Bandung area. This questionnaire will be processed using the Partial Least Square method and using the smartPLS 3.0 application. It was found that the construction factor affected the change order in hospital construction projects with a path coefficient value of 0.702 or 70.2%. Abstrak Jumlah proyek konstruski rumah sakit di Indonesia terus berkembang. Alasannya dikarenakan wilayah Indonesia yang semakin padat, dan dibutuhkanlah pengembangan fasilitas-fasilitas pendukung untuk mengikuti perkembangan tersebut. Pada proyek konstruksi terdapat tiga hal penting yang menjadi fokus, yaitu mutu, biaya dan waktu. Agar ketiga unsur itu dapat terwujud, dibuat suatu kontrak yang disepakati dan diatur oleh pihak yang terlibat sesuai dengan ketentuan yang berlaku. Pada suatu proyek bisa terjadi perubahan kontrak yang disebabkan oleh beberapa variabel terduga maupun variabel yang tidak terduga, perubahan tersebut dikenal dengan istilah change order. Change order merupakan hal umum dan tidak dapat dihindari dalam setiap proyek konstruksi, baik proyek konstruksi pemerintah maupun proyek konstruksi swasta. Untuk mengurangi terjadinya change order, maka perlu mengetahui faktor penyebab perubahan kontrak pada proyek konstruksi rumah sakit. Faktor penyebab change order disusun menjadi kuesioner guna mengetahui penyebab utama dari change order. Penyebaran kuesioner dibagikan kepada para pemilik, konsultan, serta kontraktor yang berpengalaman dalam proyek konstruksi rumah sakit di wilayah Bandung. Kuesioner ini diolah dengan menggunakan metode Partial Least Square dan menggunakan aplikasi smartPLS 3.0. Diperoleh bahwa faktor  konstruksi berpengaruh terhadap change order pada proyek konstruksi rumah sakit dengan nilai path coefficient sebesar 0,702 atau 70,2%.
PENILAIAN RISIKO (RISK ASSESMENT) WASTE MATERIAL PROYEK PENINGKATAN JALAN Mega Waty
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 8 No. 1 (2019)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.8.1.1219.117-133

Abstract

Material waste berpengaruh terhadap profit pada proyek peningkatan jalan sehingga mendorong melakukan analisa risiko dimana sebelumnya dilakukan identifikasi risiko. Analisa risiko dilakukan dengan melakukan risk assessment (penilaian risiko). Penilaian risiko dilakukan dengan menilai risiko pada lembar kerja pertama, lembar kerja kedua, lembar kerja ketiga yang merupakan lembar kerja kedua belah pihak. Lembar kerja pertama yakni kontraktor, lembar kerja kedua yakni owner dan lembar kerja kedua belah pihak adalah gabungan dari pihak kontraktor dan pihak owner Penelitian dilakukan pada 107 paket peningkatan jalan dari total kontrak konstruksi dalam 3 tahun anggaran yakni tahun 2014 hingga tahun 2016 pada provinsi Kalimantan Timur dan Kalimantan Utara. Lembar kerja pertama tidak memiliki risiko penyebab pada semua material waste. Lembar kerja kedua pihak menyatakan bahwa semua material waste memiliki risiko penyebab yang bervariasi dan dalam jumlah penyebab yang cukup banyak yang dapat dilihat pada Combined Risk Rating.Combined Risk Rating yang terbesar dan terbanyak terdapat pada waste material timbunan pilihan dengan 10 risiko penyebab, terbanyak kedua pada waste material agregat B dengan 4 risiko penyebab, dan paling sedikit pada Semen dengan 3 risiko penyebab. Risiko penyebab terbanyak yang dimiliki oleh semua material waste adalah penekanan waktu dan penekanan biaya
KERUGIAN KONTRAKTOR AKIBAT WASTE MATERIAL PROYEK KONSTRUKSI GEDUNG BERTINGKAT Hendrik Sulistio; Mega Waty
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 10 No. 1 (2021)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.10.1.2385.84-98

Abstract

Waste in the construction sector can be interpreted as loss or loss of various resources, namely material, time (related to labor and equipment), and capital, which is caused by activities that require direct or indirect costs but do not add value to the final product for service users This study was conducted on 64 respondents of building construction projects to determine the magnitude of losses due to ready mix concrete and its causes. Research using a questionnaire distributed through the online system. Of the 64 respondents produced 9.06 % which is the loss of ready mix concrete. The loss of Ready Mix concrete is 9.06% of the profit of Ready Mix Concrete. The validity test and reliability test produced 18 causative factors that caused the loss of ready mix concrete material waste. The biggest factors causing the loss of ready mix concrete are: lost due to being stolen, design changes, detailed drawing details and material orders that are not according to specifications and scattered when transported/moved.
CHANGE ORDER DAN RISIKO CHANGE ORDER PADA PROYEK JALAN DI JAWA BARAT Mega Waty; Hendrik Sulistio
PADURAKSA: Jurnal Teknik Sipil Universitas Warmadewa Vol. 10 No. 1 (2021)
Publisher : Program Studi Teknik Sipil, Fakultas Teknik dan Perencanaan, Universitas Warmadewa

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22225/pd.10.1.2387.124-141

Abstract

Change Order is a change that occurs in a construction project and cannot be avoided. Analysis of change orders on 10 West Java road construction projects examines how causes of change orders vary between upgrade projects versus maintenance projects, and types of construction (e.g. asphalt works, drainage, structures, and widening of road shoulders and grained pavements, restoration of conditions and minor works and daily work). This study also examines the risks posed by change orders by measuring the frequency and average percentage changes in project costs for various types of change orders. The research methodology is by looking for real data on road construction projects from 2014-2018. The result is that the main causes of change orders are consistently terminated contracts, owner-induced increases, and swelling of contract items, and contract negligence. The risk of a change order is the highest in the work: Hot Asphalt Mixture, Class S Upper, Laston Wear, Stonework, Class B Upper Base, Cement Concrete Pavement, Low quality f'c 15 MPa Concrete, Stone Pairs with Mortar, Embankment Choice, Thermoplastic Road Markings.
PENYEBAB COST OVERRUN PADA PROYEK POOL BUS Harry Chou; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 9, Nomor 2, Mei 2026
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v9i2.37365

Abstract

Cost overrun is a common problem in construction projects that can cause losses for both contractors and project owners. Construction projects play an important role in supporting infrastructural development. This study aims to analyze the dominant factors causing cost overrun based on data from identification and interviews on construction projects. The research method uses a qualitative descriptive approach by analyzing cost overrun factors obtained from literature studies and the experiences of project practitioners. The research data consists of 42 factors causing cost overrun which are then analyzed based on their level of influence on project cost overruns. The results show that the dominant factors causing cost overruns include unrealistic project schedules, design inconsistencies with field conditions, construction method errors, inaccurate cost estimates, and rework. These factors cause project implementation costs to increase due to additional work, delays in implementation, and increased material and labor costs. In addition, lack of coordination between project parties and weak supervision also increase the risk of cost overruns. Efforts to control costs and minimize the risk of cost overruns in construction projects contribute to the realization of infrastructure development, including transportation services, that are efficient, high-quality and sustainable. Abstrak Cost overrun merupakan permasalahan umum dalam proyek konstruksi yang dapat menyebabkan kerugian bagi kontraktor maupun pemilik proyek. Proyek konstruksi memiliki peran penting dalam mendukung infrastructural development. Penelitian ini bertujuan untuk menganalisis faktor-faktor dominan penyebab cost overrun berdasarkan data hasil identifikasi dan wawancara pada proyek konstruksi. Metode penelitian menggunakan pendekatan deskriptif kualitatif dengan menganalisis faktor-faktor cost overrun yang diperoleh dari studi literatur dan pengalaman praktisi proyek. Data penelitian terdiri dari 42 faktor penyebab cost overrun yang kemudian dianalisis berdasarkan tingkat pengaruhnya terhadap pembengkakan biaya proyek. Hasil penelitian menunjukkan bahwa faktor dominan penyebab cost overrun meliputi jadwal proyek yang tidak realistis, ketidaksesuaian desain dengan kondisi lapangan, kesalahan metode konstruksi, estimasi biaya yang tidak akurat, dan pekerjaan ulang (rework). Faktor-faktor tersebut menyebabkan biaya pelaksanaan proyek meningkat akibat adanya pekerjaan tambahan, keterlambatan pelaksanaan, serta peningkatan biaya material dan tenaga kerja. Selain itu, kurangnya koordinasi antar pihak proyek dan lemahnya pengawasan juga meningkatkan risiko terjadinya cost overrun. Upaya pengendalian biaya dan minimalisasi risiko cost overrun pada proyek konstruksi berkontribusi terhadap terwujudnya pembangunan infrastruktur, termasuk layanan transportasi, yang efisien, berkualitas, dan berkelanjutan.
ANALISIS PENYEBAB COST OVERRUN BERDASARKAN PERBANDINGAN RAB DAN RAP PADA LIMA PROYEK GEDUNG Ahmad Septian Dewanto; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 9, Nomor 3, Agustus 2026
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v9i3.37387

Abstract

Cost overrun is a major problem in building construction projects because implementation costs may exceed the initial budget plan. This study analyzes the causes of cost overrun based on the comparison between the budget plan and the implementation budget plan in five completed building projects. The projects consist of an apartment building in Kalimantan, a bank office building in Ragunan, a campus building in Bandung, an office building in East Kalimantan’s New Capital City area, and a hospital building in Kalimantan. The method was conducted by calculating cost overrun at project and item levels, selecting items with the highest cost overrun percentage, and confirming the possible causes with five building construction experts. The results show that the highest project-level cost overrun occurred in the campus project in Bandung at 14.81%, followed by the apartment building in Kalimantan at 11.65%, the bank office building in Ragunan at 11.11%, the office building in the New Capital City at 10.68%, and the hospital building in Kalimantan at 1.37%. The dominant causes are inaccurate volume and unit price estimation, material price changes, site conditions, labor productivity, equipment and mobilization costs, and additional or changed work, supporting resilient infrastructure delivery. Abstrak Cost overrun merupakan permasalahan penting pada proyek konstruksi gedung karena biaya pelaksanaan dapat melebihi anggaran awal yang telah direncanakan. Penelitian ini menganalisis penyebab cost overrun berdasarkan perbandingan rencana anggaran biaya (RAB) dan rencana anggaran pelaksanaan (RAP) pada lima proyek gedung yang telah selesai dikerjakan. Proyek yang dianalisis terdiri dari proyek rumah susun apartemen di Kalimantan, gedung perkantoran bank di Ragunan, proyek kampus di Bandung, proyek perkantoran IKN di Kalimantan Timur, dan proyek rumah sakit di Kalimantan. Metode penelitian dilakukan dengan menghitung cost overrun pada tingkat proyek dan item pekerjaan, memilih item dengan persentase cost overrun terbesar, kemudian mengonfirmasi penyebabnya kepada lima pakar proyek gedung. Hasil penelitian menunjukkan bahwa persentase cost overrun terbesar terjadi pada proyek kampus di Bandung sebesar 14,81%, diikuti proyek rumah susun apartemen di Kalimantan sebesar 11,65%, gedung perkantoran bank di Ragunan sebesar 11,11%, proyek perkantoran IKN sebesar 10,68%, dan proyek rumah sakit di Kalimantan sebesar 1,37%. Penyebab dominan meliputi ketidaktepatan estimasi volume dan harga satuan, perubahan harga material, kondisi lapangan, produktivitas tenaga kerja, biaya peralatan dan mobilisasi, serta pekerjaan tambah atau perubahan pekerjaan. Hasil ini mendukung pengendalian biaya pada proyek gedung sebagai bagian dari resilient infrastructure.
Causes Of Cost Overrun In Building Construction Projects Mega Waty; Juliastuti Juliastuti
JURNAL TEKNIK SIPIL CENDEKIA (JTSC) Vol 7 No 4 (2026): October
Publisher : Departement of Civil Engineering, Universitas Winaya Mukti

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Cost Overrun is a persistent problem in both developed and developing countries, causing financial losses, difficulties, project delays, and possibly even project failure. The project cost overrun on 4 buildings is quite large and encourages the search for the cause of the project cost overrun, which not only includes 4 buildings but also other equivalent building projects. Through interviews and distribution of questionnaires that have previously been validated by several experts so that the questionnaire is valid. Distribution was carried out and received a return of 37 respondents. The result is that there are 20 valid indicators and the causes of cost overrun are obtained from RII calculations by placing the 8 largest ranks on 11 indicators, with the biggest causes of Cost Overrun being Lack of control and control of material quality, shortage of labor, weak logistics supervision resulting in loss of materials, inflation and escalation of material prices, high rental or purchase prices for equipment due to not conducting a survey first, Lack of construction materials, poor productivity and quality of human resources, additional work due to changes in design and drawings, work instructions that are not understood properly, by paying attention to the highest to lowest variables, the main one is material, the second highest is equipment, the third highest is labor, and the lowest rank is other variables