Claim Missing Document
Check
Articles

Found 14 Documents
Search

ANALISIS KECEPATAN KENDARAAN DAN KINERJA RUAS JALAN RAYA KAPAL AKIBAT AKTIVITAS RUMAH SAKIT MANGUSADA KAPAL, MENGWI, BADUNG I KETUT SUDIPTA GIRI; I GUSTI AGUNG GDE SURYADARMAWAN; NI KETUT SRI ASTATI SUKAWATI
GANEC SWARA Vol 17, No 3 (2023): September 2023
Publisher : Universitas Mahasaraswati K. Mataram

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.35327/gara.v17i3.564

Abstract

Mangusada Hospital is one of the hospitals in Badung Regency, which is located in Kapal Village. Hospital activities during operating hours will directly affect the smoothness of traffic on the roads around the hospital caused by the activity of entering and leaving vehicles to or from the hospital. To find out the performance of the Ship Highway section, a research was conducted in the area for three days, namely Monday and Friday representing working days, Sunday representing holidays. Analysis of road performance using the 1997 MKJI calculation procedure for urban road sections. Based on the results of data analysis it is known that the highest vehicle traffic volume on Monday was 3046.05 pcu/hour occurred at 07.15 WITA -08.15 WITA, on Friday it was 2802 pcu/hour occurred at 07.00 WITA - 08.00 WITA, Sunday at 2372.9 pcu/hour occurred at 16.45 WITA - 17.45 WITA. The level of road service during Monday's peak hour was at level C with a degree of saturation value of 0.59, the average speed of light vehicles reached 39 km/hour. The condition of the vehicles at the road service level illustrates that traffic flow conditions are still stable, travel speed and freedom of movement are affected by the large volume of traffic so that the driver can no longer choose the desired speed
Evaluasi Kebutuhan Ruang Parkir Di Pasar Burung Satria Denpasar Ni Ketut Sri Astati Sukawati; I Gusti Agung Gde Suryadarmawan; I Wayan Gede Darma Yoga; Christianto Imanuel Madi Mase
Jurnal Ilmiah Kurva Teknik Vol. 12 No. 2 (2023): Jurnal Ilmiah Kurva Teknik
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Mahasaraswati Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36733/jikt.v12i2.7902

Abstract

Fasilitas parkir di Pasar Burung Satria Denpasar terdapat permasalahan mendasar, seperti parkir kendaraan yang tidak teratur atau penggunaan tempat parkir yang tidak berdasarkan stall yang ada. Penelitian ini dilaksanakan bertujuan untuk menghitung kebutuhan ruang parkir di Pasar Burug Satria Denpasar.Adapun Jenis dan sumber data yang digunakan dalam penelitian ini adalah data primer dengan melakukan pengamatan langsung dilapangan, Untuk Pengamatannya dilakukan selama Tiga Hari yaitu pada Hari Selasa,Sabtu dan Minggu. Dari hasil pengamatan secara langsung dilapangan selanjutnya dilakukan analisis untuk mendapatkan Volume Parkir,Petak Parkir,Durasi Parkir danKebutuhan Ruang Parkir dari hasil analisis di dapat untuk Volume maximum Kendaraan Roda Dua untuk Hari Selasa berada pada Sore hari dengan jumlah Kendaraansebanyak 208 Kendraan dan pada Hari Sabtu jumlah Kendaraannya sebanyak 318 untuk Sore hri dan Pada Hari Minggu Jumlah Maximumnya 325 Kendaraan Pada Sore. Dan Volume maximum Kendaraan Roda Empat utuk hari selasa terjadi pada sore hari dengan jumlah kendaraan 4 kendaraan dan pada hari sabtu terjadi pada sore dengan jumlah kendaraan sebanyak 5 kendaraan dan pada minggu sore terjadi pada pagi hari dengan 4 kendaraan Sedangkan Rata-rata durasi parkir untuk motor adalah 37,42 menit dan rata-rata durasi parkir untuk mobil adalah 60,26 menit dan Rata-rata kebutuhan ruag parkir motor sebanyak 48,44 petak dan rata-rata kebutuhan ruang parkir untuk mobil adalah 2,16 petak
Identifikasi Penerapan Green Construction Pada Proyek Konstruksi Praganingrum, Tjokorda Istri; Ni Luh Made Ayu Mirayani Pradnyadari; Ida Bagus Suryatmaja; I Gusti Agung Gde Suryadarmawan; Ni Nyoman Intan Sawitri Saraswati; Putu Ananda Raga Utama6
Jurnal Permukiman Vol 18 No 1 (2023)
Publisher : Direktorat Bina Teknik Bangunan Gedung dan Penyehatan Lingkungan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31815/jp.2023.18.45-52

Abstract

Green construction sebagai upaya mewujudkan sustainable construction diharapkan dapat meminimalkan dampak negatif terhadap lingkungan serta memberikan kenyamanan pada pengguna bangunan. Namun pada kenyataannya belum semua proses pembangunan menerapkan green construction. Sehubungan dengan hal tersebut dilakukan penelitian pada proyek Pasar Gianyar, dimana pasar ini merupakan salah satu terobosan Kabupaten Gianyar dalam merubah kesan pasar tradisional sekaligus upaya penerapan green building. Penelitian ini menggunakan metode observasi lapangan dan kuesioner dengan 28 responden. Bertujuan untuk mengetahui indikator green construction yang sudah maupun belum diterapkan dalam sebuah proyek konstruksi. Hasil observasi dokumentasi kegiatan dengan 142 indikator, hanya 65 indikator yang memiliki dokumentasi sedangkan 77 indikator lainnya tidak.  Hasil analisis kuesioner aspek green construction menunjukkan penerapan tertinggi adalah pada Faktor 12 Pengelolaan Lahan dan penerapan terendah pada Faktor 3 Kualitas Udara Tahap Konstruksi dan Faktor 8 Pelatihan bagi Subkontraktor. Jika dilihat penerapan aspek, penerapan tertinggi dilihat dari A1 Keselamatan dan Kesehatan Kerja dengan 71%, penerapan aspek terendah terdapat pada A2 Kualitas Udara dan Kenyamanan sebesar 34%, dengan rata-rata penerapan aspek adalah 52,8%. Hasil penelitian ini dapat digunakan untuk melakukan evaluasi terhadap kesiapan metode dan kelengkapan peralatan pelaku konstruksi dalam penerapan green construction dan rekomendasi penguatan turunan peraturan tentang pelaksanaan green construction.
Perhitungan Prosentase Kelulusan Emisi Gas Buang Terhadap Kendaraan Bermotor Roda 4 dengan Bahan Bakar Bensin Ni Ketut Sri Astati Sukawati; I Gusti Agung Gde Suryadarmawan; I Wayan Gede Darma Yoga; Ni Komang Ayu Windisari
Jurnal Ilmiah Kurva Teknik Vol. 13 No. 2 (2024): Jurnal Ilmiah Kurva Teknik
Publisher : Program Studi Teknik Sipil Fakultas Teknik Universitas Mahasaraswati Denpasar

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36733/jikt.v13i2.10231

Abstract

Kebutuhan alat transportasi di Indonesia, terus meningkat seiring dengan bertambahnya jumlah penduduk setiap tahun. Kesadaran masyarakat akan pencemaran udara akibat emisi gas buang kendaraan bermotor di kota – kota besar seperti Kota Denpasar saat ini makin rendah. Salah satu cara pengendalian tersebut adalah dengan melakukan uji emisi gas buang pada kendaraan bermotor beroda empat berbahan bakar bensin di Kota Denpasar tepatnya di kawasan Terminal Ubung. Tujuan utama dari penelitian ini adalah untuk mengetahui prosentase kelulusan emisi gas buang kendaraan bermotor yang berupa CO dan HC produksi tahun < 2007 dan >2007. Berdasarkan penelitian yang telah dilaksanakan, diperoleh hasil pengukuran kadar emisi gas buang yang berupa CO dan HC pada kendaraan roda empat berbahan bakar bensin dengan sistem pembakaran karburator ataupun injeksi tergantung variable tahun produksinya yang melebihi dari ambang batas yang ditentukan, yaitu kadar CO karburator < 2007 berjumlah 47,7 %, kadar CO injeksi produksi < 2007 berjumlah 33,33 %, kadar CO injeksi produksi >2007 berjumlah 10,20 %, kadar HC karburator < 2007 berjumlah 0 %, kadar HC injeksi produksi < 2007 berjumlah 0 %, kadar HC injeksi produksi >2007 berjumlah 8,20%.