Pengabdian Masyarakat melalui Konsultasi Persetujuan Bangunan Gedung (PBG) pada Pendirian Pabrik Pengolahan Kelapa Sawit PT. xx Purwo Subekti; Bambang Edison; Anton Ariyanto; Taufik Kurniawan
JPMAT : Jurnal Pengabdian Kepada Masyarakat Aplikasi Teknologi Jurnal Pengabdian Masyrakat Aplikasi Teknologi (JPMAT) : Edisi I, No. 02 Juni 2023
Publisher : FKULTAS TEKNIK

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30606/jpmat.v1i2.1809

Abstract

Consultation for PBG approval for a permit to establish a Palm Oil Processing Factory PT. xx, conducted to provide recommendations for the issuance of PBG. The method for consulting on document inspection is a presentation and discussion related to the applicant's technical documents. Consultation community service activities include detailing the required documents for PBG applications and providing suggestions for improving the documents requested. Based on the results of the 1st consultation, it is known that the applicant has not completed the documents according to the applicable regulations, so further consultation is needed after the 1st consultation recommendations are corrected. The 2nd consultation activity resulted in an agreement that the applicant had completed the changes and complied with the technical plan document, and continued with the plenary to determine the recommendation for the issuance of PBG.
Design of Solar-Powered Integrated Aerator System for Optimization of Water Quality in Tilapia Fish Farming Ponds Heri Suripto; Anton Ariyanto; Al Muzafri; Ridwan Sinurat
Aptek Jurnal Apliksai Teknologi (APTEK): Volume 16, No. 01, Desember 2023
Publisher : Fakultas Teknik Universitas Pasir Pengaraian

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30606/aptek.v16i1.2273

Abstract

Kualitas air yang optimal memiliki peran penting dalam budidaya ikan nila di kolam. Tingkat oksigen terlarut menjadi faktor utama yang mempengaruhi pertumbuhan dan kesehatan ikan. Penelitian ini memfokuskan pada desain sistem aerator terintegrasi yang ditenagai surya untuk meningkatkan tingkat oksigenasi air dengan efisiensi energi tinggi. Pendekatan ini bertujuan untuk mengurangi ketergantungan pada sumber daya listrik tradisional, menghasilkan dampak lingkungan yang lebih baik. Evaluasi kinerja aerator surya dan pemantauan kualitas air, seperti suhu, pH, dan tingkat oksigen terlarut, merupakan bagian integral dari penelitian ini. Hasil perancangan menunjukan untuk budidaya ikan nila sebanyak 100 ekor kebutuhan oksigen sebesar 4 gram O2 per jam dengan system aerator tenaga surya dengan kapasitas aerator 4 l/menit sebesar 80 wp dan baterai 12 x 20 ampere, scc 14 ampere inveter 500 watt
Analisis Pengaruh Filtrasi Terhadap Penurunan Kadar Logam Besi (Fe) dan Mangan (Mn) Air Gambut Alfi Rahmi; Anton Ariyanto; Afriyandi
Aptek Jurnal Apliksai Teknologi (APTEK): Volume 16, No. 01, Desember 2023
Publisher : Fakultas Teknik Universitas Pasir Pengaraian

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30606/aptek.v16i1.2275

Abstract

Air bersih dengan kuantitas dan kualitas yang cukup menjadi penting dalam menuju pembangunan berkelanjutan. Air gambut berwarna coklat tua sampai berwarna kehitaman, memiliki kadar organik yang tinggi dan bersifat asam. Air gambut juga memiliki kandungan logam pencemar didalamnya, seperti Fe dan Mn. Kandungan Fe dan Mn yang terlalu banyak didalam air akan memberikan dampak buruk bagi kesehatan manusia. Beberapa upaya sudah dilakukan untuk menurunkan kadar besi (Fe) dan mangan (Mn) air gambut, salah satunya dengan melakukan metode penyaringan. Dalam penelitian ini dilakukan analisis kualitas air gambut terhadap penurunan kadar Fe dan Mn dengan sistem filtrasi. Sistem filtrasi yang digunakan dalam penelitian ini adalah metode down flow dengan jumlah media filtrasi adalah multi media filter, dimana media filtrasi yang digunakan adalah kerikil, ijuk, arang kayu, dan pasir kuarsa Hasil penelitian didapat bahwa Metode penyaringan dapat menurunkan kadar Besi dan Kadar Mangan dari kadar Fe sebelum penyaringan adalah 0,739 mg/L setelah dilakukan penyaringan 5 kali menjadi 0,521 mg/L. Dan untuk kadar Mn dari sebelum dilakukan penyaringan kadar Mn adalah 0,042 mg/L menjadi <0,03 mg/L setelah dilakukan penyaringan 5 kali. Dan ini sudah memenuhi syarat kualitas air bersih berdasarkan standart baku mutu kesehatan lingkungan dan persyaratan kesehatan air bersih
Konsultasi TPA dengan Pemohon PBG Pendirian Pabrik Pengolahan Kelapa Sawit Kapasitas 5 Ton/Jam PT. XX Purwo Subekti; Bambang Edison; Anton Ariyanto; Taufik Kurniawan
AMMA : Jurnal Pengabdian Masyarakat Vol. 4 No. 5 : Juni (2025): AMMA : Jurnal Pengabdian Masyarakat
Publisher : CV. Multi Kreasi Media

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Community Service through Consultation by the Professional Team of Experts (TPA) regarding the technical and administrative requirements that must be fulfilled to obtain Building Approval (PBG) involves consultation and examination of technical documents by TPA together with the applicant. The purpose of this activity is to ensure the completeness and compliance of PBG application documents, especially in the project of establishing a Mini Palm Oil Processing Plant with a Capacity of 5 Tons/Hour by PT. XX. The results of the first consultation indicate that there are several documents that still need to be revised and provided with additional explanations, such as detailed lightning rod drawings, plumbing details, and illustrations of wastewater treatment ponds. Recommendations provided by TPA must be carefully considered and effectively implemented to ensure that the technical documents meet the applicable standards.The second consultation shows that most of the recommendations from the previous consultations have been implemented. However, there are still some technical aspects that require further explanations and improvements. After all recommendations have been fulfilled, TPA and the applicant agreed to proceed with the PBG application process to the relevant authorities. The consultation and document examination process conducted is expected to provide clear guidance for the applicant and ensure that the project for establishing the Mini Palm Oil Processing Plant with a capacity of 5 Tons/Hour by PT. XX proceeds in accordance with the applicable technical standards and regulations. A strong synergy between TPA, the applicant, and the relevant authorities is expected to create smoothness and success in the licensing and project development process.
Pengabdian Masyarakat Sebagai Tim Profesi Ahli Pada Penilaian Kesesuaian Dokumen Teknis PBG Lapangan Mini Soccer Purwo Subekti; Bambang Edison; Anton Ariyanto; Taufik Kurniawan; Jhoni Rahman; Suganda
AMMA : Jurnal Pengabdian Masyarakat Vol. 4 No. 12 : Januari (2026): AMMA : Jurnal Pengabdian Masyarakat
Publisher : CV. Multi Kreasi Media

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This community service activity aims to improve the quality and technical compliance of Building Approval (Persetujuan Bangunan Gedung/PBG) documents through the involvement of a Professional Expert Team (Tim Profesi Ahli/TPA) in the development of a mini soccer field in Rambah Tengah Hilir Village, Rokan Hulu Regency, Riau Province, Indonesia. The activity was conducted as technical and regulatory assistance to PBG applicants to ensure that planning documents comply with applicable regulations and technical standards. The implementation adopted a participatory technical assistance approach, including technical document compliance assessment, regulatory and technical consultation, and collaborative validation through the Building Information Management System (SIMBG). The assessment comprehensively covered general data, architectural aspects, structural design, and mechanical, electrical, and plumbing (MEP) systems, referring to Government Regulation No. 16 of 2021, regulations of the Ministry of Public Works and Housing, and applicable Indonesian National Standards (SNI). The initial evaluation indicated that the documents were administratively complete; however, several technical non-compliances were identified, particularly in the structural and MEP aspects. Through continuous consultation and systematic revisions, all recommendations provided by the TPA were successfully addressed, resulting in full technical compliance and readiness for PBG approval.