Claim Missing Document
Check
Articles

Found 2 Documents
Search
Journal : Retensi

PERANCANGAN STRUKTUR BETON BERTULANG KANTOR SEWA 6 LANTAI JALAN AHMAD YANI KOTA PONTIANAK: PERANCANGAN STRUKTUR BETON BERTULANG KANTOR SEWA 6 LANTAI JALAN AHMAD YANI KOTA PONTIANAK Sudoko, Jihan; Supardi, iwan; Sasongko, Hartanto Wahyu; Muliati, Erni Puji
RETENSI Vol. 3 No. 2 (2023): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v3i2.653

Abstract

This rental office building is designed to be built on Road Ahmad Yani, Pontianak City. Thei buildingi structure is designed usingi the Speciali Moment Resistant Framei Structure systemi (SPRMK) based on SNIi 03-2487-2013 (Requirementsi for Structurali Concretei fori Buildings). Analysis ofi earthquakei loads usingi the spectrum design methodi based on SNIi 1726-2019i (Earthquakei Resistance Planningi Proceduresi for Buildingi and Non-Buildingi Structures) for the locationi of earthquake accelerationi using the cityi ofi Tarakan. iPPPURG 2847-1989 (Guidelines for Loading Planning for Houses and Buildings) and PPPURG 1987 (Guidelines for Loading Planning for Housesi and Buildings) fori loading. In thei analysis, thei loading systemi that will be imposedi on the building isi a vertical loadingi systemi in the formi of dead andi livei loads and horizontal loads in thei form ofi earthquakei loads and structurali analysisi assistedi by computeri programmers. From the structurali analysis, it can be concludedi that the dimensionsi of the crossi section andi reinforcementi are obtained.
Ari Kuswandari, Feby Khairunisa PERENCANAAN MANAJEMEN KONSTRUKSI PADA PEMBANGUNAN GEDUNG 5 LANTAI DI JALAN HOS COKROAMINOTO KOTA PONTIANAK Khairunisa, Feby; Kuswandari, Ari; Utomo, satriyo; Sasongko, Hartanto Wahyu
RETENSI Vol. 4 No. 2 (2024): Retensi
Publisher : Jurusan Teknik Sipil Polnep

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31573/retensi.v4i2.722

Abstract

Building planning is very influential because it will produce a building that meets the requirements of being sturdy, economical and aesthetic in order to avoid building damage. Construction management is a very appropriate solution for planning cost, quality, time, and Human Resources (HR) as well as Occupational Safety and Health (K3) requirements. In management planning for a 5-storey shop building in Pontianak City, an analysis of the working drawings used as the object of management planning is carried out. So that job descriptions are obtained from working drawings to analyze cost management, quality management, time management by making a Time Schedule and S Curve, human resource management, and occupational health safety. In writing this Final Project the writer uses data sources in the form of primary data and secondary data. Based on the processed data, the final results include a Budget Plan (RAB) of Rp. 2,585,448,000, the duration of the work was 24 weeks or 144 days, the project quality management made a quality checklist recapitulation in accordance with the standards, Human Resources (HR) obtained the results of the highest number of workers in the floor plate reinforcement work as many as 41 workers. Occupational Safety and Health (K3) obtained the results of risk control and the need for personal protective equipment that is in accordance with standards and requirements. Keywords: Cost, K3, Quality, Worker, Time