Claim Missing Document
Check
Articles

Found 22 Documents
Search

ANALISA TEBAL PERKERASAN LENTUR PADA RENCANA PENINGKATAN JALAN RUAS LEGUNDI – PERTIGAAN BUNDER Fandra Andriansyah P; Sigit Winarto; Yosef Cahyo Setianto Poernomo; Agata Iwan Candra
Jurnal Manajemen Teknologi & Teknik Sipil Vol. 2 No. 2 (2019): OCTOBER
Publisher : Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jurmateks.v2i2.541

Abstract

The final project is Analysis of Flexible Pavement Thickness in the Plan for Improvement of Legundi Road Section - Bunder KM.5 + 700 to 13 + 700 STA. 0 + 000 to 4 + 000which comprised the road geometrics, flexible pavement depth completed with the budgeting. A topographic map was employed to make a geometric design. Traffic data of 2018, rainfall data of 2018, and California Bearing Ratio (CBR) data were needed to design the flexible pavement depth. The basic itemized cost of wages, materials, tools, and work itemized cost from General Work BinaMarga of East Java Province Division IV (Surabaya, Gresik, Sidoarjo, Mojokerto, Jombang) were needed to find out the budget. Chosen alternative flexible pavement depth of 10 cm asphalt-concrete MS 744 surface, 20 cm Cement Tread Base (CTB) base, and 50 cm sand-aggregate class A (CBR 70) sub-base.The calculations result in PI 01 Full-Circle bend and PI 02 Full-Circle; at IDR 14.745.341.000.Laporan Akhir ini adalah Analisa Tebal Perkerasan Lentur Pada Rencana Peningkatan Jalan Ruas Legundi – Pertigaan Bunder KM.5+700 s/d 13+700 STA. 0+000 s/d 4+000 yang bertujuan untuk menghitung tebal perkerasan lentur jalan, menghitung geometric jalan dan rencana anggaran biaya proyek. Peta topografi sebagai dasar untuk merencanakan geometric jalan. Data lalu lintas tahun 2018, data curah hujan tahun 2018, data California Bearing Ratio (CBR) untuk merencanakan tebal perkerasan lenturjalan. Data Harga Satuan Dasar upah, bahan, dan alat serta Harga Satuan Pekerjaan dari Departemen Pekerjaan Umum Bina Marga Jatim kelompok IV (Surabaya, Gresik, Sidoarjo, Mojokerto, Jombang) digunakan untuk perhitungan Rencana Anggaran Biaya. Berdasarkan perhitungan didapatkan tebal perkerasan lentur alternative terpilih untuk surface 10cm laston MS 744, base 20 cm Cement Tread Base (CTB) ,serta sub base 50 cm Sirtukelas A (CBR 70). Bentuktikungan PI 01 Full-Circle, dan PI 02 Full-Circle. Biaya yang diperlukanadalahsebesarRp 14.745.341.000,-.
PENGECEKAN KELAYAKAN BANGUNAN GEDUNG SMA NEGERI 1 KOTA KEDIRI YANG DIGUNAKAN UNTUK AKTIFITAS BELAJAR Agata Iwan Candra; Yosef Cahyo Setianto Poernomo; Ahmad Ridwan; Sigit Winarto; Edy Gardjito; Eko Siswanto
Jurnal Abdi Masyarakat Vol. 2 No. 2 (2019): Mei 2019
Publisher : Universitas Kadiri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30737/jaim.v2i2.371

Abstract

Hammer test merupakan bagian dari pengecekan kelayakan dari sebuah bangunan struktur gedung , jembatan , ataupun bangunan struktur yang berhubungan dengan beton. Pada salah satu bangunan existing Sekolah Menengah Atas Negeri 1 Kediri yang akan dilakukan renovasi dan penambahan lantai terdapat retakan – retakan yang terlihat seperti pada kolom, pelat atap dan tembok. Adanya keretakan tersebut dapat mempengaruhi pengambilan tindakan terkait renovasi bangunan tersebut, apakah harus membongkar total banguna tersebut atau hanya melakukan penambalan pada bagian struktur yang mengalami keretakan. Dari data-data yang diambil dari lapangan dapat disimpulkan bahwa pengecekan kelayakan banguan sekolah menengah atas negeri 1 kota kediri diambil dari kekuatan pelat atap dan balok penyangga pelat dengan menggunakan hammer test, maka didapatlah nilai dari perhitungan, Fc’ rencana pelat senilai 20,75 Mpa atau 250 Kg/cm² dan untuk Fc’ rencana balok senilai Mpa atau 250 Kg/cm² sedangkan hasil yang diperoleh dari lapangan untuk perhitungan pelat senilai 280,23 Kg/cm² yang berarti lebih besar dari nilai rencana, dan untuk perhitungan balok hanya mencapai 234,37 Kg/cm² yang berarti di bawah nilai yang di rencanakan yaitu 250 Kg/cm²