Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Serambi Engineering

Identifikasi Tahap Kesesuaian Pengelolaan Limbah Medis Di Rumah Sakit Z Kota Bandung Oktavian, Rizky Taufiq; Pharmawati, Kancitra
Jurnal Serambi Engineering Vol. 10 No. 2 (2025): April 2025
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Hospitals are places that have a higher risk of health problems for both healthy and sick people. Medical waste produced by hospitals affects human health, therefore the purpose of this study was to determine the level of suitability of medical waste management at Hospital Z in Bandung City. Solid medical waste has various types, such as infectious, pathological, sharp, pharmaceutical, cytotoxic, chemical, radioactive, and waste with high heavy metal content. The purpose of this study was to evaluate the suitability of solid medical waste management at Hospital Z according to relevant regulations. Primary and secondary data were collected for this study and the data were processed using a Likert scale scoring. The study includes reduction, sorting, containerization, symbols and labels, collection, storage and transportation between the existing conditions and PerMenLHK No. 56/2015, PerMenLH No. 14/2013. The results of the identification of the suitability of medical waste management in Hospital Z obtained a score of 91%, which is included in the very good category.
Evaluasi Kolam Retensi Perumahan Bandung Inten Indah, Kelurahan Derwati, Kecamatan Rancasari, Kota Bandung Selvia, Idza; Eka Wardhani; Iwan Juwana; Kancitra Pharmawati
Jurnal Serambi Engineering Vol. 11 No. 1 (2026): Januari 2026
Publisher : Faculty of Engineering, Universitas Serambi Mekkah

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to evaluate the performance of the initial retention pond design in the Bandung Inten Housing Complex and to plan for an increase in storage capacity based on the hydrological conditions of the area. The research method refers to the guidelines of the Directorate General of Human Settlements, which include hydrological analysis, determination of runoff discharge, preparation of inflow hydrographs, and calculation of pond storage volume. The evaluation results show that the initial retention pond with a volume 5.400 m3 is not yet capable of accommodating the planned runoff discharge. Based on the calculation results, the required pond volume is 7.509,42 m3 using a pump capacity of 0,03 m3/second, which is capable of reducing the runoff discharge in the Bandung Inten Housing Complex by 81,986%. However, additional alternative control measures are still needed to improve flood control effectiveness.