SISTEM PROTEKSI GENERATOR DENGAN TAHANAN TINGGI PADA PLTU LABUHAN ANGIN TERHADAP GANGGUAN SATU FASA KE BUMI Rinna Hariyati; Heri Suyanto; Marisa Dosma Sitanggang
Sutet Vol 6 No 1 (2016): JURNAL ILMIAH SUTET
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1308.662 KB) | DOI: 10.33322/sutet.v6i1.571

Abstract

High resistance grounding one of the ways ptotection generator for the single phase earth fault. High resistance grounding utilizes a distribution transformer with a primary voltage rating greater than or equal to the line to neutral voltage rating of the generator. The distribution transformer should have sufficient overvoltage capability so that it does not saturate on single line to ground faults with the generator operated at 105% of rated voltage. The power dissipated in resistor is approximately equal to the reactive volt-amperes of the zero sequence capasitive reactance of the stator windings. For High resistance grounding to be effective, the size of resistor must be carefully selected for each system. IEEE Standard C37.101 provides a detailed example of how to determine the size of the ground resistor to meet the requirements cited above, as well as calculate the resulting ground currents and voltages.
ANALISIS SUSUT ENERGI PADA TEGANGAN RENDAH DI WILAYAH PT. PLN (PERSERO) AREA BULUNGAN Zalmadi Syamsudin; Erlina Erlina; Heri Suyanto
Sutet Vol 5 No 2 (2015): JURNAL ILMIAH SUTET
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (592.089 KB) | DOI: 10.33322/sutet.v5i2.593

Abstract

In the distribution of electrical energy from the power plant to the consumer occurs energy loss or shrinkage energy. Losses of energy in a electrical system must always exist. This is due to the content of prisoners on permanent conductor and the nature of the network itself. In the process of calculating the energy losses experienced many difficulties because of the extensive distribution network. So we need a method to calculate the shrinkage. By performing measurements on distribution substations and calculate the voltage drop across the channel as well as custody and subsequently look for peak power losses and average power losses. Next calculate the energy is channeled so that it can calculate energy losses.
ANALISA INTERKONEKSI SISTEM MENGGUNAKAN DlgSILENT (STUDI KASUS PLTU PULANG PISAU KALIMANTAN TENGAH) Christine Widyastuti; Heri Suyanto; Dyan Retno Febrianini
Sutet Vol 5 No 1 (2015): JURNAL ILMIAH SUTET
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (738.511 KB) | DOI: 10.33322/sutet.v5i1.613

Abstract

One of the planned areas to be implemented is the construction of a 2x60 MW coal-fired steam power plant in Pulang Pisau District, Central Kalimantan. The development of this steam power plant aims to meet the demand for electricity in Central Kalimantan which has been supplied using barito systems and isolated isolated systems generated from diesel generators. The 80% own barito system is concentrated in South Kalimantan with an electrical interconnection system using 150 KV and 70 KV transmission lines covering South and Central Kalimantan that are connected to hydro, coal and diesel power plants. The other 20% is produced from Central Kalimantan, specifically the capital of Palangkaraya and Katingan regency. Based on the simulation done using DlgSILENT software on barito system after the entry of PLTU Pulang Pisau shows the total change of power supply and the occurrence of voltage changes where the peak load time before PLTU Pulang Pisau enter the total power system generated by 395.18 MW and then after PLTU Pulang Pisau Entered into the total power generation system to 411.14 MW. This value is close to the limit of the operating voltage value but the barito system's transmission rate capability is still sufficient to overcome the change in voltage rise.
Pemanfaatan Listrik Tenaga Surya Sebagai Pasokan Listrik Untuk Menghidupkan Lampu Pju Lapangan Sarana Olah Raga Masyarakat Warga RT 002/05 BTN Cantiga Petir Cipondoh Tangerang Heri Suyanto
Terang Vol 4 No 1 (2021): TERANG : Jurnal Pengabdian Pada Masyarakat Menerangi Negeri
Publisher : Sekolah Tinggi Teknik - PLN

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33322/terang.v4i1.1133

Abstract

This article was prepared based on the Community Service Institute (PKM) of the 2019 PLN Institute of Technology which was carried out in the field of sports facilities for residents of RT002 / 05 BTN Cantiga Petir Cipondoh Tangerang with problems of frequent illegal connection or theft of electricity from electric poles for street lighting and there are still locations that require street lighting. The Purpose of Community Service Activities (PKM) This is so that the public can know the use of Solar Electricity for the community and as an implementation with theory and practice is applied to the public about the development of solar electricity technology in current energy. Through this activity, the community of Cipondoh Lightning Cantiga residents learned about the use of solar electricity for the surrounding community to turn on the PJU Lights in the RT 002/05 BTN Cantiga Petir Cipondoh Tangerang Sports Field.
Study of Smart Microgrid Technology on a Laboratory Scale Grid System Heri Suyanto; Erlina
ZETROEM Vol 8 No 2 (2026): ZETROEM
Publisher : Prodi Teknik Elektro Universitas PGRI Banyuwangi

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.36526/ztr.v8i2.8309

Abstract

The utilization of renewable energy sources to meet electricity demand has become increasingly important. However, comparative studies on the technical and economic performance of on-grid and off-grid smart microgrid systems remain limited. This study aims to evaluate the configuration and performance of a smart microgrid system by comparing different operating configurations using HOMER software. The system was modeled by defining the electrical load, simulating the proposed configurations, and evaluating their technical and economic performance based on power output, Net Present Cost (NPC), and Cost of Energy (COE). The results show that the proposed grid-connected smart microgrid provides the best overall performance, with approximately 80% of the electrical energy demand supplied by the photovoltaic (PV) system and the remaining 20% provided by the PLN grid, demonstrating effective utilization of renewable energy resources. Economically, the proposed system achieves an NPC of Rp. 828,391,700 and a COE of Rp. 419.28, which are lower than those of the off-grid configuration (NPC of Rp. 2,664,679,000 and COE of Rp. 3,151.07) and the grid-only configuration (NPC of Rp. 906,104,800 and COE of Rp. 1,071.00). These findings indicate that integrating photovoltaic generation with the utility grid offers a more cost-effective and reliable solution while significantly increasing the contribution of renewable energy to the electricity supply. Therefore, the proposed smart microgrid configuration can serve as a practical reference for the design and economic evaluation of future grid-connected renewable energy systems.
Analisis Daya Ekspor Impor kWh Meter PLTS on Grid sebagai Upaya Menjaga Stabilitas Pasokan Listrik Laboratorium Institut Teknologi PLN Nurmiati Pasra; Kartika Tresya Mauriraya; Heri Suyanto; Andi Makkulau
Jurnal Locus Penelitian dan Pengabdian Vol. 5 No. 7 (2026): JURNAL LOCUS: Penelitian dan Pengabdian
Publisher : Riviera Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58344/locus.v5i7.6106

Abstract

Peningkatan kebutuhan energi listrik dan isu keberlanjutan lingkungan mendorong pemanfaatan Energi Baru Terbarukan (EBT), salah satunya melalui Pembangkit Listrik Tenaga Surya (PLTS) sistem on-grid. Sistem ini memungkinkan integrasi antara pembangkit energi surya dengan jaringan PLN melalui penggunaan kWh meter export-import (EXIM) untuk mengatur aliran energi dua arah. Penelitian ini bertujuan untuk menganalisis kinerja daya ekspor-impor pada sistem PLTS on-grid serta mengevaluasi kontribusinya terhadap stabilitas pasokan listrik dan efisiensi biaya energi pada Laboratorium EBT Institut Teknologi PLN. Metode penelitian yang digunakan adalah metode kuantitatif deskriptif melalui pengumpulan dan analisis data operasional produksi energi PLTS, konsumsi beban listrik, energi ekspor-impor, serta perhitungan efisiensi penggunaan energi berdasarkan data monitoring periode Desember 2022 hingga Juni 2023. Hasil penelitian menunjukkan bahwa sistem PLTS berkapasitas 15 kWp mampu menghasilkan energi sebesar 6.167,558 kWh selama periode pengamatan. Analisis menunjukkan bahwa mekanisme kWh EXIM mampu mendukung pemenuhan kebutuhan energi laboratorium dengan tingkat efisiensi rata-rata sebesar 53% serta memberikan penghematan biaya listrik sekitar 13%. Penerapan sistem PLTS on-grid terbukti mampu meningkatkan efisiensi pemanfaatan energi dan mengurangi ketergantungan terhadap suplai listrik konvensional. Penelitian ini menyimpulkan bahwa optimalisasi sistem ekspor-impor energi melalui kWh EXIM dapat menjadi strategi efektif dalam mendukung pengelolaan energi berkelanjutan di lingkungan institusi pendidikan.