MINOR FACTORS IN WORK ELEMENTS OF SMK3 IMPLEMENTATION OF PCI GIRDER ERECTION WORK BASED ON PP NO 50 OF 2012 Prasetyo, Djoko; Wateno Oetomo; Sajiyo
International Journal Science and Technology Vol. 2 No. 3 (2023): November: International Journal Science and Technology
Publisher : Asosiasi Dosen Muda Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56127/ijst.v2i3.1118

Abstract

Proving that the implementation of the Occupational Safety and Health Management System (SMK3) can be a reference that regulates various activities therein, as well as managing K3 systematically and comprehensively in a complete management system as an effort to prevent work accidents. The SMK3 assessment on the Probolinggo Banyuwangi Toll Road Development Project Package 1 aims to find out how much level of SMK3 implementation is being implemented, what factors influence the fulfillment of SMK3 implementation and then provide a response as an effort to take corrective action/improvement. Based on the results of the audit and analysis consisting of 166 criteria (Advanced Level) assessment as stated in Government Regulation No. 50 of 2012 concerning SMK3, it is known that the number of criteria fulfilled/appropriate is 149 criteria with an application percentage value of 89.76% and there are 17 The criteria are not met/not appropriate, namely with a percentage value of 10.24% (Minor Category). These results are included in the implementation assessment level category (Satisfactory). The implementation of SMK3 in the Probolinggo Banyuwangi Package 1 Toll Road Construction project is in accordance with and refers to applicable laws and regulations.
RISK ANALYSIS WITH THE HIRARC METHOD ON INSTALLATION STEEL BOX GIDER CONSTRUCTION OF ALOHA FLYOVER SIDOARJO Zahra, Karunia Az; Wateno Oetomo; Sajiyo, Sajiyo
International Journal Science and Technology Vol. 3 No. 1 (2024): March: International Journal Science and Technology
Publisher : Asosiasi Dosen Muda Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56127/ijst.v3i1.1194

Abstract

Research on the Aloha flyover construction project aims to determine the risks that occur in the workmanship of installing steel box girder, knowing the level of risk that occurs in the workmanship of installing steel box girder and knowing how to control the risks that occur in the workmanship of installing steel box girder. The method used in this research is the Hazard Identification Risk Assessment and Risk Control (HIRARC) method guided by the Malaysia HIRARC Guidelines (2008). Starting from identifying hazards at each stage of the work activity, a risk assessment is carried out, the results of which can be used as a reference for risk control, to reduce the risk of work accidents. The results of the analysis from the identification of hazards and risks arising in 5 stages of work and a total of 11 potential hazard findings were obtained. (1) Preparation stage for steel box girder erection maneuver; (2) The process of leveling/compacting the erection area soil for preparation of crawler crane footing/foundation; (3) The process of mobilizing steel box girder material from stockyard to erection area; (4) Installing slings + seals that will be used during steel box girder erection; (5) The process of installing steel box girder using crawler crane. The risk assessment results obtained a total of 11 potential hazard findings with details of 5 potential hazards with a percentage of risk value of 45.54% which is at a high level and 6 potential hazards with a percentage of risk value of 54.55% at a moderate level. The total number of risk level values is 132, with an average value of 12, meaning that the installation of steel box girder is at a moderate level. The results of risk control recommendations after obtaining the risk level value and analyzing the risk value, obtained 6 types of risk control in accordance with the risk control hierarchy, namely elimination, substitution, engineering control, warning system, administrative control, and personal protective equipment (PPE).
ANALYSIS OF FACTORS INHIBITING THE IMPLEMENTATION OF K3 IN CONSTRUCTION PROJECTS Ariyanti, Menik; Wateno Oetomo; Sajiyo, Sajiyo
International Journal Science and Technology Vol. 3 No. 1 (2024): March: International Journal Science and Technology
Publisher : Asosiasi Dosen Muda Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56127/ijst.v3i1.1195

Abstract

Low implementation of K3 in construction projects can cause the safety and health of construction workers to be given less attention, so that construction workers feel less safe and comfortable, which can result in a decrease in performance levels. The impact of non-optimal performance results in the project being carried out not being able to meet the quality requirements that have been set. Based on data analysis from observations on the Kapas-Glendeng 8 bridge widening construction project, Bojonegoro Regency, there are inhibiting factors in implementing the occupational health and safety management system, namely workforce competency, work experience in the construction sector, job training, ability to access information via digital media. , worker involvement in making regulations, understanding and awareness in wearing PPE, reporting procedures, data recording and documentation.