Claim Missing Document
Check
Articles

Found 2 Documents
Search

Analisis Sistem Perawatan Mesin Produksi pada CV Abadi Tiga Mandiri (Studi Kasus Mesin Cup Sealer) Sitnah Aisyah Marasabessy; Agung K. Henaulu; Janaria Rumbouw
KAIZEN : Management Systems & Industrial Engineering Journal Vol 3, No 2 (2020)
Publisher : Universitas PGRI Madiun

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.25273/kaizen.v3i2.7892

Abstract

Salah satu faktor produksi yang harus di optimalkan penggunaanya adalah mesin produksi. Mesin di gunakan dalam kegiatan produksi harus mampu beroperasi dengan optimal, pengoperasian di katakan optimal apabila nilai downteminya minimum. Untuk menjamin pengoporasian mesin yang optimal, di perlukan suatu sistem perawatan mesin yang tepat.salah satu permasalahan yang di hadapi CV Abadi Tiga Mandiri adalah kerusakan mesin cup sealer yang akhirnya menghambat proses produksi.Tujuan Penelitian ini adalah untuk mengetaui sistem perawatan dan kebijakan perawatan dalam penurunan ongkos komponen perawatan pada mesin cup sealer. Dalam hal ini adalah untuk mengatahui tentang susunan sistem perawatan mesin produksi pada CV Abadi Tiga Mandiri. Alat analisis yang digunakan dalam penelitian ini adalah Analisis Interprestasi dengan menggunakan metode RCM (Reliability Centeren Maintenance). Hasil perhitungan RCM dalam penelitian ini membuktikan bahwa perlu di lakukan perawatan preventive dalam jangka waktu 5 bulan. Karena berdasarkan hasil perhitungan biaya sub kebijakan preventive yang di perkiraakan sebesar 929.575,6 di bandingkan dengan biaya kerusakan korektif perbulan sebesar Rp 1.126.000 secara matematis akan mahal menggunakan perawatan korektif. Dalam penggunaan metode probabilitas perawatan di harapkan di lakukan setiap 5 bulan sekali.
Support For Muslim Friendly Tourist Destinations in Makassar by Designing Ergonomics Based Ablution Places Using Approach of an Anthropometric Nusran, Muhammad; Rahmadhani, Muhammad Nur; Padhil, Ahmad; Afiah, Irma Nur; Marasabessy, Sitnah Aisyah
International Journal of Integrative Sciences Vol. 3 No. 6 (2024): June 2024
Publisher : PT FORMOSA CENDEKIA GLOBAL

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55927/ijis.v3i6.9865

Abstract

The ablution place is one of the places that is always used as an initial means of prayer. From the results of the discussion, it is known that there are several design sizes that have been changed such as the height of the faucet from 100 cm to 136 cm, the width of the gutter from 20 cm to 25 cm and the addition of a shelf with a height of 120 cm to 163 cm to be used to put songkok and other items. Soap height from 110 cm to 140 cm. In addition, the addition of anti-slip rubber carpet on the floor along the ablution place is needed to provide safety so as not to slip due to slippery floors and the addition of a 35 cm high footrest from the 95 % PL percentile to make it easier to wash your feet and be safe and comfortable during ablution.Second, anti-slip floor surfaces to prevent slipping accidents, which often occur in wet areas. Third, the provision of physical supports such as handrails to assist users who need extra help, such as the elderly or those with limited mobility. By designing an ergonomic ablution place, it will enrich the literature in ergonomic design studies and also a commitment to improving the quality of life and spirituality of mosque worshipers, so that Muslim-friendly tourist destination facilities in halal tourism will be more attractive to visit