Claim Missing Document
Check
Articles

Found 16 Documents
Search

ANALISIS KEBUTUHAN AIR BERSIH DI WILAYAH KECAMATAN MADURAN KABUPATEN LAMONGAN Agus Setiawan; endang suciati
DEARSIP : Journal of Architecture and Civil Vol 3 No 02 (2023): November 2023
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v3i02.5215

Abstract

Water is a water resource that is indispensable for living things both to meet their needs and to sustain life naturally. The higher a person's standard of living, the higher the demand for water. The population of Maduran Subdistrict continues to increase from year to year, which has an impact on increasing water demand. This study aims to calculate the water demand of Maduran Subdistrict for 2032 with 10 year projection. In this study, the projection of water demand is based on primary and secondary data. The projection of water demand for Maduran Subdistrict uses 2 analysis methods, namely the arithmetic method and the geometric method. From the results of the analysis obtained that the total population growth of Maduran Subdistrict in 2032 is 38,761 people. Based on this population, the clean water demand of Maduran Sub-district in 2023 is 52.22 L/dt. While the maximum daily water demand is 57.44 L/dt, the current water availability can serve until 2032.
ANALISIS KERUSAKAN PERKERASAN JALAN DI JALAN LAREN-BLIMBING MENGGUNAKAN METODE BINA MARGA Mahendra Winarto; agus setiawan; intan mayasari; Annisa' Carina
DEARSIP : Journal of Architecture and Civil Vol 4 No 01 (2024): Mei 2024
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v4i01.6276

Abstract

Jalan merupakan infrastruktur yang dibangun untuk memperlancar pengembangan daerah. Pada Jalan Laren-Blimbing tersebut mengalami kerusakan. Dengan adanya kerusakan tersebut maka akan banyak dampak yang bisa disebabkan oleh hal tersebut. Dengan tujuan utama penelitian ini adalah untuk menentukan nilai kerusakan jalan yang dimana nantinya bisa menentukan pemeliharaan yang sesuai. Metode Penelitian ini adalah kuantitatif, dengan analisis data yang diperlukan antara lain data kondisi jalan, data kerusakan jalan dan data lalulintas harian rata rata pada jalan tersebut. Dari hasil pengolahan tersebut didapatkan bahwa nilai kondisi jalan yang terjadi pada ruas tersebut adalah 2,3 dan data lalulintas harian rata-rata sebanyak 4164,6 emp/hari sehingga data tersebut tergolong kelas 5. Sehingga dapat dihitung urutan prioritas untuk mengetahui pemeliharaan yang sesuai yaitu dengan nilai 9,8 dimana nilai tersebut termasuk kelas A yaitu program pemeliharaan rutin.
KAJIAN PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK REHABILITASI JEMBATAN BETON PENGHUBUNG NGLINGGO — KEPOHBARU Khoirunnizam, Muhamad; Setiawan, Agus
DEARSIP : Journal of Architecture and Civil Vol 2 No 2 (2022): November 2022
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v2i2.3536

Abstract

Pada perencanaan sebuah proyek, perlu adanya penjadwalan kegiatan yang dapat menjadi pedoman oleh pelaksana dalam melaksanakan kegiatannya dilapangan, iSni menunjukkan bahwa penjadwalan sangat berpengaruh pada pelaksanaan sebuah proyek. Penjadwalan proyek yang bagus dapat membuat sebuah proyek berjalan secara efektif dan efisien, namun kenyataannya dilapangan tidak selalu sama dengan apa yang direncanakan. Dalam hal ini, dapat dilihat pada pelaksanaan proyek rehabilitasi Jembatan Beton Penghubung Nglinggo — Kepohbaru. Dalam proses pembangunan Pada proyek rehabilitasi Jembatan Beton Penghubung Nglinggo — Kepohbaru, terjadi keterlambatan yang disebabkan beberapa faktor di lapangan, sehingga terjadinya keterlambatan sebesar 72 hari yang pada awalnya di rencanakan untuk selesai dalam 180 hari namun pada lapangan proyek tersebut selesai dalam 252 hari. Karena hal ini terjadi maka dilakukan analisis pada penjadwalan proyek agar dapat mengetahui apa penyebab terjadinya keterlambatan pada proyek. Dari hasil analisis yang didapatkan, penyebab terjadinya keterlambatan ada pada item pekerjaan persiapan dan juga pada penggunaan sistem kerja 1 shift tetapi menggunakan tenaga kerja yang sama. Faktor — faktor yang menyebabkan terjadinya keterlambatan adalah dari owner, kontraktor, dan juga cuaca.
PENGELOLAAN LIMBAH PERTANIAN BERBASIS TEKNOLOGI KOMPOS SEBAGAI SOLUSI MASALAH LINGKUNGAN DI DESA KELORARUM LAMONGAN Dian Eka Kusumawati; Istiqomah Istiqomah; Agus Setiawan; Shihabuddin Achmad; Cinta Salsa Quen Nandra
Jurnal Pengabdian Masyarakat : BAKTI KITA Vol 5 No 2 (2024): Jurnal Bakti Kita
Publisher : LPPM Universitas Islam Darul 'Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/baktikita.v5i2.7695

Abstract

Waste problems are a problem experienced by various regions, including Kelorarum Village, Tikung District, Lamongan Regency, especially agricultural waste which is still often not utilized properly. In addition, the agricultural sector in Kelorarum Village still relies on chemical fertilizers which will have an impact on reducing environmental sustainability. The purpose of this community service program is to reduce agricultural waste by processing it into organic fertilizer through training which will have an impact on increasing the knowledge and skills of partners in processing agricultural waste into organic fertilizer through the composting method with a composter. This community service program was carried out from June to August 2024 in Kelorarum Village, Tikung District, Lamongan Regency which was attended by the local village Farmer Group. This activity was carried out in several stages, namely observation, socialization, fertilizer making training and evaluation. The results of this activity showed a positive response from the training participants as seen from the enthusiasm in participating in this activity, in addition, the training participants (partners) experienced increased knowledge and skills in processing agricultural waste into organic fertilizer. This is evidenced by the success of the partners in making organic fertilizer. Through this activity, it can reduce agricultural waste around the partner's environment and can produce organic fertilizer products that can be used by partners to meet fertilizer needs on their agricultural land and reduce the use of chemical fertilizers and can increase partner income.
METODE PELAKSANAAN PEKERJAAN KONTRUKSI KOLOM DALAM PROYEK PEMBANGUNAN MASJID-BKMS JIIPE GRESIK Shodiq, Mohammad Fajar; Setiawan, Agus; Mayasari, Intan
DEARSIP : Journal of Architecture and Civil Vol 4 No 02 (2024): Volume 04 No. 02 (November) 2024
Publisher : Faculty of Engineering, Universitas Islam Darul Ulum Lamongan

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.52166/dearsip.v4i02.7857

Abstract

Masjid merupakan bangunan besar yang berfungsi sebagai tempat ibadah bagi umat muslim, yang memerlukan perencanaan dan konstruksi yang aman, efektif, kuat, dan ekonomis. Penelitian ini mengamati dan menganalisis pembangunan Masjid di kawasan Java Integrated Industrial and Port Estate (JIIPE), dengan fokus pada elemen struktural, khususnya kolom. Kolom memiliki peran krusial dalam mendukung beban atap, memastikan stabilitas bangunan, serta mengorganisasi ruang dalam masjid. Kolom dalam arsitektur masjid juga mencerminkan keindahan dan keragaman seni Islam. Mengingat pentingnya kolom dalam struktur bangunan, penelitian ini bertujuan untuk menganalisis metode pelaksanaan konstruksi kolom dalam proyek pembangunan Masjid BKMSJIIPE Gresik agar sesuai dengan standar dan spesifikasi yang ditetapkan, seperti yang tercantum dalam SK SNI T-15-1991-03. Dengan menggunakan metode kualitatif, penelitian ini diharapkan dapat memberikan pemahaman yang lebih mendalam tentang pentingnya peran kolom dalam memastikan keamanan dan integritas bangunan secara keseluruhan.
Integrasi Rencana Desain, Anggaran Biaya, dan Scheduling melalui Digital Simulation Berbasis Building Information Modelling Carina, Annisa'; Agus Setiawan; Mimin Aminah Yusuf
Jurnal Civil Engineering Study Vol. 5 No. 02 (2025): Jurnal Civil Engineering Study
Publisher : Civil Engineering of Universitas Islam Nahdlatul Ulama Jepara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.34001/ces.v5i02.1529

Abstract

Penelitian ini bertujuan mengembangkan media pembelajaran digital simulation berbasis Building Information Modelling (BIM) yang mengintegrasikan rencana desain, anggaran biaya, dan scheduling dalam pembelajaran manajemen konstruksi. Metode penelitian menggunakan pendekatan research and development (R&D) dengan model ADDIE, melibatkan mahasiswa yang dibagi ke dalam tiga kelompok: desain, anggaran biaya, dan scheduling. Hasil penelitian menunjukkan adanya peningkatan signifikan nilai post-test dibandingkan pre-test, dengan peningkatan rata-rata sebesar 26,15% pada kelompok desain, 29,03% pada kelompok anggaran biaya, dan 29,69% pada kelompok scheduling. Selain itu, mahasiswa memberikan respon positif karena media ini dinilai interaktif, mudah digunakan, serta membantu memahami keterkaitan desain, biaya, dan jadwal secara komprehensif. Dengan demikian, integrasi melalui media berbasis BIM terbukti efektif meningkatkan pemahaman mahasiswa sekaligus mendukung transformasi digital dalam pendidikan tinggi teknik sipil dan arsitektur di era industri 4.0.