Andi Muhammad ikhsan
Universitas Muslim Indonesia

Published : 3 Documents Claim Missing Document
Claim Missing Document
Check
Articles

Found 3 Documents
Search

STUDI PENGEMBANGAN PERPARKIRAN KOTA BAUBAU Muhammad Yusri Lukman; Muhammad Zaki; Andi Muhammad ikhsan
LOSARI Jurnal Arsitektur, Kota dan Permukiman Vol 2 No 1 Februari 2017
Publisher : Universitas Muslim Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (184.814 KB) | DOI: 10.33096/losari.v2i1.55

Abstract

Meningkatnya pembangunan disetiap kota kususnya pusat-pusat bisnis ternyata belum mampu menyediakan lahan parkir yang mencukupi, sehingga badan jalan yang berada di sekitarnya digunakan untuk lahan parkir. Apabila badan jalan tersebut dilalui lalu lintas dalam jumlah yang cukup besar maka bisa dipastikan bahwa parkir di badan jalan akan menimbulkan permasalahan lalu lintas (kecepatan menurun dan waktu tempuh meningkat. Timbulnya permasalahan parkir di kota-kota besar mengajak masyarakat dan para akhli untuk berfikir dan betul-betul memahami sistem perparkiran. Konsep dan karakteristik parkir, analisis kebutuhan parkir, perencanaan geometrik lahan parkir, serta kebijakan parkir merupakan salah satu ide yang bias diimplementasikan untuk menangani permasalahan parkir khususnya di Kota Baubau. Penelitian ini bertujuan 1.Mengkaji kelayakan lokasi perparkiran yang terbaik, optimal dan mempunyai prospek yang baik bagi pengembangan wilayah Kota Baubau; 2.Mengkaji kelayakan sosial budaya masyarakat kaitannya dengan rencana Penentuan lokasi-lokasi perparkiran, baik skala mikro (kelayakan sosial budaya pada lokasi terpilih) maupun skala makro (kelayakan sosial budaya dikaitkan dengan Kota Baubau secara keseluruhan); 3.Mengkaji kelayakan lingkungan pada titik-titik lokasi perparkiran agar tidak terjadi degradasi lingkungan akibat adanya perencanaan lokasi parkir; 4. Mengkaji aspek ekonomi dan memperhitungkan tingkat pendapatan pada saat pengoperasian sistem perparkiran berjalan, perkiraan biaya investasi yang dibutuhkan untuk pembangunan area perparkiran serta memperkirakan pengembalian investasi dengan asumsi-asumsi yang rasional dan realistis. Metode Pengumpulan data dilakukan dengan dua cara yakni survey sekunder dan survey primer.
HOMESTAY SEBAGAI FASILITAS PARIWISATA DARI PERSPEKTIF WISATAWAN DI KABUPATEN SAMOSIR Mohamad Ridwan; Andi Muhammad ikhsan
LOSARI Jurnal Arsitektur, Kota dan Permukiman Vol 4 No 1 Februari 2019
Publisher : Universitas Muslim Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33096/losari.v4i1.120

Abstract

This research aims to know the perspective of tourists against the availability of the current homestay in Samosir. Research methods used in this research was the qualitative method with descriptive analysis techniques.In this study that will be scrutinized is the perspective of tourists against homestay Samosir Regency. Research findings: (1) the tourists prefer to stay in homestay than a hotel because of the cheaper cost.(2) the existing Services in the homestay or good already is in compliance with the expectations of tourists.(3) Yet the existence of the development of the homestay is located directly in the tourist area and there are several homestay has not been in accordance with the standard concept of homestay.
Capacity Enhancement of Productivity and Product Marketing Through Construction Project Management of Interior Spaces Pratiwi Juniar Achmad Gani; Ackhriansyah Ahmad Gani; Andi Muhammad Ikhsan
Bubungan Tinggi: Jurnal Pengabdian Masyarakat Vol 6, No 4 (2024)
Publisher : Universitas Lambung Mangkurat

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.20527/btjpm.v6i4.10690

Abstract

The execution of interior construction work involves a complex series of processes carried out in parallel and interdependent. Additionally, the nature of the work is highly specialized, with tasks being divided according to the characteristics and professions of those performing them. It is crucial to maintain regular coordination and control to ensure that all activities are consistent and aligned throughout building construction. This, of course, requires the involvement of a team capable of managing the project, creating work plans, and coordinating with other teams. They need strong communication skills, problem-solving abilities, and effective leadership. The success of an interior construction project can be measured by the production of high-quality work, adherence to the planned budget, and timely completion in accordance with agreements. Therefore, performance-oriented control is necessary to complete an interior construction project successfully. In the management of interior construction projects, the concept of earned value integrates cost and time. By applying this concept, the overall performance of an interior construction project, as well as that of individual work packages, can be identified and predicted. The results of this performance evaluation can serve as an early warning if inefficiencies arise during the completion of the interior construction project. This community service activity, aimed at empowering interior construction workers, embodies the effort to develop project management capabilities within this field. This activity aims to provide a project management guide for interior construction that supports the development of team capabilities. The method of this community service activity was carried out through socialization and community empowerment activities related to the stages of an interior construction project management process to improve work productivity. With controlled work planning, productivity improvement could also be achieved through enhanced job promotion. The results of this activity showed that the implementation of the service activity was deemed successful, with a significant improvement in test scores, from a very low knowledge level of 0-40 to a very good knowledge level of 86-100. In the execution of interior construction, the ability to organize and manage work was required to achieve the best results and market them directly according to the chosen strategy. Additionally, partner feedback indicated that they strongly agreed with the implementation of this program.