Claim Missing Document
Check
Articles

Found 12 Documents
Search

Comparison Analysis of Rula Scores on Improvement Workplace Design in Concrete Brick Manufacturing SMEs Nugraha, MH; IR, Anes; Widyantoro, Widyantoro; Rohman, Abd; Kostaman, Tata
SITEKIN: Jurnal Sains, Teknologi dan Industri Vol 20, No 2 (2023): June 2023
Publisher : Fakultas Sains dan Teknologi Universitas Islam Negeri Sultan Syarif Kasim Riau

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24014/sitekin.v20i2.21282

Abstract

Paving block is constructions material usually used for form wall on building or construction jobs. Quality C dan D paving block manufacture on SMEs Scale in Tasilkmalaya Village does not have proper workplace design so that molder operator work in squat position. Squat position in manufacture paving block process is increasing RULA Score and ergonomic risk for musculoskeletal disorder (MSDs). In previous research, improvement has been applied to workplace, it has successfully increased productivity, but it is not sure can decrease ergonomic risk musculoskeletal disorder (MSDs) and RULA Score. This research aim to identify and compare the RULA Score before and after improvement. Analysis methods is used Rapid Upper Limb Assessment (RULA) with CATIA on moves element which has break down with Theblig methods. The result of research is workplace improvement has successfully decreased levels of ergonomic risk 43%.
Perbandingan Perancangan Sistem Kerja Manual Ball Valve Dan Motor Operated Valve Pada Sistem Peyiraman Pada Pertanian Bayam Widyantoro, Widyantoro; IR, Anes; AM, Randi
Jurnal Sains dan Teknologi (JSIT) Vol. 2 No. 3 (2022): September - Desember
Publisher : CV. Information Technology Training Center - Indonesia (ITTC)

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47233/jsit.v3i1.548

Abstract

water spinach Kale is a nutritious food. The Association of Farmers Groups (GaPokTan) Mekar Jaya Mandiri in Cikupa Village, Karang nunggal, has agricultural land planted with watercress as the main source of income. Watering the water spinach plantations is carried out using a piping system with the distribution of water divided into two groups of blocks which is carried out by adding two ball valve mechanisms as a distribution system. The addition of 2 ball valves created problems for the operator. The work cycle when adding two ball valves is 12 body positions in operating the valve, including walking towards the valve, standing straight, and bending when opening or closing the valve. Walking and bending when opening or closing the ball valve takes a long time. Productivity was increased by developing two ball valves with an automatic valve system called the Motor Operated Valve (MOV). MOV uses an albino program for its operating system, and the operator controls M0V via cell phone. Comparison of work cycles between ball valves and those using MOV. The working time cycles for the redesigned operator open and close the valve is 63 seconds with 12 movements. The longest time is walking towards the valve, which is 16 seconds. After the redesign, the operator only needs a cell phone to operate the valve application so that the movement goes to the valve is 0 seconds, and the work cycle time after the redesign is 6 seconds