Analysis of Factors Causing the Risk of Work Accidents in the Construction of the CWI-02 ITS Surabaya Package Building Dwi Atwin Suyitno; Hanie Teki Tjendani; Esti Wulandari
Enrichment: Journal of Multidisciplinary Research and Development Vol. 2 No. 11 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v2i11.310

Abstract

Transportation is an important part that cannot be separated from human life, as it plays a crucial role in various aspects, including socio-cultural, economic, engineering, political, defense, and legal sectors. Roads are one of the primary means of transportation that significantly impact the development and progress of a region by facilitating the movement of goods, services, and people. The purpose of this study is to determine the performance of the Maliana - Bobonaro road transportation section, which serves as a vital route connecting key areas and supporting local economic growth. This study utilizes the Calculation Capacity Road method based on the PKJI 2023 (Indonesian Road Capacity Guidelines) to assess road performance and travel time. The results of the study indicate that the Maliana – Bobonaro road section demonstrates good performance, with a capacity (C) of 2735.85 smp/hour, a degree of saturation of 0.235 and 0.195, and a level of service categorized as A and B. These results suggest that the road operates efficiently with minimal congestion, ensuring smooth traffic flow and reducing travel time. However, continuous monitoring and periodic evaluations are essential to maintain this performance level, especially with potential future increases in traffic volume due to regional development. This study provides valuable insights for policymakers and transportation planners in improving road infrastructure and ensuring sustainable transportation systems.
Performance Index Analysis on the Construction of Probolinggo - Banyuwangi Toll Road Package 3 Ummatus Sholikhah; Hanie Teki Tjendani; Esti Wulandari
Enrichment: Journal of Multidisciplinary Research and Development Vol. 2 No. 11 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v2i11.311

Abstract

This study analyzes the performance index of the Probolinggo-Banyuwangi Toll Road Package 3 construction project using the Earned Value Method (EVM) to evaluate time and cost performance. Infrastructure projects, particularly toll roads, play a vital role in enhancing regional connectivity and economic growth. However, large-scale construction projects frequently face challenges such as cost overruns and delays. The Earned Value Method provides a comprehensive framework for measuring project performance by comparing planned costs, actual expenditures, and completed work. This research employs key performance indicators, including Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), and Actual Cost of Work Performed (ACWP), to determine the Schedule Performance Index (SPI) and Cost Performance Index (CPI). The findings reveal that the project experienced schedule delays, with an SPI of 0.93, indicating that work progress was behind the planned schedule. However, the project maintained cost efficiency, as shown by a CPI of 1.06, reflecting lower actual costs than budgeted. The study highlights the importance of continuous performance monitoring using EVM to identify potential risks, optimize resource allocation, and support timely decision-making. The results provide valuable insights for project managers to improve efficiency and ensure project success in large-scale infrastructure developments.
Road Performance Analysis in Maliana District, Bobonaro Regency, Timor Leste domingos godinho; Hanie Teki Tjendani; Esti Wulandari
Enrichment: Journal of Multidisciplinary Research and Development Vol. 2 No. 11 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v2i11.312

Abstract

Transportation is an important part that cannot be separated from human life, as it plays a crucial role in various aspects, including socio-cultural, economic, engineering, political, defense, and legal sectors. Roads are one of the primary means of transportation that significantly impact the development and progress of a region by facilitating the movement of goods, services, and people. The purpose of this study is to determine the performance of the Maliana - Bobonaro road transportation section, which serves as a vital route connecting key areas and supporting local economic growth. This study utilizes the Calculation Capacity Road method based on the PKJI 2023 (Indonesian Road Capacity Guidelines) to assess road performance and travel time. The results of the study indicate that the Maliana – Bobonaro road section demonstrates good performance, with a capacity (C) of 2735.85 smp/hour, a degree of saturation of 0.235 and 0.195, and a level of service categorized as A and B. These results suggest that the road operates efficiently with minimal congestion, ensuring smooth traffic flow and reducing travel time. However, continuous monitoring and periodic evaluations are essential to maintain this performance level, especially with potential future increases in traffic volume due to regional development. This study provides valuable insights for policymakers and transportation planners in improving road infrastructure and ensuring sustainable transportation systems.
Analysis of Building Construction Project Management Using Lean Construction Approach to Determine Cost and Time Waste in the Construction Project of Pondok Pesantren Syifaul Qulub Surabaya Muhammad Efendi; Hanie Teki Tjendani; Esti Wulandari
Enrichment: Journal of Multidisciplinary Research and Development Vol. 2 No. 12 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v2i12.318

Abstract

This research investigates cost waste in detailed engineering design for the Syifaul Qulub Surabaya Islamic Boarding School construction project, aiming for on-time, on-budget completion. Utilizing a Lean Construction approach, the study analyzes waste reduction in this densely populated, limited-access urban environment. Primary data from questionnaires were processed to weigh waste in each activity, followed by value stream analysis tools, including Process Activity Mapping, to identify Value-Added (VA) and Non-Value-Added (NVA) activities. The findings revealed that waiting was the primary cause of waste, contributing to 41.8% of critical waste and a 33-day project delay. Root causes included material procurement issues, transportation challenges, and equipment problems. Waste accounted for 21% of all project jobs, categorized as Unnecessary Movement (13.7%), Transportation (12.2%), Material Defects (11%), Storage (10.9%), and Overproduction (6.8%). By addressing these wastes through targeted Lean interventions, the research suggests a potential project acceleration of approximately 16.5% (33 days) and a cost reduction of 5-10% by optimizing resource use and minimizing material waste. These results demonstrate the practical benefits of Lean Construction in mitigating inefficiencies and delays in challenging urban builds.
Analysis of the Piecework Pay System in Improving Work Performance Productivity in the Construction of SMK School Buildings in Caruban District, Madiun Regency Slamet Riyadi; Hanie Teki Tjendani; Esti Wulandari
Enrichment: Journal of Multidisciplinary Research and Development Vol. 2 No. 12 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v2i12.320

Abstract

The application of the piece-rate wage system in construction projects has the potential to influence project timeliness and worker motivation. This study examines the effect of the piece-rate wage system on the completion efficiency of the SMK school building project in Caruban District, Madiun Regency. A quantitative approach was used, with multiple linear regression analysis conducted on data collected from 40 construction workers via questionnaires. The study analyzed the impact of wage systems, work communication, and work environment on labor productivity and motivation. The results showed that these three factors significantly influence the timely completion of construction work, with the piece-rate wage system playing a crucial role in enhancing worker performance. The findings highlight that implementing a structured piece-rate payment model, improving communication between workers and supervisors, and ensuring a conducive work environment can optimize labor efficiency. This study suggests that contractors and project managers should adopt clear wage agreements, provide incentives for quality work, and establish monitoring mechanisms to balance productivity with work quality.
Comparative Analysis of Prestressed Girder Beam Method and Box Culvert on Terms of Construction Costs for Kedungpeluk Bridge Design Muchamad Lutfi; Hanie Teki Tjendani; Esti Wulandari
Enrichment: Journal of Multidisciplinary Research and Development Vol. 3 No. 1 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v3i1.336

Abstract

The Kedungpeluk Bridge in Sidoarjo Regency collapsed in 2024 due to structural damage, prompting a need for efficient reconstruction methods. This study compared the cost efficiency and implementation time of two bridge designs—pre-stressed concrete beams and Box Culvert. The research used a quantitative approach to collect secondary data from project drawings, cost budget plans (RAB), and S-curves, alongside unstructured interviews with stakeholders. Findings revealed that the Box Culvert design was more cost-effective, requiring Rp. 1,440,254,544.83, compared to Rp. 1,912,436,195.15 for the pre-stressed concrete beams, resulting in a 24.69% cost savings. Moreover, construction with the Box Culvert design was completed in 10 weeks, 28.57% faster than the 14 weeks for the alternative design. These results highlight the Box Culvert as a superior choice for similar infrastructure projects, addressing urgent community needs for reliable transportation. The implications of this research extend to civil engineering practitioners and government agencies, providing a practical reference for future bridge designs that prioritize cost efficiency and timely implementation, thereby promoting enhanced connectivity and economic growth in the region. Further research is recommended to explore environmentally friendly designs and assess long-term performance in various contexts.
Cost Analysis of Wholesale Wage System and Work Efficiency in The Central Park Juanda Housing Construction Project - PT. Griyo Mapan Santoso Yunaidi Supriyanto; Hanie Teki Tjendani; Esti Wulandari
Enrichment: Journal of Multidisciplinary Research and Development Vol. 3 No. 2 (2025): Enrichment: Journal of Multidisciplinary Research and Development
Publisher : International Journal Labs

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55324/enrichment.v3i2.362

Abstract

The cost analysis between the wholesale wage system and work efficiency has special significance in housing projects, such as in Central Park Juanda Housing by PT. The Scarlet Witch is a saint. Through a quantitative approach, this study also contributes to the construction management literature related to workforce management in the field. This study used a sample of 45 respondents consisting of construction workers in the Central Park Juanda housing project, including foremen, handymen, and other field workers. Respondent profiles included gender distribution (82% male), age (dominant 31-41 years), education (47% high school/vocational school), competency certification (58% have certificates), and work experience (dominant 11-15 years). The questionnaire data was tested for validity using the Pearson method with a significance level of 5% and all items were declared valid (rh ? 0.3). Reliability was tested with Cronbach's alpha, and all variables (X1 to Y) were declared reliable (? ? 0.6). The results showed that all independent variables (X1: Labor, X2: Wages, X3: Materials, and X4: Projects) had a negative influence on project efficiency (Y). However, only the variable X4 (Project State) had a significant effect with a significance value of 0.002 (< 0.05), while the other variables (X1, X2, and X3) were insignificant., then the data shown by the probability of significance of the ANOVA analysis was with a significance value of 0.021 < 0.05 thus Ho was rejected and Ha was accepted, meaning that simultaneously there was a significant influence. This shows that the state of the project plays an important role in influencing work efficiency, while labor, wholesale wages, and materials do not have a significant impact in the context of this study.