Claim Missing Document
Check
Articles

Found 4 Documents
Search

RANCANG BANGUN SISTEM KEAMANAN DROPBOX PAKET DENGAN MENGGUNAKAN SIDIK JARI Tiara, Nurul; Mardiono, Djoko Anwar; Toto H , Gunawan; Friadi, John
Computer Based Information System Journal Vol. 12 No. 1 (2024): CBIS Journal
Publisher : Universitas Putera Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33884/cbis.v12i1.9192

Abstract

The design of this tool is to help overcome anxiety in receiving package deliveries, so that having this tool can provide a sense of security for home owners when they are not at home when the package being sent arrives. This Dropbox package is designed with several security components including a fingerprint sensor (Finger Print ZFM-20) and Keypad. Finger Print functions to open the door of the dropbox by the home owner. Apart from that, you can also open the dropbox door by using a PIN that is entered into the keypad. The keypad function is to input the last 6 digits of the homeowner's delivery receipt number after receiving the delivery receipt number. For goods delivery couriers, if the courier wants to put a package into the dropbox, the courier must enter the 6-digit receipt on the delivery package. If the receipt number entered matches the homeowner's receipt number, then the dropbox lid can be opened so the courier can enter the package. The homeowner will receive a notification when the package has arrived via SMS. The result of testing this tool is the creation of a sensory-based intelligence system that combines several sensors to control Dropbox Package access
INSTALASI LISTRIK MASJID AL-IKHLAS KAMPUNG KARET-BATU BESAR KECAMATAN NONGSA KOTA BATAM Hadiyanto, Gunawan Toto; Mardiono, Djoko Anwar; Apriyanto, Bambang; Nurhatisyah; Effendy, Nur Effendi
Jurnal Pendekar Nusantara Vol. 1 No. 1 (2023): OKTOBER 2023
Publisher : LPPM-Universitas Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37776/pend.v1i1.1221

Abstract

The people of Kampung Karet, Nongsa District, most of them still don't understand about electrical installations, the condition of the electrical installation system in people's homes and especially places of worship (mosques) are still many that do not comply with general regulations regarding electrical installations. Apart from that, there are still many connections. -connection of electrical installations carried out by the community itself which does not comply with regulations. Community service by providing counseling and going directly to see the location that is the target of carrying out service activities, namely the Al-Ikhlas mosque. By holding community service (PKM), the residents of Rubber Village will understand how to install electricity properly, correctly and safely. The equipment selected for installation in an electrical installation must meet applicable standards and must be suitable for its environment. Installation of equipment must comply with the provisions in PUIL, and match the equipment manufacturer's instructions. Electrical installations must be regularly inspected and tested for misuse, damage or poor installation, including loose connections. To protect against leakage currents, an ELCB can be installed. In order to achieve an increase in public knowledge and understanding about the importance of electrical hazards, this activity needs to be sustainable.
INSTALASI PEMBUMIAN DAN INSTALASI LISTRIK MUSHOLA AL MUTTAQIIN TEMBESI KIBING-BATU AJI BATAM Hadiyanto, Gunawan Toto; Mardiono, Djoko Anwar; Jumadril, Jumadril JN; Kumala Sari, Intan
Jurnal Pendekar Nusantara Vol. 2 No. 1 (2024): OKTOBER 2024
Publisher : LPPM-Universitas Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37776/pend.v2i1.1574

Abstract

The condition of the electrical installation system in people's homes and especially places of pray (Mushola) in Tembesi Kalurahan Kibing, Batu Aji District, Batam City, most people still do not understand about electrical installations and there are still many things that do not comply with general regulations regarding electrical installations, apart from There are still many electrical installation connections carried out by the community themselves which do not comply with the provisions. Community service by providing counseling and going directly to see the location that is the target for carrying out service activities, namely the Al Muttaqiin prayer room. By holding community service (PKM), residents of Kibing Village will understand how to install electricity properly, correctly and safely. The equipment selected for installation in an electrical installation must meet applicable standards and must be suitable for its environment. Installation of equipment must comply with the provisions in PUIL, and match the equipment manufacturer's instructions. Electrical installations must be regularly inspected and tested for misuse, damage or poor installation, including loose connections. To protect against leakage currents, grounding and ELCB can be installed.In order to achieve an increase in public knowledge and understanding about the importance of electrical hazards, this activity needs to be sustainable
PENYULUHAN INSTALASI LISTRIK YANG AMAN DAN HANDAL UNTUK PERUMAHAN Gunawan Toto Hadiyanto; Mardiono, Djoko Anwar; Jumadril, Jumadril JN; Kumala Sari, Intan; Saptarika, Ria; Salim, Kalbin; Apriyanto, Bambang; Nanra, suwadi; Anwar, Nur Effendi; Kusuma Raharjo, Adriene
Jurnal Pendekar Nusantara Vol. 2 No. 3 (2025): MEI 2025
Publisher : LPPM-Universitas Batam

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.37776/pend.v2i3.1835

Abstract

The electrical energy demand in currently era is a very vital need, the electrical energy demand is spread almost to all human life needs, so it is only right if there is a reliable energy supply, There fact are that many people's homes and also public places area or mosque and public facilities have poor electrical installations and need to repair. These also happen with the electrical facilities in the public facilities of Teluk Mata Ikan Village, Nongsa District, Batam City. The reality is that most people still do not understand about electrical installations and there are still many electrical installations that do not comply with general regulations on electrical installations, In addition, there are still many electrical installation connections made by the community themselves that do not comply with the provisions. So this time Community Service is carried out by providing counseling about the importance of reliable and safe electrical installations. and go directly to the location to show how to install it properly, correctly and safely. By holding community service (PKM), residents are expected to understand how to install electricity properly, correctly and safely. The equipment selected for installation in an electrical installation must meet applicable standards and must be in accordance with environment. The installation of equipment must comply with the provisions in PUIL standard, and suitable according to the equipment manufacturer's instructions. To increase public knowledge and understanding of the importance of electrical hazards achiefments, this activity needs to be carried out continuously.