Claim Missing Document
Check
Articles

Found 14 Documents
Search

Reconditioning and Testing of the 1984 Toyota Rino Diesel Engine Hamid Nasrullah; Bahtiar Wilantara; Sulitia Aji Tri Budi Utomo
Jurnal E-Komtek (Elektronika-Komputer-Teknik) Vol 6 No 2 (2022)
Publisher : Politeknik Piksi Ganesha Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37339/e-komtek.v6i2.1074

Abstract

The purpose of this research is to get a clear picture of the process of reconditioning and testing the 1984 Toyota Rino diesel engine. And to find out which components must be renovated for excellent engine performance. This research was conducted at the Piksi Ganesha Polytechnic Laboratory of Indonesia. The research method used is qualitative. The result of the reconditioning process is that several diesel engine components must be replaced in gaskets, air, and fuel filters. The results of testing the diesel engine Toyota Rino 1984 are: 1) Injector test, all injectors’ functions should run when tested using a pressure nozzle test; namely, the manometer shows 3000 psi when the lever is pressed, the nozzle can spray fuel tightly, and the nozzle does not leak; 2) Compression test, all cylinders are still in good condition when tested using a cylinder pressure tester, namely the manometer shows the number 30 kg/cm2.
Peningkatan Pengetahuan Penyemaian dan Pengenalan Tiga Metode Sambung Pucuk Kopi melalui Pelatihan Dua Tahap di Desa Selogiri Resti Dwi Putri; Tegar Ansi Faila Syufa; Fahreza Ridho Pramono; Ibnu Khafif; Indrianti Azizah Awaliah; Noval al Asfa; Wakhid Yuliyanto; Yusti Diva Alfauziah; Miftachudin Zafron; Permada Alwan Tsaqib; Aulia Tri Lestari; Rikza As Salamah; Ari Waluyo; Asni Tafrikhatin; Endy Arizka Rahma; Aditya Arya Hermawan; Desi Sugiarti; Hamid Nasrullah; Uswatun Khasanah
JURPIKAT Vol 7 No 4 (2026)
Publisher : Politeknik Piksi Ganesha Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37339/jurpikat.v7i4.3591

Abstract

Program pengabdian kepada masyarakat melalui Program Peningkatan Kapasitas Organisasi Kemahasiswaan (PPK ORMAWA) ini bertujuan meningkatkan pengetahuan petani tentang penyemaian biji kopi dan mengenalkan teknik perbanyakan vegetatif melalui sambung pucuk di Desa Selogiri, Karanggayam, Kebumen. Kegiatan melibatkan 30 petani dalam dua tahap. Pada Juli 2026, dilaksanakan pelatihan penyemaian biji kopi di bedeng dengan pendampingan Balai Penyuluhan Pertanian Karanggayam. Hasil evaluasi menunjukkan peningkatan rerata nilai pengetahuan dari 3,50 pada pre-test menjadi 7,03 pada post-test, atau meningkat sekitar 101% dari nilai awal. Pada September 2026, peserta memperoleh pengenalan dan praktik tiga teknik sambung pucuk, yaitu sambung celah, sambung samping, dan sambung susu, menggunakan batang bawah kopi liberika dan batang atas kopi robusta. Kegiatan ini meningkatkan pengetahuan penyemaian dan memberikan pengalaman awal praktik sambung pucuk. Namun, keberhasilan sambungan dan tingkat kelangsungan hidup tanaman belum dievaluasi sehingga diperlukan pendampingan lanjutan.
Pembangunan Smart Nursery dan Penguatan Kapasitas Kelompok Tani dalam Pembibitan Kopi di Desa Selogiri, Kabupaten Kebumen Tegar Ansi Faila Syufa; Resti Dwi Putri; Fahreza Ridho Pramono; Ibnu Khafif; Indrianti Azizah Awaliah; Noval al Asfa; Wakhid Yuliyanto; Yusti Diva Alfauziah; Miftachudin Zafron; Permada Alwan Tsaqib; Aulia Tri Lestari; Rikza As Salamah; Ari Waluyo; Asni Tafrikhatin; Endy Arizka Rahma; Aditya Arya Hermawan; Desi Sugiarti; Hamid Nasrullah; Uswatun Khasanah
JURPIKAT Vol 7 No 4 (2026)
Publisher : Politeknik Piksi Ganesha Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37339/jurpikat.v7i4.3598

Abstract

Kelompok Tani Selosari di Dukuh Semampir, Desa Selogiri, Kabupaten Kebumen, menghadapi keterbatasan fasilitas pembibitan kopi dan ketergantungan pada bibit dari luar daerah. Kegiatan pengabdian ini bertujuan membangun smart nursery berkapasitas rancangan 5.000 bibit dengan sistem penyiraman berbasis water timer. Metode yang digunakan adalah Participatory Action Research (PAR) selama lima bulan dengan melibatkan 30 anggota kelompok tani. Tahapan kegiatan meliputi persiapan, perancangan bersama masyarakat, pembangunan, uji fungsi, pelatihan penyemaian dan sambung pucuk, serta monitoring dan evaluasi. Data dikumpulkan melalui survei, FGD, wawancara, observasi partisipatif, dokumentasi, dan catatan lapangan, kemudian dianalisis secara deskriptif kualitatif. Hasil kegiatan menunjukkan bahwa fasilitas nursery telah dibangun dengan lima bedeng, toren 500 liter, water timer, dan sprinkler. Timer berfungsi sesuai jadwal, tetapi distribusi air belum merata akibat keterbatasan tekanan dan debit sumber air. Kegiatan ini menghasilkan sarana pembibitan dan memberikan pelatihan teknis kepada anggota kelompok tani.
Vespa Motorcycle Modification Effects to Increase Power and Torque Bahtiar Wilantara; Haifan Nur Kholis; Edwin Yuliantoko; Hamid Nasrullah; Tombak Rizky Wijaya
Jurnal E-Komtek (Elektronika-Komputer-Teknik) Vol 5 No 2 (2021)
Publisher : Politeknik Piksi Ganesha Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37339/e-komtek.v5i2.794

Abstract

This study aims to determine the effect of modifying the Vespa Sprint I-Get 150 ABS motorcycle on power and torque. The method used is to modify the intake manifold, combustion chamber, ignition, and exhaust channels. Power and torque were tested using the Bethar Racing Team Dunamometer. The test results show that: 1) modification of the piston from 58 mm to 66 mm increases engine capacity by 200.4 cc; 2) Modifications to the intake manifold, combustion chamber, ignition, and exhaust ducts can increase power by 24.8 hp at 5122 Rpm; 3) Modifications to the intake manifold, combustion chamber, ignition, and exhaust ducts can increase torque by 41.68 Nm at 1890 Rpm.