Claim Missing Document
Check
Articles

Found 6 Documents
Search

ANALISIS KETERKAITAN ANTARA GREEN DESIGN, GREEN PROCESS, GREEN DYNAMIC CAPABILITIES, DAN ABSORPTIVE CAPACITY PADA PERUSAHAAN MANUFAKTUR Aviasti Aviasti; Asep Nana Rukmana; Agus Nana Supena; Reni Amaranti
J@ti Undip: Jurnal Teknik Industri Vol 17, No 2 (2022): Mei 2022
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (388.985 KB) | DOI: 10.14710/jati.17.2.62-70

Abstract

Green manufacturing mulai diimplementasikan secara luas pada industri manufaktur untuk mengurangi dampak negatif kegiatan industri pada lingkungan. Berbagai faktor, baik eksternal maupun internal, mempengaruhi implementasi green manufacturing. Hal ini menyebabkan implementasi green manufacturing tidak mudah untuk dilakukan. Penelitian ini membahas keterkaitan faktor internal perusahaan pada praktik green manufacturing, yaitu keterkaitan antara kapabilitas dinamis hijau perusahaan, kemampuan untuk menyerap pengetahuan (absorptive capacity) dan green manufacturing (dalam hal ini terdiri dari green design dan green process). Penelitian dilakukan pada 34 perusahaan manufaktur di Jawa Barat, Indonesia. Model penelitian terdiri dari empat konstruk dengan lima hipotesis keterkaitan antar konstruk. Hasil pengujian model menunjukkan bahwa green dynamic capability berpengaruh positif dan signifikan terhadap green process akan tetapi tidak berpengaruh pada green design. Absorptive capacity berpengaruh signifikan terhadap green dynamic capabilities dan berpengaruh secara tidak langsung terhadap green process. Hal ini menunjukkan bahwa kapabilitas dinamis berperan memediasi hubungan absorptive capacity dengan green process.
Manajemen Kurikulum dan Sistem Penilaian di Sekolah Tinggi Pariwisata Bandung Wahyudin Wahyudin; Hanafiah Hanafiah; Agus Nana Supena
Foramadiahi: Jurnal Kajian Pendidikan dan Keislaman Vol 13, No 1 (2021): Edisi Juni 2021
Publisher : IAIN Ternate

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (686.989 KB) | DOI: 10.46339/foramadiahi.v13i1.419

Abstract

This research aims to find out how the BandungTourism College in theimplementation of the curriculum management systemand assessment has beenrunning according to procedures and even supervised directly from the CentralMinistry of Tourism, this makes STP Bandung a Tourism College which has a big namein the field of tourism in Indonesia. In particular, this study aims to obtain informationand empirical analysis of: 1) learning management at STPBandung. 2) curriculum atSTP Bandung 3) assessment of learning at STPB Bandung
Perancangan Sistem Informasi Manajemen Persediaan Bahan Baku CV. X Rizky Agung Ramdhani; Agus Nana Supena
Jurnal Riset Teknik Industri Volume 2, No. 1, Juli 2022, Jurnal Riset Teknik Industri (JRTI)
Publisher : UPT Publikasi Ilmiah Unisba

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (932.308 KB) | DOI: 10.29313/jrti.v2i1.961

Abstract

Abstract. CV. X is a manufacturing industry company that produces motorcycle spare parts and provides spare parts for two-wheeled vehicles. Warehouse data recording activities still require calculating material stock and putting it on the white board as a place to store data and different physical documents. This incident hampered the process of receiving and disbursing the warehouse, which required purchases to wait if the warehouse had recorded the required physical documents related to inventory data in physical documents, so that data entry was not updated directly which could later affect other parts. Based on this phenomenon, the problems in this study are as follows: (1) How are the business processes carried out by CV. X? (2) How to design an inventory information system needed by CV. X?. The research stages follow the stages of the Framework for the Application of System Thinking (FAST) framework to the stage of database and interface development (Construction & Testing). One option that can be done in solving this problem is to build an inventory management information system that can provide accurate, fast and precise availability of goods without continuous waiting time. The results obtained are the raw material inventory system in the warehouse in the form of a website-based application. Abstrak. CV. X merupakan perusahan industri manufaktur yang memproduksi alat-alat sparepart motor dan menyediakan suku cadang kendaraan roda dua. Aktivitas perekapan data gudang masih mengharuskan melakukan perhitungan stok material dan menuliskan diwhite board sebagai tempat penyimpanan data serta dokumen fisik yang berbeda. Perisitiwa ini menghambat proses transaksi penerimaan dan pengeluaran pada gudang yang mengharuskan bagian purchasing menunggu apabila bagian gudang sudah melakukan pencatatan dokumen fisik yang dibutuhkan terkait data persediaan dalam penyerahan dokumen fisik, sehingga pengisian data tidak terupdate secara langsung yang nantinya dapat mempengaruhi bagian lainnya. Berdasarkan fenomena tersebut, maka permasalahan dalam penelitian ini dirumuskan sebagai berikut: (1) Bagaimana proses bisnis yang dilakukan oleh CV. X? (2) Bagaimana merancang sistem informasi persediaan yang dibutuhkan CV. X?. Tahapan penelitian mengikuti tahapan-tahapan kerangka kerja Framework for the Application of System Thinking (FAST) sampai dengan tahapan pembangunan basis data dan antarmuka (Construction & Testing). Salah satu opsi yang dapat dilakukan dalam menyelesaikan masalah tersebut adalah dengan membangun sistem informasi manajemen persediaan yang dapat memberikan ketersediaan barang secara akurat, cepat dan tepat tanpa waktu menunggu secara terus menerus. Hasil yang diperoleh yaitu sistem informasi persediaan bahan baku pada gudang dalam bentuk aplikasi berbasis website.
Usulan Perbaikan Kualitas Pelayanan di Rumah Sakit Umum Daerah Lembang Maulana Djayakusuma; Dewi Shofi Mulyati; Agus Nana Supena
Bandung Conference Series: Industrial Engineering Science Vol. 2 No. 1 (2022): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (352.498 KB) | DOI: 10.29313/bcsies.v2i1.244

Abstract

Abstract. The Lembang Regional General Hospital is located at Jalan Raya Lembang KM 11.4 No. 11, Gudangkahuripan, Lembang which is engaged in health services. Lembang Regional General Hospital provides health services. There is a problem at the Lembang Regional General Hospital, namely the rating of the Lembang Regional Hospital has a small rating among hospitals in the city of Bandung with a rating of 2.3. In addition to rating, the problems that occur at the Lembang Regional General Hospital, namely the service performance at the Lembang Regional General Hospital means that the old community's lack of trust in the Lembang Regional Hospital is still high. The purpose of this study was to analyze and identify service attributes on service quality at Lembang Hospital with the Kano method and the ServQual method so as to provide the best proposal to the parties concerned in an effort to reduce complaints from consumers. The purpose of this study was to analyze and identify service attributes on service quality at Lembang Hospital with the Kano method and the ServQual method so as to provide the best proposal to the parties concerned in an effort to reduce complaints from consumers. The methodology used is the Kano Model Method and the ServQual (Service Quality) Method. The Kano Model method is used to determine the Kano Category which consists of: Attractive, One Dimensional, Must be, No difference (Indifferent), Returned (Reverse) and Questionable. The ServQual (Service Quality) method is used to determine the gap between the company's performance and customer expectations. Based on these two methods, actions can be generated on service attributes, namely services that are maintained, improved and improved.The results showed 1) From the results of the open questionnaire obtained 20 service attributes contained in the Lembang Regional Hospital based on the dimensions of service quality, namely Tangible, Empathy, Reliability, Responsiveness and Assurance. Abstrak. Rumah Sakit Umum Daerah Lembang bertempat di Jalan Raya Lembang KM 11,4 No. 11, Gudangkahuripan, Lembang yang bergerak dalam jasa kesehatan. Rumah Sakit Umum Daerah Lembang menyediakan pelayanan kesehatan. Terdapat permasalahan di Rumah Sakit Umum Daerah Lembang yaitu ratting dari Rumah Sakit Daerah Lembang memiliki ratting yang kecil diantara Rumah Sakit di Kota Bandung dengan ratting 2,2. Selain ratting, permasalahan yang terjadi pada Rumah Sakit Umum Daerah Lembang yaitu pada pada kinerja pelayanan di Rumah Sakit Umum Daerah Lembang berarti kekurangan kepercayaan masyarakat lama pada Rumah Sakit Daerah Lembang masih tinggi. Tujuan penelitian ini adalah untuk menganalisis dan mengidentifikasi atribut layanan terhadap kualitas pelayanan di RSUD Lembang dengan metode Kano dan metode ServQual sehingga dapat memberikan usulan terbaik terhadap pihak yang bersangkutan dalam upaya untuk mengurangi keluhan dari konsumen. Metode yang digunakan adalah Metode Model Kano dan Metode ServQual (Service Quality). Metode Model Kano digunakan untuk mengetahui Kategori Kano yang terdiri dari: Menarik (Attractive), Satu Dimensi (One Dimensional), Harus (Must be), Tidak ada perbedaan (Indifferent), Dikembalikan (Reverse) dan Dipertanyakan (Questionable). Adapun Metode ServQual (Service Quality) digunakan untuk mengetahui kesenjangan antara kinerja perusahaan dengan harapan pelanggan. Berdasarkan kedua metode tersebut dapat dihasilkan tindakan pada atribut pelayanan yaitu pelayanan yang dipertahankan, ditingkatkan dan diperbaiki. Hasil penelitian menunjukan 1) Dari hasil kuesioner terbuka didapatkan 20 atribut pelayanan yang terdapat pada Rumah Sakit Daerah Lembang berdasarkan dimensi kualitas jasa yaitu Tangible, Emphaty, Reliability, Responsiveness dan Assurance;
Implementasi Metode Human Resource Scorecad untuk Meningkatkan Kinerja Kerja Karyawan di PT Kinlaus Sukses Indoneisa (KS Group): jurnal spesia ellgandireza selay; M. Dzikron; Agus Nana Supena
Bandung Conference Series: Industrial Engineering Science Vol. 3 No. 1 (2023): Bandung Conference Series: Industrial Engineering Science
Publisher : UNISBA Press

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/bcsies.v3i1.6918

Abstract

Abstract. The growth of the food and beverage industry sector in Indonesia is increasing rapidly, especially in West Java because of the high population so that the KS Group Bandung company is required to meet the needs of the community, in supporting the needs of the community, adequate human resources are needed to support the success of the company's vision and mission, but the company has problems in the work performance of employees who do not support, resulting in a decrease in the quality of work owned by the company so that it hampers the company's vision and mission and optimization of performance such as increasing employee work delays, declining turnover, product complaints from consumers. Viewed from the aspect of the company's organization, the company is categorized as a medium industry based on the income and also the value of the company's investment. This research was conducted to design and measure the work performance of employees using the Human Resources Scorecard method. Human Resource Scorecard is a performance measurement system of Human Resources related to people, strategy and company performance in order to form a superior competitive company. The method applied to measure the extent of employee performance and is also useful for scientifically developing the company's human resources. There are four perspectives in measuring the Human Resource Scorecard, namely the financial, customer, internal business process and learn & growth perspectives. The stages of this research are the first to identify KPIs based on the company's business strategy, the second is to design an objective strategy to define the value creation process or the clarity of the organization's strategy to determine the steps for implementing the strategy. The third is to do indicator weighting, the weighting stage is done using expert choice software 11. Fourth, the scoring system is carried out using the higher is better, lower is better method. The five scoring system results obtained were categorized using the Traffic Light System method. The results of the study were 10 KPs divided into 2 financial KPIs, 3 customer KPIs, 2 internal bussiners process KPIs, and 3 Learning & Growth KPIs. From the results of the calculation of the weight score of the employee's performance in the company as a whole in each perspective, namely 60.7%, which means that the score obtained is the need for improvement and performance improvement. The results of the 10 KPO measurements obtained are divided into several categories, namely 2 KPIs in the red category, 6 in the yellow category, 2 in the red category. KPIs categorized as red indicate that the company's targets are still far from expectations, therefore the company must improve the KPIs and evaluate them in order to realize the company's vision and mission. The next research is to design employee performance using an assessment form, namely from a questionnaire, the second uses weighting with expert choice 11 and an employee performance appraisal data management form. Abstrak. Pertumbuhan sektor industri makanan dan minuman di Indonesia meningkat pesat khususnya di Jawa Barat karena populasi masyarakat yang tinggi sehingga perusahaan PT Kinlaus Sukses Indonesia dituntut memenuhi kebutuhan masyakarat, dalam menunjang kebutuhan masyarakat diperulukan Sumber Daya Manusia yang memadai guna mendukung keberhasilan visi dan misi perusahaan. Namum dalam hal ini perusahaan memiliki masalah didalam kinerja kerja karyawannya yang tidak mendukung, mengakibatkan turunnya kualitas kerja yang di miliki perusahaan sehingga memperhambat visi dan misi perusahaan dan optimalisasi kinerja seperti meningkatnya keterlambatan kerja karyawan, omset menurun, tingkat komplain produk dari konsumen. Dilihat dari aspek organisasi perusahaan, perusahaan dikategorikan industri menengah berdasarkan pendapatan dan juga nilai investasi perusahaan. Penelitan ini dilakukan untuk merancan dan juga mengukur kinerja kerja karyawan menggunakan metode Human Resources Scorecard. Human Resource Scorecard merupakan sistem pengukuran kinerja SDM yang berkaitan dengan orang, strategi serta kinerja perusahaan guna membentuk perusahaan berdaya saing yang unggul. Metode yang terapkan untuk mengukur sejauh mana kinerja karyawan serta juga berguna untuk mengembangkan sumber daya manusia yang dimiliki perusahaan secara ilmiah. Terdapat empat prespektif dalam pengukuran Human Resource Scorecard yaitu perspektif financial, customer, internal bussines process dan learn & growth. Tahapan penelitian ini pertama mengidentifikasi KPI berdasarkan strategis bisnis perusahaan, kedua merancang strategi objektif untuk mendefinisikan proses penciptaan nilai atau kejelasan strategi organisasi menetapkan langkah langkah untuk pelaksanaan strategi. Ketiga yaitu melakukan pembobotan Indikator, tahapan pembobotan dilakukan dengan menggunakan software expert choice 11. Keempat dilkukan scoring system dengan metode higher is better, lower is better. Kelima hasil scoring system yang diperoleh dilakukan pengkatagorian dengan menggunakan metode Traffic Light System. Hasil dari penelitian sebanyak 10 KPI terbagi 2 KPI financial, 3 KPI customer, 2 KPI Internal bussiners process, dan 3 KPI Learning & Growth. Dari hasil perhitungan bobot skor kinerja karyawan di perusahaan secara menyeluruh pada setiap presfektif yaitu 60,7% yang artinya skor tersebut perlunya perbaikan dan peningkatan kinerja. Hasil pengukuran 10 KPI yang diperoleh terbagi atas beberapa kategori, yaitu 2 KPI dalam kategori merah, 6 dalam kategori kuning, 2 dalam kategori merah. KPI yang berkategori merah menandakan target diperusahaan masih jauh dari harapan, oleh karena itu perusahaan harus memperbaiki KPI tersebut dan evaluasi guna mewujudkan visi dan misi perusahaan. Penelitan selanjutnya dengan merancang kinerja karyawan dengan menggunakan form penilaian yaitu from kueisioner, yang kedua menggunakan pembobotan dengan expert choice 11 dan form pengelolahan data penilaian kinerja karyawan.
Usulan Perencanaan Produksi dengan Pendekatan Material Requirement Planning (MRP) Afif Syarifuddin Muflih; Reni Amaranti; Agus Nana Supena
Jurnal Riset Teknik Industri Volume 4, No. 1, Juli 2024, Jurnal Riset Teknik Industri (JRTI)
Publisher : UPT Publikasi Ilmiah Unisba

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29313/jrti.v4i1.3845

Abstract

Abstract. PT Nazar Aneka Warna is a manufacturing company that focuses on the production of wall paint with pail (bucket) and kilo units, this company implements a make-to-stock marketing strategy. Based on the research that has been conducted, there are problems that currently occur, namely the number of overproduction products that cause accumulation, and the company does not have a raw material procurement plan for future production needs. As a result of the problem of overproduction, it can cause the product to expire if stored for a long period of time, the expired product needs to be reprocessed so that it can be marketed again, which will increase the expenditure of greater costs. Indications of the problems encountered are due to the low level of accuracy of demand forecasting and excessive production levels in meeting market demand so that the number of return products is found due to unsold products, and does not have strategic planning for raw material procurement schedules for production needs. The proposed research is a production plan with Material Requirement Planning (MRP) approach. The results that have been obtained include demand forecast data for the next period with the selected method, namely Double Exponential Smoothing Holt and has been validated with a Moving Range Chart (MRC) graph, aggregate production plan data with a total production cost of Rp 264.752.418, master production schedule data for each product, and raw material procurement schedule data with lot sizing at level 1 and level 2 using the selected method, namely Period Order Quantity (POQ) which results in inventory costs that need to be incurred of Rp 166.751.807.508. Abstrak. PT Nazar Aneka Warna merupakan perusahaan manufaktur yang berfokus pada produksi cat tembok dengan satuan pail (ember) dan kiloan, perusahaan ini menerapkan strategi pemasaran secara make to stock. Berdasarkan penelitian yang telah dilakukan, ditemui permasalahan yaitu terdapat sejumlah produk stok yang berlebih (overproduction) sehingga menyebabkan penumpukan, serta perusahaan tidak memiliki rencana pengadaan bahan baku untuk keperluan produksi pada masa yang akan datang. Akibat permasalahan dari overproduction dapat menyebabkan produk menjadi kedaluwarsa jika tersimpan dalam jangka waktu yang panjang, apabila produk kedaluwarsa diperlukan reprocessing agar dapat dipasarkan kembali yang mana akan menambah pengeluaran biaya (cost) lebih besar. Indikasi permasalahan yang ditemui yaitu karena tingkat akurasi peramalan permintaan rendah dan tingkat produksi berlebihan dalam memenuhi permintaan pasar sehingga ditemui jumlah produk return akibat produk tidak laku terjual, serta tidak memiliki perencanaan yang strategis terhadap jadwal pengadaan bahan baku untuk kebutuhan produksi. Usulan penelitian yang dilakukan yaitu rencana produksi dengan pendekatan Material Requirement Planning (MRP). Hasil yang telah didapat diantaranya data ramalan permintaan untuk periode selanjutnya dengan metode yang terpilih yaitu Double Exponential Smoothing Holt serta telah di validasi dengan grafik Moving Range Chart (MRC), data rencana produksi agregat dengan jumlah biaya produksi sebesar Rp 264.752.418, data jadwal induk produksi untuk masing – masing produk, serta data jadwal pengadaan bahan baku dengan lot sizing pada level 1 dan level 2 menggunakan metode terpilih yaitu Period Order Quantity (POQ) yang menghasilkan biaya persediaan yang perlu dikeluarkan sebesar Rp 166.751.807.508.