cover
Contact Name
Yackob Astor
Contact Email
yackobastor@polban.ac.id
Phone
-
Journal Mail Official
potensi@polban.ac.id
Editorial Address
-
Location
Kota bandung,
Jawa barat
INDONESIA
Potensi : Jurnal Sipil Politeknik
ISSN : 14112949     EISSN : 25808133     DOI : -
Core Subject : Engineering,
Potensi: Jurnal Sipil Politeknik merupakan hasil penelitian dalam ilmu ketekniksipilan yang dilakukan oleh Jurusan Teknik Sipil Politeknik Negeri Bandung. Potensi: Jurnal Sipil Politeknik ini terindeks google scholar dengan nomor ISSN 2580-8133 (online).
Arjuna Subject : -
Articles 188 Documents
Pembangunan Tangki Dengan Metode Jack Up Sulardi Sulardi Sulardi
Potensi: Jurnal Sipil Politeknik Vol 20 No 2 (2018): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (341.45 KB) | DOI: 10.35313/potensi.v20i2.1272

Abstract

Salah satu permasalahan dalam pembangunan tangki adalah sering terjadi kegagalan dalam keberterimaanhasil pengelasan (reject) karena kualitas hasil pengelasan yang tidak sesuai (cacat pengelasan)terutama pada pengelasan yang dilakukan diketinggian. Penelitian ini bertujuan untuk memberikangambaran tentang pelaksanaan fabrikasi dan pembangunan tangki dengan metode jack up, yakni pekerjaanfabrikasi dan instalasi atap dan shell tangki serta pengelasan yang dilakukan dibawah dipermukaan tanah,setelah selesai fabrikasi kemudian diangkat keatas dengan metode jack up menggunakan hydraulic jack.Hasil penelitian menunjukan metode jack up terbukti memberikan manfaat lebih baik dari aspek pancamutu (kualitas, biaya, waktu, keselamatan dan moral). Hasil penelitian juga menunjukan bahwa fabrikasidan instalasi tangki dengan metode jack up ini telah direplikasi untuk pembangunan tiga tangki diPertamina RU V Balikpapan, Pertamina RU IV Cilacap, RU III Plaju dan RU VI Balongan.
REKAYASA ULANG SISTEM PENCAHAYAAN DAN PENGKONDISIAN UDARA PADA GEDUNG MAGISTER SAINS TERAPAN POLITEKNIK NEGERI BANDUNG Achmad Renaldi; Dadan Purnama; Mei Sutrisno; Muchtar .
Potensi: Jurnal Sipil Politeknik Vol 21 No 1 (2019): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1316.735 KB) | DOI: 10.35313/potensi.v21i1.1310

Abstract

Optimalisasi penggunaan energi pada suatu gedung bertujuan untuk mengurangi pemakaian energi listrikberlebih, sehingga dapat menekan biaya operasional pada gedung tersebut. Salah satu ide optimalisasi yangdapat direncanakan adalah melakukan rekayasa ulang pada sistem pencahayaan dan pengkondisian udara.Halini coba diterapkan pada gedung magister sains terapan Politeknik Negeri Bandung. Evaluasi sistempencahayaan pada bangunan eksisting dilakukan dengan mengukur nilai lux (tingkat cahaya) pada setiapruangan. Sedangkan evaluasi sistem pengkondisian udara pada bangunan eksisting yang dilakukan adalahmengukur kecepatan angin, suhu udara luar dan dalam ruangan pada jam operasional gedung, sertakelembaban udara. Pengolahan data hasil evaluasi selanjutnya dijadikan acuan untuk menentukan jenis usulandesain baru yang akan direkomendasikan. Untuk sistem pencahayaan, usulan desain yang direkomendasikanadalah penambahan cerobong cahaya, pemasangan glassblock, penggantian warna cat dinding, sertapenggantian jenis dan spesifikasi lampu. Sedangkan untuk pengkondisian udara, usulan yang direkomendasikanadalah desain cross ventilation menggunakan jendela fleksibel, penggunaan exhaust fan, serta pergantian jenisdan spesifikasi komponen pengkondisian udara yang lebih hemat energi. Dari rekayasa ulang yang telahdirencanakan, selanjutnya dilakukan perhitungan biaya operasional untuk jangka waktu 20 tahun kedepan yangmencakup biaya penggunaan listrik, biaya perawatan, biaya penggantian asset, serta biaya investasi (RAB)dengan dipengaruhi oleh kenaikan tarif listrik rata-rata dan infasi pada setiap tahunnya. Berdasarkan hasilperhitungan, didapatkan nilai perbandingan penghematan biaya operasional hasil usulan desain dengan biayaoperasional kondisi eksisting yaitu sebesar 286% dengan nilai NPV hasil desain sebesar Rp. 5.609.940.958
PERENCANAAN ULANG SISTEM PROTEKSI KEBAKARAN PADA GEDUNG SERBAGUNA TEKMIRA JEND. SUDIRMAN NO. 623 BANDUNG Ihsan Silahuddin; Tatang Efendi; Mei Sutrisno; Ruth Ester Ambat
Potensi: Jurnal Sipil Politeknik Vol 21 No 1 (2019): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1334.893 KB) | DOI: 10.35313/potensi.v21i1.1312

Abstract

Kebakaran merupakan salah satu bahaya yang sangat merugikan bagi masyarakat oleh sebab itu diperlukansuatu sistem pencegahan kebakaran untuk mengurangi dampak dan kerugian yang diakibatkan oleh kebakaran.Gedung Serbaguna Tekmira ini berdasarkan hasil evaluasi sistem proteksi kebakaran yang telah dilakukansebelumnya belum memenuhi persyaratan secara penuh sesuai dengan Undang -undang No. 28 tahun 2002tentang bangunan gedung dan Standar Nasional Indonesia (SNI). Perencanaan ulang sistem proteksikebakaran gedung Serbaguna Tekmira ini meliputi, perencanaan sistem sprinkler, hydrant gedung, detectorkebakaran dan penambahan tangga darurat sebagai jalur evakuasi ketika terjadi kebakaran. Hasil dariperencanaan sistem proteksi kebakaran ini adalah 294 titik sprinkler dengan Wet Pipe System, 16 titik hydrantgedung, 49 titik detector kebakaran dan pembuatan tangga melingkar berbahan baja untuk jalur evakuasi saatterjadi kebakaran dan memerlukan biaya sebesar Rp. 6.089.553.838,
Desain Operasional Prosedur Pemeliharaan dan Perawatan pada Gedung Summarecon Digital Center (SDC) Ditinjau Dari Keandalan Bangunan Iswanto .; Lidia Agustina; Taufik Hamzah; Antonius Siswanto
Potensi: Jurnal Sipil Politeknik Vol 21 No 1 (2019): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (488.201 KB) | DOI: 10.35313/potensi.v21i1.1313

Abstract

Gedung Summarecon Digital Center (SDC) merupakan bangunan yang baru beroperasi dan belum tersediannyaacuan pemeliharaan dan perawatan gedung, untuk itu Penelitian ini mengkaji pemeliharaan dan perawatan yangditinjau dari keandalan bangunan. Dalam hal ini dilakukan dua langkah untuk menyelesaikan masalah tersebut.Pertama yaitu melakukan inspeksi lapangan untuk mengetahui kondisi bangunan secara visu al, pengukuranintensitas cahaya, pengukuran tingkat suhu, pengukuran kelembaban, keseragaman beton pada lantai betonbasement dan pengukuran retak eksisting. Kedua yaitu dengan analisis deskriptif untuk mengevaluasi komponenyang ditinjau dan dibandingakan dengan acuan, mengenai aspek keselamatan, aspek kesehatan dan aspekkenyamanan. Selain itu, untuk memenuhi keandalan bangunan telah dibuat desain operasional prosedurpemeliharaan dan perawatan bangunan dalam bentuk matriks serta membuat formulir untuk c eklisnya.Penelitian ini juga telah menghitung besarnya Life Cycle Cost secara sederhana selama kurun waktu 30 tahun,dalam penentuan LCC ini menggunakan metode Net Present Value yang mengahasilkan nilai LCC sebesar Rp.2.224.532.589.590.
PERENCANAAN PRELOADING DENGAN PENGGUNAAN PREFABRICATED VERTICAL DRAIN UNTUK PERBAIKAN TANAH LUNAK PADA JALAN TOL PEJAGAN-PEMALANG Athaya Zhafirah; Dewi Amalia
Potensi: Jurnal Sipil Politeknik Vol 21 No 1 (2019): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (958.152 KB) | DOI: 10.35313/potensi.v21i1.1314

Abstract

alan Tol Pejagan-Pemalang merupakan bagian dari jaringan Jalan Tol Trans Jawa yang menjadisolusi dari permasalahan kemacetan di Jalur Pantai Utara (Pantura). Jalan Tol Pejagan -Pemalangberada di atas tanah lunak yang akan menimbulkan permasalahan geoteknik, seperti daya dukung tanahdasar yang rendah, stabilitas timbunan, dan penurunan yang besar serta berlangsung dalam jangkawaktu yang lama. Tanah dasar yang lunak tersebut tidak mampu untuk menahan beban total timbunanrencana yaitu 8,9 m. Tinggi timbunan maksimum yang mampu ditahan oleh tanah dasar tersebut adalah5 m. Dengan memperhatikan penurunan total yang terjadi, tinggi timbunan pada saat pelaksanaan haruslebih tinggi dari tinggi timbunan rencana. Tinggi timbunan pada saat pelaksanaan akhir adalah 11 mdengan penurunan total yang terjadi sebesar 2,122 m dalam waktu 38,49 tahun. Masalah ini dapatdiatasi dengan memperbaiki tanah dasar menggunakan PVD yang dioptimalkan dengan preloading.PVD adalah lembaran plastik untuk drainase vertikal yang panjang berbahan komposit, terdiri daridrain core dan filter jacket. Dari hasil perencanaan, PVD yang digunakan adalah tipe Ce-Teau DrainCT-882 dengan pola segiempat jarak 1,2 m sedalam 10 m dari muka tanah asli. Penimbunan dilakukanbertahap dengan kecepatan penimbunan 1 m perminggu. Waktu yang dibutuhkan untuk mencapaipenurunan total sebesar 2,122 m dengan metode preloading kombinasi PVD adalah 11 minggu.Biayayang dibutuhkan untuk melakukan pekerjaan penimbunan dan pemasangan PVD sesu ai dengan desainadalah Rp. 3.446.349.317,-.
THE EMPIRICAL ANALYSIS OF SOIL LIQUEFACTION IN IMOGIRI SITE, YOGYAKARTA, INDONESIA Lindung Zalbuin Mase
Potensi: Jurnal Sipil Politeknik Vol 21 No 1 (2019): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (136.785 KB) | DOI: 10.35313/potensi.v21i1.1315

Abstract

A strong earthquake with magnitude of 6.3 Mw, which was later known as the JogjaEarthquake, occurred in the southern part of Yogyakarta Special Province. The earthquakehad resulted in the huge damage to the buildings, public facilities as well as triggering theground failure phenomenon, which was known as liquefaction. An empirical analysis usingthe conventional method was performed to investigate the liquefaction severity for the siteinvestigation data in Imogiri, a site with the high-level of the liquefaction damage duringthe earthquake. The peak ground accelerations varied to 0.3 to 0.4g are also implemented inthe analysis. The results show that the investigated site is dominated by sandy soils. Thesandy soil in Imogiri site is categorised as the liquefiable layer during the Jogja Earthquakeand potentially to liquefy on shallow depth. In general, this study could warn the people forthe impact of soil liquefaction if the stronger earthquake happens in the future.
EVALUASI WAKTU PELAKSANAAN PEKERJAAN PADA PROYEK PEMBANGUNAN GEDUNG BAPPEDA PROVINSI KALIMANTAN UTARA TAHAP III Sepry Rantesalu
Potensi: Jurnal Sipil Politeknik Vol 21 No 1 (2019): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (885.997 KB) | DOI: 10.35313/potensi.v21i1.1316

Abstract

Proyek pada umumnya memiliki batas waktu (deadline), artinya proyek harus diselesaikan sebelum atautepat pada waktu yang telah ditentukan. Berkaitan dengan masalah proyek ini maka keberhasilanpelaksanaan sebuah proyek tepat pada waktunya merupakan tujuan yang penting baik bagi pemilikproyek maupun pelaksana proyek (kontraktor). Penelitian ini menganalisis evaluasi waktu pelaksanaanpekerjaan pada kegiatan Pembangunan Gedung BAPPEDA Provinsi Kalimantan Utara Tahap III untukmemberikan kontribusi biaya paling rendah dengan waktu penyelesaian lebih cepat dengan MetodeProject Evaluation and Review Technique (PERT). Penjadwalan dengan menggunakan metode PERT,proyek Pembangunan Gedung BAPPEDA Provinsi Kalimantan Utara Tahap III, paling cepat dapatdiselesaikan selama 178 hari dengan kemungkinan 0,001 %, paling lambat dapat diselesaikan selama 252hari dengan kemungkinan 99,97%, paling mungkin diselesaikan selama 218 hari dengan kemungkinan50 %.
Analisis Daya Dukung Tiang Bor Dengan Alat Pile Driving Analyzer Test Pada Variasi Diameter Tiang Geni Firuliadhim; Rabiya
Potensi: Jurnal Sipil Politeknik Vol 21 No 2 (2019): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (615.617 KB) | DOI: 10.35313/potensi.v21i2.1339

Abstract

Pile driving analyzer test atau disebut juga pengujian tiang dinamik, merupakan alat untuk mengetahui kapasitas daya dukung fondasi tiang pancang maupun fondasi bore pile. Dalam hal ini, penelitian yang dilakukan adalah untuk mengetahui parameter daya dukung pada fondasi bore pile dengan menggunakan alat pile driving analyzer test. Dari hasil pengujian fondasi tiang berukuran 25 cm mencapai titik ultimit daya dukungnya sebesar 28.3 kN atau setara dengan 2885.751 kg dengan beban yang diberikan adalah 63.5 kg. Mutu beton yang digunakan adalah K225 atau setara dengan 225 kg/cm2. Untuk fondasi tiang berukuran 20 cm memiliki nilai daya dukung ultimit sebesar 13 kN atau setara dengan 1325.61 kg dengan beban yang diberikan adalah 63.5 kg. Mutu beton yang digunakan adalah K225 atau setara dengan 225 kg/cm2. Sedangkan fondasi yang berdiameter 15 cm mencapai titik ultimit sebesar 2.5 kN atau setara dengan 254.925 kg dengan beban yang diberikan adalah 63.5 kg. Mutu beton campurannya adalah K225 atau 225 kg/cm2. Sehingga dari hasil tersebut membuktikan bahwa penampang fondasi tiang yang berbeda berpengaruh besar terhadap nilai daya dukung fondasi tiang tersebut.
Kajian Kuat Tekan Beton di Lingkungan Laut Tropis Banyuwangi Syarifah Khirunnisa; Mirza Ghulam Rifqi; M. Shofi’ul Amin
Potensi: Jurnal Sipil Politeknik Vol 21 No 2 (2019): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1167.55 KB) | DOI: 10.35313/potensi.v21i2.1583

Abstract

Sebagai negara kepulauan dengan wilayah perairan yang lebih luas dibandingkan dengan daratan, pembangunan struktur di daerah laut adalah hal yang tidak dapat dihindarkan di Indonesia. Mempertimbangkan kondisi yang harus dihadapi, maka diperlukan material yang tahan terhadap lingkungan laut. Beton dipilih sebagai bahan bangunan di wilayah laut karena sifatnya yang lebih tahan korosi dibandingkan baja. Akan tetapi tidak dapat diabaikan bahwa beton dapat mengalami kerusakan karena pengaruh lingkungan laut. P. K. Mehta (2003) membagi perusakan beton akibat air laut menjadi tiga zona, yakni atmospheric zone, tidal zone, dan submerged zone. Penelitian ini membahas tentang kuat tekan beton umur 7, 14, dan 28 hari yang diletakkan di lingkungan laut tropis Banyuwangi. Terbagi dalam tiga jenis peletakan sesuai pembagian yang dilakukan oleh P. K. Mehta. Menggunakan benda uji silinder beton berukuran 15 cm x 30 cm, tipe semen PCC, FAS 0.45 dan kuat tekan rencana 35 MPa. Meski kuat tekan beton di lingkungan laut tidak mencapai kuat tekan rencana, namun di setiap umur pengujian kuat tekan beton masih mengalami peningkatan. Semakin besar kontak yang terjadi antara beton dengan air laut maka semakin besar pula penurunan kuat tekan beton yang terjadi. Kuat tekan terendah 28 hari terjadi pada beton submerged zone sebesar 27.16 MPa.
Kinerja Rambu Lalu Lintas dan Dampaknya Pada Kecelakaan (Studi Kasus: Jalan Soekarno Hatta Bandung) Yusmiati Kusuma; Tatang Sumarna; Dewi Mustika; Melina Demar
Potensi: Jurnal Sipil Politeknik Vol 21 No 2 (2019): Potensi: Jurnal Sipil Politeknik
Publisher : Politeknik Negeri Bandung

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (481.684 KB) | DOI: 10.35313/potensi.v21i2.1597

Abstract

Jalan Soekarno Hatta merupakan jalan arteri primer yang sering terjadi kecelakaan. Lokasi kecelakaan paling tinggi di Jalan Soekarno berdasarkan penelitian sebelumnya (2018) terdapat pada 2 STA. Salah satu upaya untuk menekan jumlah kecelakaan berdasarkan faktor lingkungan dengan memasang rambu lalu lintas pada jalan yang rawan kecelakaaan. Sehingga dilakukan terhadap standardisasi identifikasi rambu yang terpasang berdasarkan PM No.13 Tahun 2014 dan pengujian tingkat retroreflektifitas rambu dengan menggunakan alat RetroSign berdasarkan ASTM D4956-04. Rambu yang terpasang di 2 STA tersebut berjumlah 14 buah rambu dengan persentase rambu yang memenuhi standardisasi rambu lalu lintas sebesar 28,57% dan persentase tingkat retroreflektifitas rambu sebesar 7,14%.

Page 7 of 19 | Total Record : 188


Filter by Year

2010 2025


Filter By Issues
All Issue Vol. 27 No. 2 (2025): Potensi: Jurnal Sipil Politeknik Vol. 27 No. 1 (2025): Potensi: Jurnal Sipil Politeknik Vol. 26 No. 2 (2024): Potensi: Jurnal Sipil Politeknik Vol. 26 No. 1 (2024): Potensi: Jurnal Sipil Politeknik Vol. 25 No. 2 (2023): Potensi: Jurnal Sipil Politeknik Vol. 25 No. 1 (2023): Potensi: Jurnal Sipil Politeknik Vol 25 No 1 (2023): Potensi: Jurnal Sipil Politeknik Vol 24 No 2 (2022): Potensi: Jurnal Sipil Politeknik Vol 24 No 1 (2022): Potensi: Jurnal Sipil Politeknik Vol. 23 No. 2 (2021): Potensi: Jurnal Sipil Politeknik Vol 23 No 1 (2021): Potensi: Jurnal Sipil Politeknik Vol 22 No 2 (2020): Potensi: Jurnal Sipil Politeknik Vol 22 No 1 (2020): Potensi: Jurnal Sipil Politeknik Vol 21 No 2 (2019): Potensi: Jurnal Sipil Politeknik Vol 21 No 1 (2019): Potensi: Jurnal Sipil Politeknik Vol 21, No 1 (2019): Potensi: Jurnal Sipil Politeknik Vol 20, No 2 (2018): Potensi: Jurnal Sipil Politeknik Vol 20 No 2 (2018): Potensi: Jurnal Sipil Politeknik Vol 20 No 1 (2018): Potensi: Jurnal Sipil Politeknik Vol 20, No 1 (2018): Potensi: Jurnal Sipil Politeknik Vol 19, No 2 (2017): Potensi: Jurnal Sipil Politeknik Vol 19 No 2 (2017): Potensi: Jurnal Sipil Politeknik Vol 19, No 1 (2017): Potensi: Jurnal Sipil Politeknik Vol 18, No 2 (2016): Potensi : Jurnal Sipil Politeknik Vol 18 No 2 (2016): Potensi : Jurnal Sipil Politeknik Vol 18, No 1 (2016): Potensi: Jurnal Sipil Politeknik Vol 17, No 1 (2015): Potensi: Jurnal Sipil Politeknik Vol 17 No 1 (2015): Potensi: Jurnal Sipil Politeknik Vol 15 No 2 (2013): Potensi: Jurnal Sipil Politeknik Vol 15 No 1 (2013): Potensi: Jurnal Sipil Politeknik Vol 12 No 1 (2010): Potensi: Jurnal Sipil Politeknik More Issue