Elektrika
Published by Universitas Semarang
ISSN : 20850565     EISSN : -     DOI : -
Core Subject : Engineering,
Jurnal eLEKTRIKA diterbitkan oleh Jurusan Teknik Elektro, Fakultas Teknik, Universitas Semarang sejak tahun 2009, dan terakreditasi oleh Kementerian Ristekdikti pada tanggal 29 Januari 2009, dengan No. ISSN 2085-0565. Jurnal eLEKTRIKA adalah jurnal open akses dengan pelibatan mitra bebestari (peer-reviewed yang terbit dua kali dalam setahun, Maret dan Oktober.
Arjuna Subject : -
Articles 122 Documents
Desain Solar Power Inverter pada Sistem Photovoltaic Harmini, Harmini; Nurhayati, Titik
Elektrika Vol. 12 No. 1 (2020): April 2020
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (750.951 KB) | DOI: 10.26623/elektrika.v12i1.1863

Abstract

Solar power inverter is one of the main components in the PLTS system in order to produce the power or energy needed by the load. Solar power inverter is used to convert from DC energy (Direct Current) to AC (Alternating Current) to load. In this research a simulation of a solar power inverter system on a photovoltaic system will be designed. Simulation is done using SIMULINK-MATLAB software. Solar power inverter is designed using a boost converter as a controller and a Full-Bridge Inverter. Boost Converter is designed from 12VDC - 17 VDC to 300 VDC. Full Bridge Inverter produces AC voltage of 240 VAC with modulation index 0.8 and frequency 60 Hz. Total Harmonic Distortion is 46.07%. Power of Photovoltaic Solar panels generated at 3500 Watts at 1000 Watt / m2 irradiation conditions and temperature temperatures of 25 degrees Celsius.
Rancang Bangun Sistem Monitoring dan Pendeteksi Lokasi Kebocoran Pipa Berdasarkan Analisis Debit Air Berbasis IoT Prasetya, Ardi DwI; Haryanto, Haryanto; Wibisono, Kunto Aji
Elektrika Vol. 12 No. 1 (2020): April 2020
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (720.17 KB) | DOI: 10.26623/elektrika.v12i1.2338

Abstract

The purpose of this research is to design and realize a pipe leak detection system that can be monitored with an Android application. Water flow sensor is used to determine the flow of water, with water flow rate analysis it is possible to know the leakage area, pipe leakage rate, and the number of leaks in pipe area if there is a water flow rate decrease. The data is processed with an NodeMCU microcontroller based on Internet of Things (IoT). The accuracy of all water flow sensors after calibration is 97,53%. When testing with the determination of each leaked area the results are appropriate. The reading of each water flow rate decrease that occurs has an accuracy of determiningthe leakage rate of 90,2% while the suitability of reading the number of leakage areas depends on the detection of the leakage area and the classification of the leakage rate. The greater the water flow reads on the sensors, the precission level to determine the level of water pipe leakage is getting better, and vice versa, this is due to sensors having variable variations in flow rate readings.
Analisa Konfigurasi Jaringan FTTH dengan Perangkat OLT Mini untuk Layanan Indihome di PT. Telkom Akses Witel Semarang Muliandhi, Puri; Faradiba, Erlian Husna; Nugroho, Bayu Adi
Elektrika Vol. 12 No. 1 (2020): April 2020
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v12i1.1977

Abstract

The development of increasingly sophisticated technology follows the needs of the community, one of them in the telecommunications world is FTTH (Fiber to the Home) which is an optical signal delivery format from the center of the provider to the homes of costumers by using optical fiber as a medium of delivery. Delivery by using this FTTH technology can save costs and provide better service to customers. The study was conducted by interview and observation methods with network objects and FTTH components belonging to Telkom Semarang and through the literature method by searching some literature. FTTH configuration starts with the ONT to rosette connected using a patchcord cable then from rosette to OTP using an indoor cable then from OTP to ODP outside the home is connected using a dropcore cable. ODP itself is the result of the distribution of distribution cables/ aerial cables leading to ODC. ODC to STO/FTM/ODF using feeder cable. FTTH network is very effective to use, because it can use triple play services (telephone, internet and IPTV) with just 1ONT/ modem at the customer s side.
Monitoring Suhu pada Infant Warmer Menggunakan INCU Analyzer Berbasis Arduino Ningtias, Diah Rahayu; Wahyudi, Bayu; Harsoyo, Imam Tri
Elektrika Vol. 13 No. 1 (2021): April 2021
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v13i1.3118

Abstract

Temperature is the most important parameter in monitoring Infant Warmer medical equipment. In this study, temperature monitoring was carried out on the Lullaby GE Infant Warmer using INCU based on Arduino Uno. The temperature setting used was 34 ° C, 35 ° C, 36 ° C and 37 ° C with each setting repeated 3 times. The temperature sensor used in the INCU analyzer for T1 to T4 is DS18B20, while the T5 uses a DHT22 temperature sensor. At the Infant Warmer temperature, a low error value was obtained for all temperature settings, namely a temperature of 34 ° C with an error of 0.02, a temperature of 35 ° C with an error of 0.03, a temperature of 36 ° C with an error of 0.004 and a temperature of 37 ° C with an error of 0. The INCU analyzer output low temperature is at T5, with temperature settings of 34 ° C, 35 ° C, 35 ° C and 37 ° C respectively 0.009, 0.07, 0.11 and 0.28. While the error value on T1 to T4 ranges from 0.37, namely at T3 for a temperature setting of 35 ° C to 0.84, namely at T3 for a setting of 37 ° C. It can be concluded that the INCU analyzer that has a high degree of accuracy is the T5 using the DHT22 temperature sensor.
Rancang Bangun Modul Kontrol Alat Terapi Batu Ginjal (ESWL) Dengan Mikrokontroler AT-Mega16 Berdasarkan Sistem Pernapasan Manusia Wahyudi, Bayu; Cipta, Kusuma Adi; Nuha ABA, Muhammad Ulin
Elektrika Vol. 12 No. 2 (2020): Oktober 2020
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v12i2.2267

Abstract

Extracorporeal shockwave lithotripsy (ESWL) is the most cost effective treatment option in cases of kidney stones. ESWL uses an energy source called lithotriptor to produce a shock wave that is high in electromagnetic energy in pulses to break down rocks into fine grains of sand and come out naturally with urine. In this study the authors modified the control of the ESWL unit by adding an automatic wave shooting system based on respiration from therapeutic patients using the MPXV7002DP sensor and the ATmega16 microcontroller and applying the 16x2 LCD as a display.The maximum reading capability of this module is 9000 times the active relay, which means that ESWL can shoot as many as 9000 times automatically according to human breathing. This automatic kidney stone therapy module can shoot as many as 3 waves in one breath. Has created a number of inspiration counters and the number of wave shots that ESWL has fired into kidney stone therapy patients.
Analisa Rugi-Rugi Daya Dan Jatuh Tegangan Pada Saluran Transmisi 150 kV GI Pati Bay GI Jekulo Menggunakan ETAP 12.6.0 Anggoro, Bayu Andik; Utomo, Sukarno Budi; Widihastuti, Ida
Elektrika Vol. 12 No. 2 (2020): Oktober 2020
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v12i2.2828

Abstract

In the electric power system, the transmission system is a pathway to transmit electrical energy from the generator to the substation or from the substation to another substation which allows power losses and large voltage drops if the transmission length is relatively far and the overload is very high. affect the reliability of the transmission system. Analysis of power losses and voltage drop on the 150 KV high voltage transmission system at the Pati substation to the Jekulo substation. The analysis was carried out by conducting a survey at the research location then doing manual calculations and calculations using ETAP 12.6.0 software. The research method used was that the researcher collected voltage and current data at 10.00 and 19.00 WIB in one month and the transmission system supporting equipment specifications to be simulated in ETAP 12.6.0 from Pati and Jekulo substations in order to make comparisons between manual calculations and ETAP. 12.6.0.The conclusion of this study is the calculation of power losses manual calculation and simulation of ETAP 12.6.0 has a difference of 2.5% with the value of manual calculation power losses of 685.5 KW and the power losses from The simulation results reached 266.6 KW and the calculation of the presentation of power losses in the transmission line of GI Pati - GI Jekulo reached 6.8% exceeding the service percentage variation limit due to losses according to SPLN No. 72 of 1987 a maximum of 5% at least -10%.
Perancangan Sistem Kontrol CNC Pengebor PCB Otomatis Berbasis Raspberry PI Satrio, Eka; Joni, Koko; Wibisono, Kunto Aji
Elektrika Vol. 13 No. 1 (2021): April 2021
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v13i1.3125

Abstract

Circuit Board (PCB) is a micro-board containing various components electronics used in an automatic circuit. In PCB drilling is usually done human which takes a lot}when the hole in the PCB is getting more and more. And it takes precision when the eye touches the PCB board which gives rise to friction force and can cause drilling. The purpose of this research was the development of tools in the form of automated drills using computers with BCNC software as face-to-face CNC movements. The engine is driven with stepper motor and dc motor as spindle. In this BCNC software the drilling process is done by entering the codes in the form of gcode which can later be read by CNC. The coordinates of the holes in the layout that have been created are obtained by converting the layout into codes called gcode. The process is carried out using PCB designer software. Thoroughness testing on all six axes found an error 1,2% with ten attempts each. PID implementation on DC motor obtained constant value Kp = 54, Ki = 38 and Kd = 0.9. As well as before drilling, the installation of drill bits must be precise so that at the time of spinning, the drill bits do not shake.
Evaluasi Utilitas Bangunan Pada GKB UNISSULA Putro, Adhitio Ekatama; Gunawan, Gunawan; Widihastuti, Ida
Elektrika Vol. 12 No. 2 (2020): Oktober 2020
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v12i2.2321

Abstract

 In the construction of multi-storey buildings, every aspect must be considered in accordance with the rules set out in the Act. Article 7 Paragraph 3 of Law 28/02 states that building construction must meet four aspects, namely safety, health, comfort, and convenience. To support the realization of these aspects, it is necessary to have a building utility. The Joint Lecture Building (GKB) of Sultan Agung Islamic University in Semarang, is a building that has 10 floors and is a busy building because it is used by several faculties, such as the PGSD Faculty, Language Faculty, Communication Faculty, and Nursing Faculty. In the operation of the GKB building, there are several complaints that occur in the GKB such as electricity that often goes out, some rooms have less lighting / dark, queues of elevator users are piling up and visually, the GKB building has the potential of being struck by lightning because it has high above average.Seeing these conditions, the authors conducted a study to evaluate the reliability of buildings based on the utility of the building with methods that have been used in other studies, namely the scoring method that is based on visual inspection and by adding measurement methods, and calculations. From these results found the reliability value of the GKB building on the criterion of health scores got a score of 81, the health and comfort criteria scored 99, the ease criterion scored a score of 98. So the reliability of the GKB building got a score of 92 and was included in the unfit category.
Analisa Optimasi Photovoltaic(PV) 100 W Menggunakan MPPT dengan Alogaritma Perturb dan Observe Setiyawan, Puji; Utomo, Sukarno Budi; Nugroho, Agus Adhi
Elektrika Vol. 13 No. 1 (2021): April 2021
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v13i1.2984

Abstract

This article reviews the optimization of energy generated by solar panels using MPPT. The need for increased power that can be done using MPPT with the P&O algorithm that goes to the load is proven because of the addition of influencing factors.MPPT A technique for keeping solar panels working. to stay within the Maximum Power point (MPP) area. MPP is a pointor point in the VI curve or VP curve in the solar panel where the solar panel works at maximum efficiency and releasesmaximum power. The P&O algorithm is used to keep the MPPT power out panel always in the MPP area by changing thevoltage value before MPPT and after the MPPT Comparison of the results of modeling with the use of techniques developedand special computer programs that have shown satisfactory results. Through comparison of the output power that comes outof the solar panel using MPPT 16.86406 W and without using MPPT of 13.63239 or experiencing an increase of 23%.
Perkiraan Pemakaian dan Kebutuhan Beban Energi Listrik Rayon Juwana Menggunakan Jaringan Saraf Tiruan (Radial Basis Function) Fitriyan, Moh Tamam Edy; Heranurweni, Sri; Harmini, Harmini
Elektrika Vol. 13 No. 1 (2021): April 2021
Publisher : Universitas Semarang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.26623/elektrika.v13i1.3329

Abstract

Along with the development of the times the need for electrical energy is increasing. PT. PLN (Persero) as a company that supplies electrical energy must be able to meet the needs of electrical energy to run a business to supply electric power in an even amount to meet the needs of the household, industrial, social and business sectors.. The purpose of this research to determine how much the growth of electrical loads in 2020 to 2025 at PT. PLN (Persero) Rayon Juwana. To find out the amount of increase in electrical energy required. Electrical data used data for 8 years, from 2012 to 2019. The results of this study are in the form of an estimate of the use and need for load electrical energy load for the next 5 years, from 2020 to 2025, the data used are the number of subscribers, connected power, and the amount of energy using a simulated neural network with the method (radial basis function). the results of this study an increase per year an average of 1% per year. in 2019 the value is 1.07%, in 2020 it is 1.10%, 2021 is 1.21%, for 2022 it is 1.27%, 2023 is 1.28%, 2024 is 1.17% and 2025 is 1.31 %.

Page 5 of 13 | Total Record : 122