DAMPAK CHANGE ORDER PROYEK KONSTRUKSI BANGUNAN GEDUNG BERTINGKAT SEDANG Kevin Daniel Lakaoni; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.21974

Abstract

The construction of medium-rise building construction projects in Indonesia is increasing and spreading throughout the region. In general, construction projects often experience changes in their implementation. Such changes can occur at the suggestion of the owner, contractor or consultant. Changes to a project in its execution are often known as change order. Change orders are brought on by a variety of things, including insufficient equipment, changing the scope of the job, altering the plan drawings, and variations between the field conditions and the drawing design. It's important to understand the effects of change orders in order to decrease their frequency. This study's objective is to ascertain the impact of change orders on medium-rise building construction projects. To that end, it has been broken down into a number of different variables, including cost, quality, time, organization, and others, and then put together into a questionnaire. There were 30 people that responded to the survey that was given out. The Partial Least Squares approach was used to do the analysis (Smart PLS 4.0 software). Change orders were shown to significantly affect cost and other factors in medium-rise buildings. Abstrak Pembangunan proyek konstruksi gedung bertingkat di Indonesia semakin bertambah banyak dan tersebar luas ke seluruh daerah. Pada umumnya proyek konstruksi sering mengalami perubahan dalam pelaksanaannya. Perubahan tersebut dapat terjadi atas ajuan dari pemilik, kontraktor ataupun konsultan dan harus disetujui oleh semua pihak. Perubahan pada proyek dalam pelaksanaannya sering dikenal sebagai change order. Change order disebabkan oleh beberapa faktor seperti perbedaan kondisi lapangan dengan gambar desain, perubahan lingkup pekerjaan, perubahan gambar rencana, peralatan yang tidak memadai dan lain-lain. Untuk mengurangi terjadinya change order maka perlu untuk mengetahui dampak dari change order. Change order memiliki dampak yang berbeda-beda pada setiap proyek. Riset ini bertujuan untuk mengenali dampak atau akibat change order pada proyek konstruksi bangunan gedung bertingkat sedang. Dampak change order dipecah dalam lima kategori yaitu biaya, mutu, waktu, organisasi serta lainnya kemudian disusun menjadi suatu kuesioner. Penyebaran kuesioner dilakukan dengan jumlah 30 responden. Dari hasil penyebaran kuesioner tersebut maka dilakukan pengolahan data menggunakan metode Partial Least Square (aplikasi Smart PLS). Setelah dilakukan analisis diperoleh bahwa change order berdampak signifikan terhadap variabel biaya dan lainnya pada proyek konstruksi bangunan gedung bertingkat sedang dengan nilai path coefficient sebesar 0,669 atau 66,9% untuk biaya dan 0,437 atau 43,7% untuk lainnya.
PENGARUH LINGKUNGAN KERJA, PELAKSANAAN K3, DAN TENAGA KERJA TERHADAP PRODUKTIVITAS TENAGA KERJA Vincentsius Wijaya; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.21975

Abstract

Human resources play a significant role in an industry. In the implementation of the construction process or the process of building high-rise buildings, safety and health in construction work (K3), sufficient work areas, and a trained workforce are prioritized. So that workers can feel comfortable and safe in carrying out any construction work. With the existence of quality human resources so that it can affect the labor productivity of an industry. K3 is one of the significant aspects that can affect labor productivity. A messy or unconducive work area greatly affects the performance of workers. Labor is needed in every job done. If the selected workforce is not trained or does not meet the job criteria, it can affect labor productivity. This research was carried out by distributing questionnaires to construction workers with the aim of examining the influence exerted on the dependent variable by means of information processing using Partial Least Square (PLS) where several tests were carried out to find out what influences could have an impact on labor productivity. After analysis, it was found that the work area and labor variables had an effect on labor productivity. Abstrak Sumber daya manusia memegang peranan berarti dalam suatu industri. Dalam penerapan proses konstruksi atau proses pembangunan gedung gedung tinggi sangat diutamakan keselamatan serta kesehatan kerja konstruksi( K3), area kerja yang mencukupi, dan tenaga kerja yang telah terlatih. Sehingga para pekerja bisa merasa nyaman serta aman dalam melaksanakan sesuatu pekerjaan konstruksi. Dengan terdapatnya sumber daya manusia yang bermutu sehingga dapat mempengaruhi produktivitas tenaga kerja suatu industri. K3 ialah salah satu aspek berarti yang dapat mempengaruhi produktivitas tenaga kerja. Area kerja yang berantakan ataupun tidak kondusif sangat mempengaruhi kinerja para pekerja. Tenaga kerja sangat diperlukan dalam setiap pekerjaan yang dilakukan. Bila tenaga kerja yang diseleksi tidak terlatih ataupun tidak penuhi kriteria pekerjaan, maka dapat mempengaruhi produktivitas tenaga kerja. Riset ini dilakukan dengan menyebarkan kuisioner kepada para pelaku konstruksi yang bertujuan untuk meneliti pengaruh yang diberikan terhadap variabel terikat dengan tata cara pengolahan informasi memakai Partial Least Square (PLS) dimana dilakukan beberapa uji untuk dapat mengetahui pengaruh apa saja yang dapat berakibat pada produktivitas tenaga kerja. Setelah dilakukan analisis diperoleh bahwa variabel area kerja dan tenaga kerja berpengaruh terhadap produktivitas tenaga kerja.
PENERAPAN METODE EARNED VALUE DAN EARNED SCHEDULE PELAKSANAAN PROYEK RUMAH SAKIT X DI BANDUNG Reynaldo Farrel Fausta Tangtobing; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.22251

Abstract

A construction project is a series of activities carried out to construct a building within a specified period. Delay in construction projects is a problem that often occurs so that these constraints make the project implementation time not as specified. The success of project management is based on proper project control. This research is based on real data from one of the hospital projects in Bandung. The purpose of this study is to estimate the project completion time using the Earned Value and Earned Schedule methods. Calculations were made in 3 conditions, namely at the 30th week, the 45th week, and the 49th week. Based on the results of calculations using the Earned Value method, the project completion time is in the 30th week for 51.5 weeks or 3.5 weeks late from the 48-week planned time. In the 45th week, the project completion time was obtained for 48.35 weeks or 0.35 weeks late from the planned time of 48 weeks. And in the 49th week, the project completion time was obtained for 52.01 weeks or 0.01 weeks late from the planned time of 52 weeks. Meanwhile, based on the results of calculations using the Earned Schedule method, the project completion time was obtained in the 30th week for 53.184 weeks. In the 45th week, the project completion time was 51,537 weeks. In the 49th week, the project completion time was 52.136 weeks. Abstrak Proyek konstruksi merupakan suatu rangkaian kegiatan yang dilakukan untuk membangun suatu bangunan dalam jangka waktu yang ditetapkan. Keterlambatan dalam proyek konstruksi adalah suatu masalah yang sering terjadi  sehingga kendala tersebut membuat waktu pengerjaan pelaksanaan proyek tidak sesuai dengan yang ditetapkan. Keberhasilan manajemen proyek didasari oleh pengendalian proyek yang tepat. Penelitian ini berdasarkan data riil salah satu proyek rumah sakit di Bandung. Tujuan dari penelitian ini untuk memperkirakan waktu selesai proyek menggunakan metode Earned Value dan Earned Schedule. Perhitungan dilakukan pada 3 kondisi yaitu pada minggu ke-30, minggu ke-45, dan minggu ke-49. Berdasarkan hasil perhitungan dengan metode Earned Value didapatkan waktu penyelesaian proyek pada minggu ke-30 selama 51,5 minggu. Pada minggu ke-45 didapatkan waktu penyelesaian proyek selama 48,35 minggu. Dan pada minggu ke-49 didapatkan waktu penyelesaian proyek selama 52,01 minggu. Sedangkan  berdasarkan hasil perhitungan dengan metode Earned Schedule didapatkan waktu penyelesaian proyek pada minggu ke-30 selama 53,184 minggu. Pada minggu ke-45 didapatkan waktu penyelesaian proyek selama 51,537 minggu. Pada minggu ke-49 didapatkan waktu penyelesaian proyek selama 52,136 minggu. Hasil perkiraan waktu akhir proyek dengan metode Earned Value lebih akurat daripada metode Earned Schedule. Tetapi berdasarkan hasil perhitungan minggu ke-45 metode Earned Schedule lebih akurat terhadap waktu aktual selesai proyek.
PENYEBAB CHANGE ORDER PROYEK KONSTRUKSI RUMAH SAKIT Daniel Daniel; Mega Waty
JMTS: Jurnal Mitra Teknik Sipil Volume 6, Nomor 2, Mei 2023
Publisher : Prodi Sarjana Teknik Sipil, FT, Universitas Tarumanagara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24912/jmts.v6i2.22252

Abstract

The number of hospital construction projects in Indonesia continues to grow. The main reason is because Indonesia's territory is getting denser, so it is necessary to develop supporting facilities to keep up with this development. In a construction project there are three important things in a construction project to focus on, namely quality, cost and time. In order for these three important elements to be carried out, an agreement must be made which must be agreed upon and regulated by the parties involved in accordance with the applicable provisions and in the form of a contract. In a project there may be a change in the contract caused by several predictable and unexpected variables, these changes are known as change orders. Change orders are common and unavoidable in every construction project, both government construction projects and private construction projects. To reduce the occurrence of change orders, it is necessary to know the factors that cause changes in contracts in hospital construction projects. Factors that cause change orders are compiled into a questionnaire to find out the main causes of change orders. Questionnaires were distributed to owners, consultants and contractors who are experienced in hospital construction projects in the Bandung area. This questionnaire will be processed using the Partial Least Square method and using the smartPLS 3.0 application. It was found that the construction factor affected the change order in hospital construction projects with a path coefficient value of 0.702 or 70.2%. Abstrak Jumlah proyek konstruski rumah sakit di Indonesia terus berkembang. Alasannya dikarenakan wilayah Indonesia yang semakin padat, dan dibutuhkanlah pengembangan fasilitas-fasilitas pendukung untuk mengikuti perkembangan tersebut. Pada proyek konstruksi terdapat tiga hal penting yang menjadi fokus, yaitu mutu, biaya dan waktu. Agar ketiga unsur itu dapat terwujud, dibuat suatu kontrak yang disepakati dan diatur oleh pihak yang terlibat sesuai dengan ketentuan yang berlaku. Pada suatu proyek bisa terjadi perubahan kontrak yang disebabkan oleh beberapa variabel terduga maupun variabel yang tidak terduga, perubahan tersebut dikenal dengan istilah change order. Change order merupakan hal umum dan tidak dapat dihindari dalam setiap proyek konstruksi, baik proyek konstruksi pemerintah maupun proyek konstruksi swasta. Untuk mengurangi terjadinya change order, maka perlu mengetahui faktor penyebab perubahan kontrak pada proyek konstruksi rumah sakit. Faktor penyebab change order disusun menjadi kuesioner guna mengetahui penyebab utama dari change order. Penyebaran kuesioner dibagikan kepada para pemilik, konsultan, serta kontraktor yang berpengalaman dalam proyek konstruksi rumah sakit di wilayah Bandung. Kuesioner ini diolah dengan menggunakan metode Partial Least Square dan menggunakan aplikasi smartPLS 3.0. Diperoleh bahwa faktor  konstruksi berpengaruh terhadap change order pada proyek konstruksi rumah sakit dengan nilai path coefficient sebesar 0,702 atau 70,2%.