Claim Missing Document
Check
Articles

Found 36 Documents
Search

The Empirical Study On Algorithm Optimization In Expert Systems For Diagnosing Rice Plant Diseases Habib, Ahmad; Sunan, Muhamat; Koesdijarto, Roenardi; Sajiyo, Sajiyo; Ronando, Elsen
INTENSIF: Jurnal Ilmiah Penelitian dan Penerapan Teknologi Sistem Informasi Vol 8 No 1 (2024): February 2024
Publisher : Universitas Nusantara PGRI Kediri

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.29407/intensif.v8i1.20493

Abstract

Rice is one of the most important cultivated plants for human survival. The activity of cultivating rice plants becomes a livelihood for most of these residents, so the success rate of the amount of rice harvested becomes very important because they depend on how much rice can be harvested, disease diagnosis is very important for farmers, this is very important to reduce economic losses due to diseases that cause crop failure. Therefore, when dealing with rice diseases, an expert is needed to make diagnoses or solutions to rice diseases. However, an expert does not know when to come to the village, and farmers also do not understand all rice diseases. Therefore, a web-based expert system application using the forward chaining method is proposed to represent an expert to help farmers diagnose and solve diseases of rice plants with existing symptoms.
ANALISA DAMPAK KECELAKAAN KERJA TERHADAP KERUGIAN FINANSIAL PERUSAHAAN Arasid, Afrizal Yusuf; Sajiyo, Sajiyo
JISO : Journal of Industrial and Systems Optimization Vol. 5 No. 1 (2022): Juni 2022
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v5i1.18-25

Abstract

Penelitian analisa dampak kecelakaan kerja ini bertujuan untuk mengetahui jenis kecelakaan kerja  serta dampak kerugian finansial yang dialami PT.X pada  tahun 2017 sampai dengan tahun 2019.Data diperoleh dengan menggunakan metode wawancara selanjutnya diolah menggunakan rumus analisa perhitungan Tingkat frekuensi kecelakaan kerja(Frequency Rate), Tingkat keparahan (Safety Rate), Tingkat kecenderungan (Safety T Score), analisa kerugian Real dan kerugian potensial. Diketahui Frequency Rate pada periode 2017 berjumlah 55,88 kali kecelakaan pada periode 2018 mengalami penurunan sebanyak 55,65 kali kecelakaan sedangkan pada tahun 2019 mengalami kenaikan sebesar 78,10 kali kecelakaan setiap sejuta jam kerja. Dari hasil Safety rate  periode 2017 berjumlah 8673 jam kerja hilang, pada periode 2018 mengalami penurunan sebesar 4541 jam kerja hilang, sedangkan pada periode 2019 mengalami kenaikan sebesar 6828 jam kerja hilang setiap sejuta jam kerja. Dari hasil analisa perhitungan Safe T Score di peroleh hasil 0,39 yang mempunyai arti pada periode 2017 ke periode 2019 cenderung tidak menunjukkan suatu perubahan, bahwa pada periode 2017 sampai dengan periode 2019 keadaan kecelakaan pada PT.X hampir sama pada tahun-tahun sebelumnya. Setelah melakukan perhitungan kerugian diketahui total kerugian yang di alami oleh PT.X adalah sebanyak Rp.2.283.186.697 ABSTRACTThis work accident impact analysis study aims to determine the type of work accident and the impact of financial losses experienced by PT.X in 2017 to 2019. The data obtained using the interview method is then processed using the calculation formula for the frequency rate of work accidents (Frequency Rate), Severity (Safety Rate), Tendency (Safety T Score), analysis of real losses and potential losses. It is known that the Frequency Rate in the 2017 period amounted to 55.88 accidents, in the 2018 period there was a decrease of 55.65 accidents while in 2019 there was an increase of 78.10 accidents for every million working hours. lost work, in the 2018 period there was a decrease of 4541 lost work hours, while in the 2019 period there was an increase of 6828 lost work hours for every million working hours. From the results of the analysis of the Safe T Score calculation, the results are 0.39, which means that in the 2017 to 2019 period, it tends not to show a change, that in the 2017 to 2019 period, the accident situation at PT.X was almost the same in previous years. After calculating the loss, it is known that the total loss experienced by PT. X is Rp. 2,283,186,697 
ANALISA PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA MENGGUNAKAN METODE HIRARC DI PT. AGR UNIT ARF Kanugrahan, Tri Rizki; Puspita, Asri Dwi; Sajiyo, Sajiyo
JISO : Journal of Industrial and Systems Optimization Vol. 5 No. 2 (2022): Desember 2022
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v5i2.106-112

Abstract

ABSTRAK Penerapan Sistem Manajemen Keselamatan dan kesehatan Kerja (SMK3) di PT. AGR Unit ARF sudah cukup baik, dengan diterapkannya standar Alat Pelindung Diri (APD) untuk setiap lokasi kerja, setiap beberapa bulan juga dilakukan pengecekan kondisi lingkungan dan dilakukan efaluasi terkait ketidak sesuaian yang terjadi. Menurut data kecelakaan kerja PT. AGR Unit ARF pada tahun 2016 sampai dengan tahun 2021 tercatat sudah terjadi 15 kecelakaan kerja, mulai dari kecelakaan kerja ringan seperti tersayat pisau sampai dengan kecelakaan fatal yang menyebabkan cacat permanen, Hal ini membuktikan bahwa sistem manajemen K3 yang ada belum mencapai zero accident. untuk itu penelitian ini bertujuan melakukan pengamatan dan analisis terhadap penerapan komitmen penerapan sistem manajemen keselamatan dan kesehatan kerja pada PT. AGR unit ARF. Metode yang akan digunakan dalam penelitian ini adalah metode HIRARC untuk mengidentifikasi resiko pada lingkungan kerja di PT. AGR unit ARF yang dapat merugikan manusia, lingkungan, dan sistem yang ada. Hasil dari penelitian ini adalah terdapat 36 risiko kerja yang ada pada area produksi PT. AGR unit ARF dengan 4 kategori risk rating, yaitu Extreme risk, Hight risk , Medium risk , Low risk. Terdapat 1 proses pekerjaan yang dikategorikan sebagai Extreme risk, 5 proses pada kategori Higt Risk, 12 risiko pada Medium risk, dan 18 risiko pada Low risk. Sedangkan pengendalian risikonya menggunakan metode Hirarki (Hierarchy of control), yaitu dengan melakukan eliminasi, subtitusi, administrasi, training, dan penambahan APD (Alat Pelindung Diri).ABSTRACTImplementation of Occupational Safety and Health Management System (SMK3) at PT. AGR The ARF unit is quite good, with the implementation of the standard Personal Protective Equipment (PPE) for each work location, every few months environmental conditions are also checked and an evaluation is carried out regarding any discrepancies that occur. According to work accident data, PT. AGR Unit ARF in 2016 to 2021 recorded 15 work accidents, ranging from minor work accidents such as knife cuts to fatal accidents that cause permanent disability, this proves that the existing K3 management system has not reached zero accident. For this reason, this study aims to observe and analyze the implementation of the commitment to the implementation of an occupational health and safety management system at PT. AGR of ARF units. The method that will be used in this research is the HIRARC method to identify risks in the work environment at PT. AGR ARF units that can harm humans, the environment, and existing systems. The results of this study are there are 36 work risks that exist in the production area of PT. AGR unit ARF with 4 risk rating categories, namely Extreme risk, High risk, Medium risk, Low risk. There is 1 work process which is categorized as Extreme risk, 5 processes in the High risk category, 12 risks in Medium risk, and 18 risks in Low risk. While the risk control uses the Hierarchy of control method, namely by eliminating, substitution, administration, training, and adding PPE (Personal Protective Equipment).
PENENTUAN BAHAN BAKU MENGGUNAKAN METODE FUZZY GOAL PROGRAMMING PADA UKM FURNITURE Purnama, Jaka; Putri, Erni Puspanantasari; Sajiyo, Sajiyo; Aulia, Dian Rahma; Pratama, Novi Ariyan
JISO : Journal of Industrial and Systems Optimization Vol. 7 No. 1 (2024): Juni 2024
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v7i1.1-7

Abstract

Jombang Regency is one of the furniture producers which supplies many cities in Indonesia. Production activities are carried out at the furniture SMEs center in Catak Gayam village, Mojowarno, Jombang. Furniture SMEs strive to serve consumer needs according to demand. SMEs prepare teak wood raw materials by ordering wood from suppliers. It is difficult for furniture SMEs to determine the number of teak wood orders that match consumer product demand. The Fuzzy Goal Programming method is able to provide solutions for determining of raw materials according to consumer needs. The results of this research formed a model that was used to determine the amount of teak wood raw material according to demand of 25.03 m3 per order. Furniture SMEs set a profit target of 0.25. This condition shows the most optimal conditions in production activities at SMEs Furniture. Kabupaten Jombang merupakan salah satu penghasil furniture yang banyak menyuplai di kota-kota berada di Indonesia. Kegiatan produksi dilakukan di sentral UKM furniture di desa Catak Gayam, Mojowarno, Jombang. UKM furniture berupaya dalam melayani kebutuhan konsumen sesuai dengan permintaan. UKM menyiapkan bahan baku kayu jati dengan cara memesan kayu ke supplier. Sulitnya UKM furniture dalam menentukan pesanan kayu jati yang sesuai dengan permintaan produk yang dibutuhkan konsumen. Metode Fuzzy Goal Programming mampu memberikan solusi penentuan jumlah bahan baku sesuai dengan kebutuhan konsumen. Hasil penelitian ini terbentuk suatu model yang digunakan untuk menentukan jumlah bahan baku kayu jati sesuai dengan permintaan sebesar 25,03 m3 setiap kali order. UKM furniture memberikan target keuntungan sebesar 0,25. Kondisi ini menunjukan kondisi yang paling optimal dalam kegiatan produksi pada UKM Furniture.
RISK ANALYSIS WITH THE HIRARC METHOD ON INSTALLATION STEEL BOX GIDER CONSTRUCTION OF ALOHA FLYOVER SIDOARJO Zahra, Karunia Az; Wateno Oetomo; Sajiyo, Sajiyo
International Journal Science and Technology Vol. 3 No. 1 (2024): March: International Journal Science and Technology
Publisher : Asosiasi Dosen Muda Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56127/ijst.v3i1.1194

Abstract

Research on the Aloha flyover construction project aims to determine the risks that occur in the workmanship of installing steel box girder, knowing the level of risk that occurs in the workmanship of installing steel box girder and knowing how to control the risks that occur in the workmanship of installing steel box girder. The method used in this research is the Hazard Identification Risk Assessment and Risk Control (HIRARC) method guided by the Malaysia HIRARC Guidelines (2008). Starting from identifying hazards at each stage of the work activity, a risk assessment is carried out, the results of which can be used as a reference for risk control, to reduce the risk of work accidents. The results of the analysis from the identification of hazards and risks arising in 5 stages of work and a total of 11 potential hazard findings were obtained. (1) Preparation stage for steel box girder erection maneuver; (2) The process of leveling/compacting the erection area soil for preparation of crawler crane footing/foundation; (3) The process of mobilizing steel box girder material from stockyard to erection area; (4) Installing slings + seals that will be used during steel box girder erection; (5) The process of installing steel box girder using crawler crane. The risk assessment results obtained a total of 11 potential hazard findings with details of 5 potential hazards with a percentage of risk value of 45.54% which is at a high level and 6 potential hazards with a percentage of risk value of 54.55% at a moderate level. The total number of risk level values is 132, with an average value of 12, meaning that the installation of steel box girder is at a moderate level. The results of risk control recommendations after obtaining the risk level value and analyzing the risk value, obtained 6 types of risk control in accordance with the risk control hierarchy, namely elimination, substitution, engineering control, warning system, administrative control, and personal protective equipment (PPE).
ANALYSIS OF FACTORS INHIBITING THE IMPLEMENTATION OF K3 IN CONSTRUCTION PROJECTS Ariyanti, Menik; Wateno Oetomo; Sajiyo, Sajiyo
International Journal Science and Technology Vol. 3 No. 1 (2024): March: International Journal Science and Technology
Publisher : Asosiasi Dosen Muda Indonesia

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.56127/ijst.v3i1.1195

Abstract

Low implementation of K3 in construction projects can cause the safety and health of construction workers to be given less attention, so that construction workers feel less safe and comfortable, which can result in a decrease in performance levels. The impact of non-optimal performance results in the project being carried out not being able to meet the quality requirements that have been set. Based on data analysis from observations on the Kapas-Glendeng 8 bridge widening construction project, Bojonegoro Regency, there are inhibiting factors in implementing the occupational health and safety management system, namely workforce competency, work experience in the construction sector, job training, ability to access information via digital media. , worker involvement in making regulations, understanding and awareness in wearing PPE, reporting procedures, data recording and documentation.
Analysis of the Clean Water Distribution Scheme in Tamangil Nuhuten Village, Kei Besar Selatan Sub-District of Southeast Maluku Regency, Using EPANET 2.2 Rumihin, Paschal; Patriadi, Andi; Sajiyo, Sajiyo
Asian Journal of Science, Technology, Engineering, and Art Vol 3 No 1 (2025): Asian Journal of Science, Technology, Engineering, and Art
Publisher : Darul Yasin Al Sys

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.58578/ajstea.v3i1.4513

Abstract

The availability of clean water is a very basic need to support the lives of village communities. Tamangil Nuhuten Village, located in the South Kei Besar area, Southeast Maluku, faces various challenges in the supply and distribution of clean water. This study aims to analyze the clean water distribution scheme in Tamangil Village, Southeast Nuhuten. The results of the study show that the distribution of clean water in Tamangil Nuhuten Village still faces various challenges, especially in terms of accessibility, infrastructure, and meeting the needs of the community. Of the three main springs that are sources of clean water, only Spring A has the highest discharge of 10 liters/second with the closest distance of 1.5 km from settlements. However, only 20% of households have direct access to simple water pipelines, while the other 80% have to transport water manually, with a daily fulfillment rate of only 35%. This condition causes most people, especially those who live far from water sources, to spend more than two hours per day just to get clean water. This inequality of access has an impact on people's quality of life, including an increased risk of waterborne diseases. Data shows a 15% increase in diarrhoea cases during the dry season due to the use of water from unprotected sources. In addition, the time spent transporting water reduces people's productivity in economic activities and children's education. Limited distribution infrastructure and low community participation in clean water management are the main obstacles in creating an efficient distribution scheme.
Analisis Waktu Kerja untuk Menentukan Jumlah Tenaga Kerja dalam Pemenuhan Permintaan di UD.ABC Fachril Aliffiansyah; Sajiyo, Sajiyo
SURYA TEKNIKA Vol 11 No 1 (2024): JURNAL SURYA TEKNIKA
Publisher : Fakultas Teknik UMRI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37859/jst.v11i1.7050

Abstract

ABC is a small and medium industry that produces various kinds of shovels. The products produced by UD.ABC are wooden-handled shovels and iron shovels. Every day UD.ABC targets to produce 65 and 45 dozen wooden-handled shovels and iron shovels. But the production target could not be met. One way that targets cannot be met is influenced by the performance and consistency of each operator, therefore it is necessary to determine the standard time for each operator in order to maximize consistency in completion. After calculating the standard time, the standard time for OP1 was 33.25 seconds, OP2.3 14.19 seconds, OP4 33.47 seconds, OP5 23 seconds, OP6 26.59 seconds, OP7.8 29.1 seconds. And additional workers are needed to meet production targets. The additional workforce was carried out at OP4 by 1 person,and OP6 by 1 person.
Tenaga Kerja pada Proses Produksi Bak Dump Truck di Karoseri PT. Ragam Mulya Abadi Kurnia, Alfadhil Surya; Sajiyo, Sajiyo; Yuwono, Istantyo
SURYA TEKNIKA Vol 11 No 1 (2024): JURNAL SURYA TEKNIKA
Publisher : Fakultas Teknik UMRI

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37859/jst.v11i1.7057

Abstract

PT. Ragam Mulya Abadi, a commercial vehicle construction company, is located at Jalan Raya Menganti Jeruk No 296a, Lakarsantri, Surabaya, East Java, Indonesia. The company operates from 08:00 to 17:00, with work being conducted for 9 hours per day. Currently, the company does not have a network diagram or understanding of the critical path in its projects. A network diagram illustrates the production process and relationships between activities in the project, while the critical path is a series of crucial steps that must be completed on time to ensure production stays on schedule. Standard time studies use the stopwatch time study method to improve production efficiency, identify critical paths, and understand fluctuations in labor requirements over the course of a year. With a total standard time of 190 minutes and the critical path A-B-D-E-G-H requiring 3.9 hours, the company can plan and execute projects more efficiently.Keywords: network diagram, standart time, production, efficient, stopwatch time study.
Sensitivity Analysis of Revenue Potential in The Evaluation of East Surabaya Hospital Investment Astasari, Arianti Widi; Oetomo, Wateno; Sajiyo, Sajiyo
International Journal of Social Science and Community Service Vol. 2 No. 4 (2024): OCTOBER
Publisher : CV. Proaksara Global Transeduka

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.70865/ijsscs.v2i4.32

Abstract

As one of the largest cities in Indonesia, the City of Surabaya has an obligation to provide excellent health services for its residents. It goes without saying that Surabaya City Government is required to provide a General Hospital that can receive referrals from the government-owned Community Health Centers. For this reason, the Surabaya City Government built the East Surabaya Hospital which is located in Rungkut Sub-District. East Surabaya Hospital is a strategic project that requires investment feasibility analysis. The East Surabaya Hospital investment feasibility analysis was done by applying the Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP) and Benefit Cost Ratio (BCR) parameters. After the feasibility analysis results were obtained, a sensitivity analysis was done on changes in management costs and the amount of health service levy rates for each Fees alternative. Based on the results of the investment feasibility analysis of 4 (four) Fees alternatives, there are 2 alternatives that can be concluded as worthy investments, which are alternative 1 and alternative 3. Meanwhile, alternative 2 and alternative 4 are not feasible since the NPV parameter shows negative values and the IRR value is lower than the MARR value. However, based on sensitivity analysis, alternatives 2 and 4 can be feasible if alternative 2’s service rate is increased by 13.2%, and alternative 4’s service rate is increased by 2.3%. The opposite applies in alternative 1 where the investment might become unfeasible if the service rate is reduced by more than 5.4% and alternative 3 might become unfeasible if the service rate is reduced by more than 2.5%.