Claim Missing Document
Check
Articles

Found 4 Documents
Search

DESAIN JALUR EVAKUASI PENGGUNA BANGUNAN PADA KONDISI DARURAT DI GEDUNG FTI- UMI LANTAI IV MENGGUNAKAN ALGORITMA FLOYD WARSHALL Yan Herdianzah; Ahmad Padhil; A. Dwi Wahyuni P; Andi Pawennari; Takdir Alisayabana; Abdul Mail; Taufik Alimuddin; Sadiq Ardo Wibowo
JURNAL REKAYASA SISTEM INDUSTRI Vol 7 No 2 (2022): (Mei 2022)
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/jrsi.v7i2.4536

Abstract

It is often assumed that occupational safety and health (K3) is a waste, a waste of cost or just a formality that must be fulfilled by the organization. The K3 procedure in a building is very important especially in a multi-storey building, because in a multi-storey building there are risks that cannot be predicted, for example in the event of an earthquake or fire. Based on the legal aspects of OSH which have been stipulated in Law No. 28 of 2002 concerning building construction, the importance of comfort, safety, health and convenience must be owned by a building. This research is about the evacuation route in the Faculty of Industrial Technology Building, Muslim University of Indonesia, Floor IV Using the Floyd Warshal Algorithm. By using the required data such as building plans, room data used per floor, the number of permanent and temporary building occupants, the results of data processing are obtained from the design drawings of the evacuation route, complete with instructions for safe lane during emergencies.
Perancangan Pembuatan Kemasan dan Labeling Home Industri Olahan Jagung Usaha Kelompok Desa Tonasa Kabupaten Takalar Nur Ihwan Safutra; Yan Herdianzah; Nurhayati Rauf; Anis Saleh; A.Dwi Wahyuni P; Arfandi Ahmad; Muhammad Fachry Hafid
Idea Pengabdian Masyarakat Vol. 1 No. 03 (2021): September
Publisher : PT.Mantaya Idea Batara

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2482.128 KB) | DOI: 10.53690/ipm.v2i01.112

Abstract

   Processed Corn Business so far is very promising for those who cultivate it. If you look at the competitors who are engaged in the same business, there are already quite a lot. With better taste innovations, beautiful and attractive sizes, economical prices, and most importantly healthy and hygienic by providing attractive packaging and labels so that partner products are able to compete and sell well in the market. With the Processed Corn business (corn lunkhead, corn chips, popcorn, etc.) Home Processed Corn Industry Business Group Tonasa Village, Sanrobone District, Takalar Regency which already has regular customers will increase its marketing by making attractive packaging and labels to find markets and even agents who want to sell it, so there will be many who help to develop this corn processing business. The problems faced are (1) not yet given good packaging for processed corn products that are marketed and (2) not yet given labeling to introduce their products.   
Pelatihan Teknik Pengemasan Pupuk Organik Cair dan Pestisida Nabati untuk Menjaga Viabilitas Bakteri Pada Kelompok Seraton di Desa Tonasa A Dwi Wahyuni P; Nur Ihwan Safutra
Idea Pengabdian Masyarakat Vol. 2 No. 02 (2022): May
Publisher : PT.Mantaya Idea Batara

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (716.211 KB) | DOI: 10.53690/ipm.v2i03.130

Abstract

The Seraton Farmer Group is a group of mineral farmers in Tonasa Village, Sanrobone District, Takalar Regency. Located 44-45 KM from Makassar City, with an area of ??384 KM2. Tonasa village has topographic characteristics as a lowland area surrounded by plantations such as rice, corn, chili, and others, with an average air temperature during the day between 35°C and at night between 20° - 25°C. The Seraton Farmer Group processes natural ingredients into liquid organic fertilizers and vegetable pesticides as an effort to overcome the exposure of chemicals to plants. To prevent liquid organic fertilizers and vegetable pesticides from spoiling quickly, it is very important to store liquid fertilizers and vegetable pesticides in dry and tightly closed storage. This PKM provides learning and training on packaging techniques for Liquid Organic Fertilizers and Vegetable Pesticides. The method used is socialization followed by training on the packaging of liquid organic fertilizers and vegetable pesticides. The result of this service is an increase in knowledge and skills about the benefits and good and correct techniques to maintain bacterial viability.
LAYOUT REDESIGN OF CONTAINER SHAKIGNG FIELD AT PT. XYZ Muhammad Nawir; Andi Pawennari; Ahmad Padhil; A. Dwi Wahyuni. P; Muhammad Dahlan; Takdir Alisyahbana Alisyahbana; Rahmaniah Malik
Journal of Industrial Engineering Management Vol 7, No 2 (2022): Journal of Industrial Engineering and Management Vol 7 No 2
Publisher : Center for Study and Journal Management FTI UMI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33536/jiem.v7i2.1258

Abstract

The Layout of the Field Layout Stacking containers is an important thing to consider because it can affect the effectiveness of the loading and unloading process in the field by arranging the Layout of the facilities in the stacking field in the Yard Layout including the Rubber Gantry Crane (RTG) and the arrangement of the lane Head Truck. So, it is necessary to research determining the Layout of containers. The design that will be made will affect the distance the head truck travels to transport containers from the dock. In several studies, two types of determined, Layout have been container namely Parallel Layout where the containers are arranged parallel to the pier, and Perpendicular Layout where the containers are arranged Perpendicular to the pier. Container terminal Makassar New Port using Parallel Layout. To increase the productivity of the loading and unloading process, an analysis of the arrangement of the stacking field is carried out. From the results of the research, the farthest travel distance is 1,048 m, with a total travel distance of 729,269 m with a fuel cost of Rp. 1,144,952 in the initial Layout (Parallel Layout), with the Perpendicular Layout, the farthest travel distance is 353.7 m with a total travel distance of 473,533 m, and the use of materials burn 743,446.8 m