Drinking Water Supply System (SPAM) and Reservoir Planning in Dusun Lebaho Lais Adelia Farahdita Maharani; Viva Oktaviani; Suharto Suharto
International Journal Of Humanities Education and Social Sciences (IJHESS) Vol 5 No 4 (2026): IJHESS FEBRUARY 2026
Publisher : CV. AFDIFAL MAJU BERKAH

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.55227/ijhess.v5i4.2128

Abstract

Clean water availability is a fundamental requirement for human life and socio-economic development, particularly in rural areas that have not been adequately served by drinking water supply systems. Dusun Lebaho Lais, located in Jembayan Dalam Village, Loa Kulu District, faces challenges in accessing sufficient and sustainable clean water due to population growth and limited infrastructure. This study aims to analyze population growth, estimate future clean water demand, and determine the required reservoir capacity to support the planning of a Drinking Water Supply System (SPAM) in the area. The research applied a quantitative descriptive method using both primary and secondary data. Primary data were obtained through direct field observations, while secondary data were collected from village records, government agencies, statistical reports, and relevant literature. Population projection was conducted using the Arithmetic Method based on population data from 2015 to 2024, with projections extended to 2035. The suitability of the projection method was evaluated using standard deviation and correlation coefficient analysis. The results show that the Arithmetic Method produced a standard deviation value of 81.747 and a correlation coefficient of 1, indicating a perfect positive correlation and high reliability. The population of Dusun Lebaho Lais was recorded at 4,544 persons in 2024 and is projected to increase to 4,858 persons by 2035, with an average annual growth rate of 1%. Based on rural water consumption standards, the projected clean water demand in 2035 is estimated at 242,889 liters per day or 242.889 m³/day. The reservoir capacity analysis indicates that a reservoir with a volume of 84.86 m³, a diameter of 6 meters, and a height of 3 meters, requiring only three reservoir units, are sufficient to support the projected water demand. These findings confirm that the planned reservoir design can adequately meet future clean water needs and support sustainable water supply development in Dusun Lebaho Lais.
Hydraulic Diagnosis of Urban Flood Mechanisms using HEC-RAS: A Case Study of the Bontang River, Indonesia Viva Oktaviani; Heri Purnomo
ZERO: Jurnal Sains, Matematika dan Terapan Vol 10, No 2 (2026): Zero: Jurnal Sains Matematika dan Terapan
Publisher : UIN Sumatera Utara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.30829/zero.v10i2.29945

Abstract

Flooding along the Bontang River in Gunung Telihan Village, Bontang City, recurs almost annually, yet its causes had not been diagnosed mechanistically. This study applied one dimensional steady-flow HEC-RAS 4.1 modeling to a 1,936 m reach, using primary topographic data and design discharges (Q2, Q10, Q20) from the Nakayasu Synthetic Unit Hydrograph. Unlike prior single mechanism studies, the analysis resolved four co occurring flood mechanisms: bank-asymmetry overflow, right bank levee overflow, undersized sluice-gate backwater, and a downstream constriction. Although nominal channel capacity (13.83 m3/s) marginally exceeded Q2 (11.88 m3/s), the low right bank reduced the effective overflow threshold below Q2. A 95% confidence interval on design discharge, computed using Kite's asymptotic method, indicated the downstream constriction could approach overflow at the upper bound of Q10 uncertainty. An independent tidal sensitivity check showed the tidal range effect at the confluence (2.2 m) exceeded the sluice-gate backwater step alone (0.42-0.68 m). A planned condition simulation combining retention ponds, levee reinforcement, and gate augmentation achieved safe status at all critical points, indicating site differentiated intervention is a promising, land feasible direction pending detailed design verification.