DAMPAK PANDEMI COVID-19 BAGI PELAKSANAAN PROYEK KONSTRUKSI DI KOTA AMBON Nelda Maelissa; Willem Gaspersz; Selly Metekohy
JURNAL SIMETRIK Vol 11, No 1 (2021)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v11i1.21

Abstract

Dampak Pandemi Covid-19 yang ditimbulkan dalam bidang konstruksi selain keterlambatan proyek, juga dalam distribusi material dan bahan konstruksi, pemangkasan tenaga kerja/buruh, pemangkasan jam kerja bahkan penghentian kerja sementara bagi proyek-proyek yang berada di zona merah. Namun di sisi lain, sektor konstruksi dalam negeri juga mengalami dilema karena Menteri PUPR Basuki Hadimuljono mengatakan pada kondisi pandemi Covid-19, jasa konstruksi terus berjalan dengan mengacu pada Instruksi Menteri PUPR Nomor 2/2020 yang telah diterbitkan pada 27 Maret 2020. Hal ini membuat sektor konstruksi mau tidak mau harus tetap berjalan dengan berbagai perubahan untuk menyesuaikan diri selama pandemi dan pasca pandemi. Metode Pengumpulan data yang akan digunakan dalam penelitian ini adalah survey dan instrument untuk pengumpulan data yang digunakan adalah kuisioner, yang akan disebar secara online atau offline. Metode analisis yang digunakan yakni Analisis Komponen Utama (Principal Component Analysis). Dari hasil penelitian ini dapat disimpulkan bahwa Faktor-faktor yang merupakan dampak pandemic Covid-19 bagi proyek Konstruksi sebagai berikut: faktor keuangan proyek, Faktor Pembatasan Wilayah (PSBB), Faktor tenaga kerja, Faktor material dan peralatan, Faktor Ketidakpastian Proyek, dan faktor mogok kerja. Ada beberapa  strategi yang dapat diterapkan pada penyelengaraan Proyek Konstruksi selama pandemic dan pasca pandemic, disesuaikan dengan komponen utama yang terbentuk. Untuk komponen Utama pertama, solusi yang dapat diterapkan adalah : 1) Pengontrolan arus kas Proyek secara efektif dan efisien; 2) Penerapan metode Analisa nilai hasil (earn value method) untuk mengontrol anggaran dan waktu proyek; 3) Menyiapkan anggaran tidak terduga proyek
PENGARUH GAS HIDROGEN DARI LARUTAN SODIUM HIDROKSIDA TERHADAP EMISI BUANG DAN KONSUMSI BAHAN BAKAR PADA KENDARAAN BERMOTOR Geo Alfani
JURNAL SIMETRIK Vol 11, No 1 (2021)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v11i1.674

Abstract

Menurut hasil survey yang dilakukan oleh World Bank, Indonesia menempati peringkat keempat untuk negara dengan tingkat polusi tertinggi di dunia setelah Mesir, India, dan Cina. Dari semua penyebab polusi udara yang ada, emisi transportasi terbukti sebagai penyumbang pencemaran udara di Indonesia, yakni sekitar 85% (Segera 2016). Sebagai upaya dalam hal penghematan BBM guna mengatasi krisis ketersediaan energi, maka perlu adanya pengembangan-pengembangan energi alternatif terbarukan untuk memenuhi kebutuhan pasokan energi dalam negeri ini. Salah satu penelitian mengenai energi terbarukan pada saat ini dikembangkan adalah pemanfaatan hidrogen yang digunakan untuk mengurangi emisi buang dan meningkatkan efisiensi dari konsumsi bahan bakar. Hidrogen dalam hal ini didapatkan dengan memanfaatkan reaktor eletrolisis serta larutan sodium hidroksida. Pada penelitian ini hidrogen mampu menurunkan gas emisi buang CO2 sebesar 32,8%, CO 48%, O2 sebesar 6,8% dan HC sebesar 7% serta mampu meningkatkan efisiensi bahan bakar pada kendaraan bermotor sebesar 29,72%.
Pemanfaatan GIS dalam Pembuatan dan Penetuan Morfometri DAS Wailela Steanly Reynold. R. Pattiselanno
JURNAL SIMETRIK Vol 11, No 1 (2021)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v11i1.559

Abstract

Keterbatasan lahan di pusat Kota Ambon untuk pembangunan pusat pemerintahan, perdagangan dan pemukiman, menyebabkan Kota Ambon sudah mulai sampai pada titik jenuh dari sisi kapasitas tampungan lahan bagi pembangunan. Sehingga pemerintah mulai mengimplementasikan kebijakan pembangunan yang mulai menyebar ke luar pusat Kota Ambon.  Pengalaman bencana banjir dan longsor yang pernah terjadi sebelumnya, maka pemerintah melalui Badan Penanggulangan Bencana Daerah melakukan program pengelolaan banjir terpadu untuk lima sungai utama di kota Ambon yang kerap mengalami banjir.Pilot project yang dikerjakan oleh Balai Wilayah Sungai Maluku di Kota Ambon untuk berkolaborasi menunjang program pengelolaan banjir terpadu, salah satunya melalui restorasi Sungai Wailela di Desa Rumahtiga – Kecamatan Teluk Ambon, memerlukan data teknis DAS Wailela yang komprehensif.  Pengumpulan data suatu DAS tidaklah mudah dan memerlukan biaya, proses dan waktu yang relatif cukup panjang, sehingga dibuatlah alternatif sebuah kajian ilmiah melalui ekstraksi batas DAS dari DEM (Digital Elevation Model) Pulau Ambon untuk menentukan morfometri DAS Wailela.Hasil penelitian menunjukkan bahwa secara geografis area DAS Wailela yang terbagi atas 21 SubDAS, terletak antara koordinat 3°36’32,4” - 3°39’43,2” LS dan 128°7’44,4”- 128°11’16,8” BT dan luas 17.728.759,6328 m2 (17,73 km2), serta keliling DAS Wailela adalah 24.822,2264 m (24,82 km).  Untuk morfometri DAS Wailela antara lain: panjang DAS 9.550,3603 m (9,55 km); lebar Das 1,86 km; kemiringan/gradien alur sungai utama Wailela 0,0197; Orde jaringan sungai Wailela metode Strahler adalah sampai dengan orde ke-3, indeks percabangan (Rb) orde ke-1 = 2,2 dan orde ke-2 = 1, dengan Rb DAS Wailela  = 5,2; kerapatan alur sungai (Dd) = 1,24 ; nisbah pendekatan kebulatan bentuk DAS (Rc) = 0,36. Berdasarkan hasil identifikasi data  dan Rc, maka DAS Wailela termasuk karakter DAS dimana sungainya mengalami kenaikan dan penurunan muka air banjir yang berlangsung dengan cepat atau debit puncak yang datang dengan cepat, begitu juga penurunannya.
PENGGUNAAN FAN TYPE HOLOGRAM DENGAN SOLAR CELL SEBAGAI PILIHAN ALTERNATIF BILLBOARD DI KOTA AMBON Eka Rahmat Mahayani Anthonio Putera Lilipaly; Eka Adhitya Dharmawan
JURNAL SIMETRIK Vol 11, No 1 (2021)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v11i1.621

Abstract

This research aimed to investigate the use of fan type hologram, that is considered to be a new technology, to replace conventional billboard. Billboard usage consumes plenty of energy and is not flexible. Fan type hologram is expected to reduce the electricity use and becomes more attractive to the general society. Prototype of the system build with solar cell as the source of energy, and battery as the storage. The energy from the sun is also measured to confirmed the energy supply is enough.The experiment showed that the initial cost for billboard is less expensive than the fan type hologram. On the other hand, the use of electricity of fan type hologram is much less than the billboard. It is also does not pay the monthly electricity bill, while conventional billboard needs to pay around Rp.252.000,- per month. 91.2% respondents agree for the replacement of the conventional billboard with fan type hologram.
RANCANG BANGUN SISTEM KONTROL NIRKABEL ON – OFF PERALATAN LISTRIK DENGAN PERINTAH SUARA MENGGUNAKAN SMARTPHONE ANDROID Ari Permana Launuru; Greatgirlown Manu; Hendrik K. Tupan; Riana Hutagalung
JURNAL SIMETRIK Vol 11, No 1 (2021)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v11i1.570

Abstract

Home automation systems allow us to control through smart home technology. Starting from lighting, heating, refrigeration, air conditioning, TV, entertainment audio and video systems, security, and camera systems that can communicate with each other which can be controlled remotely, from any location via Smartphones or the Internet. The research development research method is a load control prototype that functions as a controller that can be managed with external devices such as the Bloetoeth HC05 and Relays, so that with the Arduino Uno or AT-Mega 328 we use it as a control for electrical devices to turn on and turn off electricity after receiving orders. from Smathphone as an alternative to manual switch on those installed in residential, office buildings, industries and others. Testing the system with a distance of ± 15 meters of bluetooth signal propagation without obstructions and obstacles for each load used. Tests carried out with a lamp load of 100 watts of power as many as 4 lamps to see how much active power consumption (pure power) is to the effect of the load used. The results of measurements of voltage, current, power, energy carried out on a 100 watt lamp load obtained a very significant value, this is due to the influence of the fluctuating PLN grid voltage ranging from 217 volts to 219 volts.
ANALISIS FAKTOR-FAKTOR KETERLAMBATAN PADA PROYEK PEMBANGUNAN GEDUNG ASRAMA MAN 1 TULEHU MALUKU TENGAH Musrifah Mardiani Sanaky
JURNAL SIMETRIK Vol 11, No 1 (2021)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v11i1.615

Abstract

Tujuan penelitian ini adalah untuk mengetahui faktor-faktor yang menentukan terjadinya keterlambatan dan intensitas terjadinya pada proyek pembangunan Asrama MAN 1 Tulehu Maluku Tengah. Berdasarkan analisis faktor terbentuk 17 faktor yang mempengaruhi keterlambatan proyek pembangunan Gedung Asrama MAN 1 Tulehu Maluku Tengah. Namun diambil 5 faktor yang paling dominan dilihat dari Rangking yang tinggi.5 faktor itu adalah Kesalahan desain dengan nilai Mean= 3,24, jumlah pekerja, dengan nilai Mean = 3,16, ketersediaan peralatan yang memadai dengan nilai Mean = 2,96 ,komunikasi anatar tenaga kerja dan kepala tukang, dengan nilai mean = 2,80, keterlambatan pengiriman bahan (material) = 2,76. Dan terdapat 4 indikator penting dalam pengendalian keterlambatan proyek, diantaranya yaitu pengendalian terhadap perubahan (change),tenaga kerja (labors),peralatan,dan bahan (material).
PENGARUH PEMBEBANAN TERHADAP ARUS EKSITASI GENERATOR UNIT 2 PLTMH CURUG Miftah Farhan
JURNAL SIMETRIK Vol 11, No 1 (2021)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v11i1.653

Abstract

Generator salah satu bagian dari sistem tenaga listrik yang digunakan untuk mengkon-versi energi mekanik yang berasal dari putaran turbin menjadi energi listrik dengan memanfaatkan gaya gerak listrik. Dalam proses pembangkitan gaya gerak listrik (GGL) di samping putaran dari turbin, diperlukan arus penguat (eksitasi) yang berfungsi untuk menghasilkan medan magnet pada kumparan medan di rotor generator. Arus digunakan untuk meningkatkan tegangan keluaran sesuai pembebanan yang diterapkan. Adapun alat yang digunakan untuk membina arus eksitasi adalah Automatic Voltage Regulator (AVR). Pembebanan yang dibedakan pada pembangkit setiap waktunya berubah-ubah. Oleh pembangkit listrik tenaga listrik harus mampu membangkitkan daya listrik sesuai dengan besaran beban yang berubah-ubah tersebut. Pada pembangkitan tenaga listrik, fluktuasi pembebanan ini dapat mengatasi pembantuan katup udara dan arus eksitasi yang di-injeksikan pada generator rotor pada putaran rotor yang konstan oleh AVR sehingga dihasilkan daya listrik sesuai pembebanan yang diterapkan. Tujuan penelitian ini adalah untuk menganlisa pengaruh beban terhadap arus eksitasi yang ada. Hasil yang diperoleh adalah beban berpengaruh ter-hadap arus eksistasi, maka dibutuhkan injeksi agar menambah arus arus naik, agar adanya kes-esuaian arus Tujuan penelitian ini adalah untuk menganlisa pengaruh beban terhadap arus eksitasi yang ada. Hasil yang diperoleh adalah beban berpengaruh ter-hadap arus eksistasi, maka dibutuhkan injeksi agar menambah arus arus naik, agar adanya kes-esuaian arus Tujuan penelitian ini adalah untuk menganlisa pengaruh beban terhadap arus eksitasi yang ada. Hasil yang diperoleh adalah beban berpengaruh ter-hadap arus eksistasi, maka dibutuhkan injeksi agar menambah arus arus naik, agar adanya kes-esuaian arus
ANALISIS LAJU PENDINGINAN BAHAN MAKANAN DALAM COOLBOX UNTUK PEMASARAN DENGAN WATER MISTING SYSTEM DI KOTA AMBON Leslie S Loppies; Eka Rahmat Mahayani Anthonio Putera Lilipaly
JURNAL SIMETRIK Vol 11, No 1 (2021)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v11i1.620

Abstract

Food preservation can be done by using cooling system, however, the preservation used in Ambon traditional market is still the old ways of pouring cold water on the materials. The method caused many types of pollution such as smell, dirty puddle, and the damage of the road. By using a more effective and efficient cooling system, the food material is expected to be more clean, the market will be better and less damaged road. This will result in a happier customer and seller. The water misting system can keep the materials temperature at 10-15⁰C. The materials use is kale and fish. These materials can last all day and looked fresh. This system did not create pollution, dirty water puddle, and also consumed less water.
PENGENDALIAN BIAYA DAN WAKTU DENGAN EARNED VALUE CONCEPT PADA PROYEK PENATAAN BANGUNAN Ma'rifatul Muniroh; Meidy Kempa; Christy Gery Buyang
JURNAL SIMETRIK Vol 11, No 1 (2021)
Publisher : Pusat Penelitian dan Pengabdian Kepada Masyarakat (P3M) Politeknik Negeri Ambon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31959/js.v11i1.639

Abstract

Dalam suatu proyek, perencanaan serta pengendalian biaya dan waktu merupakan bagian dari manajemen proyek konstruksi yang sangat penting keberadaannya. Apabila terjadi keterlambatan proyek maka akan berpengaruh pada biaya proyek. Studi kasus penelitian ini dipilih pada Proyek Penataan Bangunan Kws. Dermaga Tawiri (Lantamal) Kota Ambon, dimana kondisi yang terjadi adalah proyek mengalami perubahan waktu pelaksanaan dari 210 hari kalender menjadi 150 hari kalender serta adanya hambatan mengenai desain perencanaan yang belum fix, sehingga kontraktor perlu mengajukan CCO (contract change order). Tujuan penelitian adalah untuk mengetahui proyeksi biaya dan waktu penyelesaian proyek terhadap perencanaan awal. Metode yang digunakan adalah earned value concept, dengan menggunakan indikator BCWS, BCWP, ACWP, CPI, dan SPI untuk evaluasi biaya dan waktu proyek, serta indikator EAC dan EAS untuk melihat proyeksi biaya dan waktu penyelesaian proyek. Hasil analisis data yang dilakukan pada minggu ke-14 menunjukkan bahwa biaya yang dikeluarkan lebih dari perencanaan dan waktu pelaksanaannya melebihi waktu rencana, yang ditunjukan dengan nilai CPI = 0,94 (CPI < 1) dan nilai SPI = 0,98 (SPI < 1). Hasil perhitungan proyeksi biaya akhir proyek sebesar Rp. 27.079.501.611,41 dengan waktu pelaksanaan 151 hari yang berarti biaya yang dikeluarkan lebih dari perencanaan dan waktu lebih lambat dari jadwal yang direncanakan.