ANALISIS SCALING KETEL UAP PIPA API DI INDUSTRI TEKSTILCIREBON Yudisworo, W. Djoko
ENGINEERING Vol 4, No 1 (2012)
Publisher : ENGINEERING

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (512.36 KB)

Abstract

Penelitian terhadap unjuk kerja  Ketel uap (Boiler steam)  Pipa Api di sebuah Industri Jaring berawal dari permasalahan timbulnya  cleaning interval  yang berlangsung setiap dua kali dalam setahun. Penelitian diawali dengan pencatatan data operasional instalasi ketel uap terpasang di Industri jaring selama enam bulan.Melalui analisa perhitungan didapatkan adanya penurunan panas yang diterima oleh fluida dingin sebesar 0,881 kW sampai pada 0,995 kW pada akhir pengujian 1704 jam. Selain itu deposit pertumbuhan kerak (fouling) yang terjadi pada 1176 jam dengan harga faktor pengotor 0.0000712 m2.K/W.  Penurunan kinerja pada ketel uap dapat berimplikasi pada proses produksi maupun pada peningkatan biaya produksi. Penurunan ketel uap biasanya ditandai dengan tingginya suhu cerobong dan penurunan  perpindahan panas yang akan diterima oleh fluida air di dalam pipa/  tube.  Indikasi lain adalah penurunan efektifitas ketel uap pipa api. Dengan mempelajari faktor-faktor yang berpengaruh terhadap unjuk kerja ketel uap ini salah satunya dengan mengetahui interval cleanin g yang di sebabkan oleh faktor pengotor (Fouling). Dengan memperpanjang masa  interval cleaning  sehingga akan menghemat biaya produksi dan proses produksi akan berlangsung dengan baik.Kata kunci : Ketel Uap Pipa Api, Faktor
ANALISIS SCALING KETEL UAP PIPA API DI INDUSTRI TEKSTILCIREBON Yudisworo, W. Djoko
ENGINEERING Vol 4, No 1 (2012)
Publisher : Universitas Pancasakti Tegal

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (512.36 KB)

Abstract

Penelitian terhadap unjuk kerja  Ketel uap (Boiler steam)  Pipa Api di sebuah Industri Jaring berawal dari permasalahan timbulnya  cleaning interval  yang berlangsung setiap dua kali dalam setahun. Penelitian diawali dengan pencatatan data operasional instalasi ketel uap terpasang di Industri jaring selama enam bulan.Melalui analisa perhitungan didapatkan adanya penurunan panas yang diterima oleh fluida dingin sebesar 0,881 kW sampai pada 0,995 kW pada akhir pengujian 1704 jam. Selain itu deposit pertumbuhan kerak (fouling) yang terjadi pada 1176 jam dengan harga faktor pengotor 0.0000712 m2.K/W.  Penurunan kinerja pada ketel uap dapat berimplikasi pada proses produksi maupun pada peningkatan biaya produksi. Penurunan ketel uap biasanya ditandai dengan tingginya suhu cerobong dan penurunan  perpindahan panas yang akan diterima oleh fluida air di dalam pipa/  tube.  Indikasi lain adalah penurunan efektifitas ketel uap pipa api. Dengan mempelajari faktor-faktor yang berpengaruh terhadap unjuk kerja ketel uap ini salah satunya dengan mengetahui interval cleanin g yang di sebabkan oleh faktor pengotor (Fouling). Dengan memperpanjang masa  interval cleaning  sehingga akan menghemat biaya produksi dan proses produksi akan berlangsung dengan baik.Kata kunci : Ketel Uap Pipa Api, Faktor
STUDI ALTERNATIF PENGGUNAAN BBG GAS ELPIJI UNTUK BAHAN BAKAR MESIN BENSIN KONVENSIONAL Yudisworo, W. Djoko
ENGINEERING Vol 8, No 1 (2014): April
Publisher : Universitas Pancasakti Tegal

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (446.975 KB)

Abstract

Studi ini dilakukan menggunakan metode kajian literatur yang diambil dari jurnal ilmiah, prosiding, laporan penelitian dan artikel cetak maupun elektronik yang terkait yang difokuskan di Kota Cirebon dan sekitarnya karena memiliki cukup banyak angkutan umum kota. Hasil penelitian menunjukkan bahwa, jumlah angkutan umum yang ada di Kota Cirebon dan sekitarnya adalah +/- 10.774 kendaraan dengan bus besar (BB) berjumlah 463 unit, MPU 6.180 unit dan Taxi 4.131 unit. Penghematan yang dapat dilakukan jika BBM dikonversi ke BBG yaitu untuk BB Rp 137,305,480,087,-; MPU Rp 293,234,684,040,-; Rp 343,020,524,206,- dan total penghematan Rp 773,560,688,334,-. Sedangkan keuntungan yang diperoleh yaitu BB Rp 131,749,480,087,-/tahun ;Rp 219,074,684,040,-/tahun; Rp 293,448,524,206,-pertahun dengan total keuntungan                 Rp 644,272,688,334.00/tahun. Pengurangan emisi gas buang seluruh jenis angkutan umum yaitu untuk CO2 39.325,1 Kg/tahun; CO 849.422,2 Kg/tahun; NOx 672.459,20 Kg/tahun; HC 99.099,25 Kg/tahun; Partikel Berat 842.343,60 Kg/tahun. Total perhitungan CDM yang didapatkan Rp 250.264.935,- Kata Kunci: bahan bakar gas , konversi, mesin konvensional
ANALISIS SCALING KETEL UAP PIPA API DI INDUSTRI TEKSTILCIREBON W. Djoko Yudisworo
Engineering : Jurnal Bidang Teknik Vol 3 No 1 (2012): April
Publisher : Universitas Pancasakti Tegal

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (512.36 KB) | DOI: 10.24905/eng.v3i1.119

Abstract

Penelitian terhadap unjuk kerja  Ketel uap (Boiler steam)  Pipa Api di sebuah Industri Jaring berawal dari permasalahan timbulnya  cleaning interval  yang berlangsung setiap dua kali dalam setahun. Penelitian diawali dengan pencatatan data operasional instalasi ketel uap terpasang di Industri jaring selama enam bulan.Melalui analisa perhitungan didapatkan adanya penurunan panas yang diterima oleh fluida dingin sebesar 0,881 kW sampai pada 0,995 kW pada akhir pengujian 1704 jam. Selain itu deposit pertumbuhan kerak (fouling) yang terjadi pada 1176 jam dengan harga faktor pengotor 0.0000712 m2.K/W.  Penurunan kinerja pada ketel uap dapat berimplikasi pada proses produksi maupun pada peningkatan biaya produksi. Penurunan ketel uap biasanya ditandai dengan tingginya suhu cerobong dan penurunan  perpindahan panas yang akan diterima oleh fluida air di dalam pipa/  tube.  Indikasi lain adalah penurunan efektifitas ketel uap pipa api. Dengan mempelajari faktor-faktor yang berpengaruh terhadap unjuk kerja ketel uap ini salah satunya dengan mengetahui interval cleanin g yang di sebabkan oleh faktor pengotor (Fouling). Dengan memperpanjang masa  interval cleaning  sehingga akan menghemat biaya produksi dan proses produksi akan berlangsung dengan baik.Kata kunci : Ketel Uap Pipa Api, Faktor
STUDI ALTERNATIF PENGGUNAAN BBG GAS ELPIJI UNTUK BAHAN BAKAR MESIN BENSIN KONVENSIONAL W. Djoko Yudisworo
Engineering : Jurnal Bidang Teknik Vol 5 No 1 (2014): April
Publisher : Universitas Pancasakti Tegal

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (446.975 KB) | DOI: 10.24905/eng.v5i1.297

Abstract

Studi ini dilakukan menggunakan metode kajian literatur yang diambil dari jurnal ilmiah, prosiding, laporan penelitian dan artikel cetak maupun elektronik yang terkait yang difokuskan di Kota Cirebon dan sekitarnya karena memiliki cukup banyak angkutan umum kota. Hasil penelitian menunjukkan bahwa, jumlah angkutan umum yang ada di Kota Cirebon dan sekitarnya adalah +/- 10.774 kendaraan dengan bus besar (BB) berjumlah 463 unit, MPU 6.180 unit dan Taxi 4.131 unit. Penghematan yang dapat dilakukan jika BBM dikonversi ke BBG yaitu untuk BB Rp 137,305,480,087,-; MPU Rp 293,234,684,040,-; Rp 343,020,524,206,- dan total penghematan Rp 773,560,688,334,-. Sedangkan keuntungan yang diperoleh yaitu BB Rp 131,749,480,087,-/tahun ;Rp 219,074,684,040,-/tahun; Rp 293,448,524,206,-pertahun dengan total keuntungan                 Rp 644,272,688,334.00/tahun. Pengurangan emisi gas buang seluruh jenis angkutan umum yaitu untuk CO2 39.325,1 Kg/tahun; CO 849.422,2 Kg/tahun; NOx 672.459,20 Kg/tahun; HC 99.099,25 Kg/tahun; Partikel Berat 842.343,60 Kg/tahun. Total perhitungan CDM yang didapatkan Rp 250.264.935,- Kata Kunci: bahan bakar gas , konversi, mesin konvensional
Pembangunan Jaringan Distribusi Air Bersih bagi Masyarakat Desa Sonawan, Hery; Hermawan, M. Reza; Sofia, R. Evi; Rohadin, Rohadin; Prihastuty, Endang; Yudisworo, W. Djoko; Subiyanta, Erfan; Siswanto, Agus; Tohasan, Achmad; Wasiran, Wasiran; Heri, Junial
Berdikari: Jurnal Inovasi dan Penerapan Ipteks Vol 12, No 1: February 2024
Publisher : Universitas Muhammadiyah Yogyakarta

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.18196/berdikari.v12i1.20276

Abstract

The community service activities in Kaduela Village, which were part of a matching fund program for the year 2023, were executed from July–December 2023 in accordance with the proposed activity plan. The objective of this initiative was to establish a comprehensive water pipeline infrastructure to provide clean water to the inhabitants of Bina Loka and Bina Bakti Hamlet, who lacked access to the numerous springs located in Kaduela Village. Proper and comprehensive piping planning was necessary to provide equitable distribution of water among community members in the two elevated hamlets relative to the water source. The process of addressing issues in Kaduela Village involved several sequential steps. These steps encompassed the collection of primary and secondary data, the depiction of the new piping network on a map of Kaduela Village, the simulation of the new piping network using Epanet software, the construction of the new piping network, and the subsequent commissioning of the system. The chosen pipe network configuration is a dead-end system, which was deemed appropriate for implementation in the Bina Loka and Bina Bakti hamlets, with the aim of providing water services to a total of 58 households in Bina Loka and 15 households in Bina Bakti. The process of pipeline network designing was conducted by Mechanical Engineering students from Universitas Pasundan and Universitas 17 Agustus 1945 Cirebon, under the supervision of their respective supervisors, utilizing the Epanet software. In addition to receiving funding under the 2023 matching fund program, this initiative also garnered comprehensive support from the BUMDES Arya Kamuning as the primary collaborator
Rear Wheel Drive Sprocket Gear Transmission Design for Electric car Tohasan, Achmad; Prihastuty, Endang; Yudisworo, W. Djoko
Mestro: Jurnal Teknik Mesin dan Elektro Vol 6 No 01 (2024): Edisi Juni
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v6i01.539

Abstract

Electric vehicle engines are the same as vehicles with combustion motors, namely they are an assembly of several mechanisms consisting of three main parts, namely the drive, the power transmission system and the driven part. The electric car used for this research is a conversion of a petrol car, where the drive uses a 3 KW BLDC electric motor. The BLDC motor shaft power is transmitted to the axle pinion shaft using a sprocket gear transmission. So an analysis of the sprocket gear design, both ratio, size (type), strength and age of the sprocket gear to be used needs to be carried out. The initial step is to calculate the design power by looking at the correction factors in the table for the type of electric motor drive, then determining the chain number on the graph by first calculating the torque moment. The linear speed of the chain that occurs is influenced by the size of the gears and the input rotation of the electric motor, the greater the speed, the smaller the torque, so the gear ratio needs to be considered in determining the maximum linear speed. After knowing the chain plan number, it can be tested by calculating whether the chain number technically meets good security or not. In this research, the sprocket chain design, namely chain roller number 40 with a maximum load of 33.74 kg, is good, namely greater than sf = 6.
Analisa Perbandingan Kinerja Mesin Pembuat Es Krim Menggunakan Variasi Diameter Pipa Kapiler Sugara, Ferry; Yudisworo, W. Djoko
Mestro: Jurnal Teknik Mesin dan Elektro Vol 7 No 1 (2025): Edisi Juni
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v2i02.321

Abstract

Current refigeration technology has an important influence in improving the quality of food products. The purpose of this study is to find out how much the difference in performance generated from the expansion device in the form of two capillary pipes of different diameters and know the power consumption of electricity used, so that it knows the electric power per day. The method used in this study is to test the ice cream maker refrigeration system, by testing its performance by measuring the temperature and pressure in each main component when the system is steady. The results of the actual COP value of the average capillary pipe diameter of 0.028 inches are 2.16 while the actual COP value of the average capillary pipe diameter of 0.031 inches is 2.74. And the actual COP value of a 0.028 inch diameter capillary tube has a greater value of 2.16 while a capillary pipe with a diameter of 0.031 inches has a smaller value of 1.88. Whereas the biggest value of refractive efficiency at the average value is a capillary pipe with a diameter of 0.028 inches of 63.58%. While for capillary pipes with a diameter of 0.031 inches smaller the value of refraction efficiency averaged 59.49% and the cabin temperature in capillary pipes with a diameter of 0.028 inches, the average value was -9.82 0C. While for capillary pipes with a diameter of 0.031 inches smaller it has a cooler average value of -9.09 0C.
Perancangan Prototipe Miniatur Pembangkit Listrik Tenaga Air Wasiran, Wasiran; Yudisworo, W. Djoko
Mestro: Jurnal Teknik Mesin dan Elektro Vol 7 No 1 (2025): Edisi Juni
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v7i1.670

Abstract

The prototype tool of the hydroelectric power plant is an engineering tool as a demonstration of a power plant that is moved by water. So the tool will be redesigned by researchers as a comparison of courses in mechanical engineering study programs, especially engineering thermodynamics courses. In the design of the tool will be designed using the solid work computer program. Then in the selection of design components that are used are easily obtained or within reach of purchasing the tool, namely the frame holder for the power plant using holo steel, a water pump using a 260 bit jet pump that uses 200 watts of electric power, electricity supply using an alternator that has 200 watts of electric power. The water-driven turbine is the process made using Pvc pipe which has a tilt angle on the blade of 30 o. turbine cover using acrylic material with a thick size of 10 mm, water reservoir using steel plate size 4 mm and lamp load that will be tested 100 watt capacity. At the capacity of this tool requires a cost of approximately Rp. 5,811,500,
ANALISIS HASIL PENGUJIAN ALAT DESTILASI MINYAK SEREH DENGAN KAPASITAS 10 KG Putrawan, Pajar; Yudisworo, W. Djoko; Lazuardi, Dedi
SEMINAR TEKNOLOGI MAJALENGKA (STIMA) Vol 8 (2024): STIMA 8.0 : Menuju Kesinambungan : Inovasi dan Adaptasi Teknologi untuk Pembangunan Be
Publisher : Universitas Majalengka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31949/stima.v8i0.1197

Abstract

Lemongrass is one type of essential oil plant, which is considered to have developed. From the distillation of its leaves, lemongrass oil is obtained which is known in the world of trade as Citronella Oil. Currently, the development of essential oils is a major concern for the Indonesian government. Of the various raw materials for making Essential Oils, one of the essential oil raw materials in Indonesia that is good to be developed is Lemongrass. The purpose of this study was to obtain essential oils through the Extraction and Distillation process, obtaining Yield percentage and Water Content. Based on the results of the test and observation, the essential oil produced has physical and chemical characteristics that are in accordance with the requirements. The characteristics of lemongrass essential oil produce essential oils with a specific gravity of 0.86 mg/L.