cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota semarang,
Jawa tengah
INDONESIA
J@TI (TEKNIK INDUSTRI)
Published by Universitas Diponegoro
ISSN : -     EISSN : 25021516     DOI : -
Core Subject : Engineering,
J@ti Undip: Jurnal Teknik Industri [e-ISSN 2502-1516] merupakan jurnal nasional yang mengangkat tulisan-tulisan penelitian dalam disiplin ilmu teknik industri. Pertama kali terbit sejak tahun 2006 hingga saat ini dengan frekuensi terbit tiga (3) kali dalam setahun. Setiap edisi terbitan berisi 8 artikel jurnal. Terbit setiap Januari, Mei, dan September.
Arjuna Subject : -
Articles 8 Documents
Search results for , issue "Volume 11, No. 2, Mei 2016" : 8 Documents clear
PENENTUAN POLA KELELAHAN FISIK PADA PEROKOK AKTIF DENGAN MENGGUNAKAN METODE RESPONSE SURFACE METHODOLOGY (Studi Kasus: Mahasiswa PS. Teknik Industri UIN Sunan Kalijaga) Farihah, Tutik
J@ti Undip : Jurnal Teknik Industri Volume 11, No. 2, Mei 2016
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2446.497 KB) | DOI: 10.14710/jati.11.2.107-112

Abstract

Penelitian ini bertujuan untuk mengidentifikasi pola kelelahan fisik pada perokok aktif baik di beban kerja ringan, menengah dan beban kerja yang berat dengan faktor suhu dan cahaya. Response Permukaan Metodologi ( RSM ) adalah kumpulan teknik statistik dan matematika yang berguna untuk evaluasi hubungan yang ada pada beberapa faktor kuantitatif terhadap variabel respon. Berdasarkan hasil pengolahan data pada beban kerja ringan dan beban kerja menengah memiliki fungsi pola pelana. Sedangkan pada beban kerja berat memiliki fungsi respon permukaan minimum. AbstractThis study aims to identify workload pattern in active smokers both in  light workload, medium and heavy workload with controlled faktor are temperature and light.Response Surface Metodology (RSM) is a collection of statistical and mathematical techniques useful for evaluation of relationship existing between some controlled experiment faktors and measured responses according to one or more selected criteria. Based on the results on light workload optimization functions have saddle pattern functions so it is with medium workload. While the heavy workload optimization functions are obtained based on the minimum surface.
EVALUASI MANAJEMEN PERAWATAN DENGAN METODE RELIABILITY CENTERED MAINTENANCE (RCM) II PADA MESIN BLOWING I DI PLANT I PT. PISMA PUTRA TEXTILE Sari, Diana Puspita; Ridho, Mukhammad Faizal
J@ti Undip : Jurnal Teknik Industri Volume 11, No. 2, Mei 2016
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (423.709 KB) | DOI: 10.14710/jati.11.2.73-80

Abstract

PT. Pisma Putra Textile adalah perusahaan yang bergerak di bidang pemintalan benang yang memiliki berbagai macam mesin produksi yang cukup sering mengalami kerusakan ketika digunakan pada proses produksi. Oleh karena itu, dibutuhkan kebijakan perawatan optimal yang dapat mengurangi frekuensi kerusakan dan menurunkan biaya perawatan mesin.. Metode yang diterapkan pada penelitian ini adalah Reliability Centered Maintenance (RCM) II. Penelitian difokuskan pada mesin Blowing I, karena memiliki downtime tertinggi. Berdasarkan frekuensi kerusakan mesin komponen yang paling sering rusak yaitu flat belt dan apron berpaku. Perawatan yang diperlukan dilakukan pada permukaan belt bergelombang, belt putus, kayu apron patah, dan paku-paku apron patah dengan scheduled discard task dengan interval perawatan dan Total Cost optimal berurutan yaitu 580 jam dengan TC Rp. 14661546,36, 465 jam dengan TC Rp 18350303,77, 490 jam dengan TC Rp 18966057,60, dan 450 jam dengan TC Rp 13419317,27. Sedangkan perawatan untuk kerusakan karet kendor adalah scheduled restoration task dengan interval perawatan 340 jam dan TC Rp 16338431,41. Total penurunan biaya keseluruhan sebesar Rp 21.587.975,45 atau  20,89% dari biaya perawataan perusahaan. Abstract PT. Pisma Putra Textile is a yarn spinning company which have various  production machines which often breakdown on production process. So, the company should have optimum maintenance policy which could reduce breakdown frequency and maintenance cost. The methods which applied in this research is Reliability Centered Maintenance (RCM). Based on data which was given, it shows that Blowing I Machine have the highest downtime so the research focuses on Blowing I Machine. Based on data which was given, it shows that Blowing I Machine have the highest downtime so the research focuses on Blowing I Machine. Based on machine’s breakdown frequency and total downtime, the results shows that the critical components on Blowing I Machine are flat belt and Apron berpaku component. Based on maintenance interval analysis and optimum total cost shows that maintenance for bumpy flat belt surface, flat belt cut-off, spike lattice wood cut-off, spike lattice cut-off with scheduled discard task is 580 hours and Rp 14.661.546,36 ; 465 hours and Rp. 18.350.303,77 ; 490 hours and Rp. 18.966.057,6 ; 450 hours and Rp. 13.419.317,27 respectively. Then, maintenance interval analysis and optimum total cost for flat belt looses with scheduled restoration task is 340 hours and Rp. 16.338.431,41. So, there's a reduction cost Rp. 21.587.975,45 or 20,89% lower than the company's maintenance cost.
PENINGKATAN KAPASITAS GUDANG DENGAN PERANCANGAN LAYOUT MENGGUNAKAN METODE CLASS-BASED STORAGE Juliana, Heldy; Handayani, Naniek Utami
J@ti Undip : Jurnal Teknik Industri Volume 11, No. 2, Mei 2016
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (261.551 KB) | DOI: 10.14710/jati.11.2.113-122

Abstract

Gudang adalah suatu tempat penyimpanan untuk semua barang-barang hasil produksi maupun penjualan. Fungsinya sebagai tempat penyimpanan memiliki peranan yang sangat vital. Oleh sebab itu diperlukan adanya pengaturan yang tepat dan cepat dalam penggunaan ruang gudang. CV.MDP-Semarang merupakan industri kemasan karton yang berlokasi di Semarang. Tingginya tingkat penggunaan gudang di perusahaan ini membuat effisiensi waktu dan ruang menjadi penting. Dari hasil pengamatan, CV. MDP-Semarang belum memiliki tata letak penyimpanan yang baik. Hal ini terlihat dari cara penyimpanan bahan baku di gudang yang belum mengikuti kaidah tata letak gudang. Pada gudang bahan baku, karton diletakkan secara acak sehingga menyulitkan pencarian, kapasitas gudang bahan baku saat ini dikeluhkan tidak mencukupi kebutuhan. Parameter tata letak gudang bahan baku yang baik adalah dipenuhinya ruang secara maksimal dan pemenuhan terhadap permintaan bahan baku yang lebih cepat. Pada penelitian ini, metode class-based storage dan penggunaan rak, memisahkan karton berdasarkan jenis karton di gudang bahan baku mampu memberikan peningkatan kapasitas gudang. Dengan rancangan tata letak gudang bahan baku usulan dapat meningkatkan kapasitas gudang, sehingga mampu memberikan ruang kosong untuk 64.000 pieces karton. AbstractWarehouse is a storage for all the goods of production and sales. Its function as a storage has a very vital role. Therefore it is necessary to have the proper regulations in the use of warehouse space. CV.MDP-Semarang is the carton packaging industry located in Semarang. The high level of the activity in the warehouse make time and space efficiency becomes important. From the observation, CV. MDP-Semarang do not yet have good storage layout. It is shown from raw material inventory in storage that are not following the principle of good storage layout. In the raw materials storage carton are placed randomly, so it makes the operator difficult to find the goods and the storage become out of capacity to fulfill demand. The good parameters for good storage are the optimal utility and the capapbility to fulfill raw material demands faster. In this paper, class-based storage method and shelf are used to separate carton based on type of carton in raw material storage in order to improve storage capacity. By proposes the design raw material storage layout, the company should be able to increase storage capacity, thus, it will be able to give space for 640.000 pieces of carton.
INTERVENSI KOGNITIF DAN PENDEKATAN RANTAI NILAI DALAM PENINGKATAN PEMANFAATAN TEKNOLOGI INFORMASI DAN KOMUNIKASI DI USAHA KECIL DAN MENENGAH DI BANDUNG Widyanti, Ari; Sunaryo, Indryati
J@ti Undip : Jurnal Teknik Industri Volume 11, No. 2, Mei 2016
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (341.72 KB) | DOI: 10.14710/jati.11.2.81-86

Abstract

Pemanfaatan teknologi informasi dan komunikasi (TIK) di usaha kecil dan menengah (UKM) di Indonesia masih pada tingkat yang belum sesuai harapan. Mempertimbangkan bahwa UKM di Indonesia banyak menyerap tenaga kerja dan menyumbang pendapatan nasional yang cukup besar, serta melihat bahwa pemanfaatan TIK di banyak industri besar telah membawa peningkatan performansi yang cukup signifikan,  peningkatan pemanfaatan TIK di UKM merupakan hal yang penting untuk dilakukan. Penelitian ini dilakukan dengan tujuan untuk memetakan tingkat pemanfaatan TIK di UKM dan mengaplikasikan intervensi kognitif dan pendekatan rantai nilai dalam meningkatkan pemanfaatan TIK di UKM. Pemetaan pemanfaatan TIK dilakukan melalui survey dengan menggunakan kuesioner terstruktur dan wawancara yang melibatkan 61 UKM di berbagai bidang di Bandung. Hasil pemetaan pemanfaatan TIK di UKM menunjukkan bahwa pemanfaatan TIK di UKM sebatas pada tujuan pemasaran produk dan sebatas pada penggunaan website. Kendala utama pemanfaatan TIK di UKM adalah faktor SDM terutama berkaitan dengan keterbatasan pengetahuan dan informasi. Berdasarkan hasil pemetaan, selanjutnya, intervensi dilakukan melalui edukasi/kampanye dengan materi mengenai rantai nilai pada 30 UKM yang bergerak di bidang fashion. Hasil intervensi menunjukkan bahwa level pengetahuan dan intensi/kemauan untuk menerapkan TIK di UKM selain untuk kepentingan pemasaran (misalnya untuk perancangan produk dan hubungan dengan pemasok) semakin meningkat. Implikasi dari hasil penelitian ini dibahas lebih lanjut.  AbstractThe use of information and communication technology (ICT) in small and medium enterprise (SME) in Indonesia is at low level. Considering that SME in Indonesia employ a lot of people and contribute to Gross Domestic Product (GDP) as well as improve performance of industries,  coupled with low level of ICT use in Indonesian SME, ICT’ used in SME must be increased. Therefore, this study aims to map the use of ICT in SME in Bandung, and to apply cognitive intervention and value chain approach in increasing ICT use in SME.Mapping of ICT use in SME was conducted by survey with structured questionnaire and interview involving 61 SME in Bandung. Result shows that ICT use in SME is limited only for product marketing and is mostly using website.  Main constraint of ICT use in SME is related with human resource capability in particular related with limited knowledge and information about ICT use. Based on mapping result, intervention was conducted through education or campaign with value chain content on 30 SME in fashion. Intervention result shows that knowledge level and intention to implement ICT in SME other than marketing purpose is increasing. Implication of the results is discussed
USING E-CATALOG SYSTEM TO REDUCE COST IN PROCUREMENT OF DRUGS Suliantoro, Hery; Permatsari, Eldinda Sazida; Handayani, Naniek Utami
J@ti Undip : Jurnal Teknik Industri Volume 11, No. 2, Mei 2016
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (268.699 KB) | DOI: 10.14710/jati.11.2.123-128

Abstract

The price of drugs in Indonesia is still relatively expensive in both the government and private sectors. A survey conducted in 2004 showed that the price of patented drugs in Indonesia is 22 to 26 times higher than the International Reference Price (IRP). As for generic drugs, though cheaper than patented drugs, the price is still nine times higher than the IRP. To overcome these problems, the government facilitated the procurement of generic drugs by using the e-Catalog. But not all hospitals can purchases drugs through the e-Catalog, some still use the conventional methods to supply the needs of medicine where the prices are more expensive than the prices of the e-Catalog. The case studies carry out in one of private hospital, and selection of items examined using Kraljic Portfolio Matrix. After doing research, the selected item that is on strategic items is Omeprazole. The price difference is due to different contract system. In the conventional way, the contract made between the Hospital and the main distributor. While,  the e-Catalog way, contracts made directly to the pharmaceutical factory through the framework contract with government (LKPP). In the future, the conventional way must be abandoned, because through the e-Catalog, procurement is more efficient, thereby reducing time and costs
KLASTER INDUSTRI SEBAGAI STRATEGI PENINGKATAN DAYA SAING AGROINDUSTRI BIOENERGI BERBASIS KELAPA SAWIT Papilo, Petir; Bantacut, Tajuddin
J@ti Undip : Jurnal Teknik Industri Volume 11, No. 2, Mei 2016
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (550.818 KB) | DOI: 10.14710/jati.11.2.87-96

Abstract

Kajian ini bertujuan untuk memberikan gambaran tentang dampak dari pelaksanaan program klaster industri terhadap peningkatan daya saing industri bioenergi berbasis kelapa sawit nasional. Melalui pendekatan analisis perbandingan yang merujuk pada berbagai kajian terdahulu, dapat diketahui bahwa penerapan strategi klaster industri memberikan pengaruh positif terhadap tiga klaster agroindustri kelapa sawit nasional yang berada di Provinsi Riau, Sumatra Utara dan Kalimantan Timur. Berdasarkan penilaian terhadap empat elemen daya saing, seperti aglomerasi perusahaan, nilai tambah dan rantai nilai, jejaring kerjasama serta infrastruktur ekonomi, menunjukkan bahwa telah  terjadi peningkatan nilai daya saing dari ketiga klaster industri sebesar masing-masingnya 0,503, 0294 dan 0,232. AbstractThis study aims to provide an overview of the implementation impact of industrial cluster program to increase the competitiveness of the national agro-industry bioenergy based on palm oil. Through a comparative analysis approach that refers to previous studies, it is known that the implementation of the industrial cluster strategy has a positive influence on the three national oil palm agro-industrial clusters that located in the Riau Province, North Sumatra and East Kalimantan. Based on the assessment of the four elements of competitiveness, such as agglomeration company, value-added and value chains, networks and infrastructure, indicate that there has been an increase in the competitiveness value of the three clusters agro-industries by each 0.503, 0294 and 0.232.
OPTIMASI PARAMETER MESIN LASER CUTTING TERHADAP KEKASARAN DAN LAJU PEMOTONGAN PADA SUS 316L MENGGUNAKAN TAGUCHI GREY RELATIONAL ANALYSIS METHOD R, Rakasita; BW, Karuniawan; Juniani, Anda Iviana
J@ti Undip : Jurnal Teknik Industri Volume 11, No. 2, Mei 2016
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (568.44 KB) | DOI: 10.14710/jati.11.2.97-106

Abstract

Optimasi parameter adalah teknik yang digunakan pada proses manufaktur untuk menghasilkan produk terbaik. Penelitian ini bertujuan untuk mengoptimasi parameter CNC laser cutting, yaitu titik fokus sinar laser, tekanan gas cutting dan cutting speed untuk mengurangi variasi terhadap respon kekasaran dan laju pemotongan pada material SUS 316L. Masing-masing parameter memiliki 3 level dan pada penelitian ini menggunakan matriks orthogonal L9 (34). Metode ANOVA dan Taguchi digunakan untuk menganalisis data hasil percobaan. Optimasi kekasaran minimum permukaan dan laju pemotongan maksimum pada proses laser cutting dilakukan dengan menggunakan Grey relational analysis. Eksperimen konfirmasi digunakan untuk membuktikan hasil optimal yang telah didapatkan dari metode Taguchi Grey relational analysis. Hasil eksperimen menunjukkan bahwa Taguchi Grey relational analysis efektif digunakan untuk mengoptimasi parameter pemesinan pada laser cutting dengan multi respon. AbstractParameter optimization is used in manufacturing as an indicator to produce the best manufacturing product. This paper studies an optimization parameters of CNC laser cutting such as focus of laser beam, pressure cutting gases and cutting speed for reducing variation of surface roughness and cutting rate on material SUS 316L. Based on L9(34) orthogonal array parameters, it is analized using ANOVA based on Taguchi method. In order to optimaze the minimum surface roughness and maximum cutting rate in laser cutting process, it is used Grey relational analysis. The confirmation experiments used to validate the optimal results that has done by Taguchi method. The results show that the Taguchi Grey relational analysis is being effective to optimize the machining parameters for laser cutting process with two responses.
ANALISIS KINERJA PROYEK PEMBANGUNAN RUMAH SAKIT BANYUMANIK II DENGAN MENGGUNAKAN EARNED VALUE ANALYSIS (EVA) DAN PROJECT EVALUATION REVIEW TECHNIQUE (PERT) Susanty, Aries; Pekerti, Adi Luhung; Sari, Diana Puspita
J@ti Undip : Jurnal Teknik Industri Volume 11, No. 2, Mei 2016
Publisher : Departemen Teknik Industri, Fakultas Teknik, Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (845.559 KB) | DOI: 10.14710/jati.11.2.61-72

Abstract

Penelitian ini bertujuan untuk untuk mengevaluasi kinerja proyek pembangunan Rumah Sakit Banyumanik II serta memberikan rekomendasi penjadwalan ulang atas pelaksanaan proyek teresebut. Penilaian kinerja proyek pembangunan Rumah Sakit Banyumanik II akan dilakukan dengan menggunakan Earned Value Analysis (EVA), sedangkan penjadwalan ulang atas pelaksanaan pekerjaan proyek tersebut akan dilakukan dengan menggunakan metoda Project Evaluation and Review Technique (PERT). Hasil penilaian kinerja proyek dengan menggunakan EVA menunjukkan bahwa pada hari 315, kinerja proyek kurang baik. Perbandingan antara estimasi nilai (value) pekerjaan fisik yang sebenarnya yang telah selesai dengan porsi total estimasi biaya yang sudah disetujui untuk dikeluarkan untuk proyek  selama 315 hari (scheduling performance index) memiliki nilai  kurang dari 1 (76,8%). Pengerjaan proyek tertinggal dari jadwal yang telah ditetapkan. Perbandingan nilai antara estimasi nilai (value) pekerjaan fisik yang sebenarnya yang telah selesai dengan biaya total langsung maupun tidak langsung yang digunakan dalam rangka menyelesaikan proyek sesuai aktivitasnya (cost performance index) selama 315 hari memiliki nilai kurang dari 1 (91,8%). Biaya proyek melebihi biaya yang dianggarkan sampai dengan periode tersebut. Selanjutnya, terdapat beberapa skenario untuk penyelesaian proyek apabila  penjadwalan ulang atas sisa kegiatan dari  proyek dilakukan dengan mengacu pada kondisi proyek pada hari ke-315. Jika sisa kegiatan proyek dipercepat dan proyek dapat diselesaikan dalam kurun waktu 117 hari, maka total biaya yang diperlukan adalah Rp.4.787.828.482, Jika sisa kegiatan proyek  dipercepat dan proyek dapat diselesaikan dalam kurun waktu 113 hari, maka biaya yang diperlukan adalah Rp  4.800.288.482, Jika sisa kegiatan proyek  dipercepat dan proyek dapat diselesaikan dalam kurun waktu 103 hari, maka biaya yang diperlukan adalah Rp.5.014.688.482. Jika sisa kegiatan proyek  dipercepat dan proyek dapat diselesaikan dalam kurun waktu 102 hari, maka baiya yang diperlukan adalah Rp.5.053.453.482; dan jika sia kegiatan proyek  dipercepat dan proyek dapat diselesaikan dalam kurun waktu 94 hari maka biaya yang diperlukana adalah Rp.5.397.573.482. AbstractThis study aims to evaluate the performance of the construction project of Banyumanik II Hospital and provide some recommendations for project rescheduling. Earned Value Analysis (EVA) is used as a method for evaluating a project performance; whereas, Project Evaluation and Review Technique (PERT)are used as a method for project rescheduling. The result of the evaluation of project performance using EVA shows that the construction project of Banyumanik Hospital II has poor performance on day 315. The comparison between the estimation of the original budget that has been earned by actual work completed and the planned time-phased baseline of the value of the work scheduled (scheduling performance index) on day 315 less than 1 (76.8%). Its mean the project behind the schedule. The comparison between the estimation of the original budget that has been earned by actual work completed and actual cost of the work completed on day 315 also less than 1 (91,8%. Its mean the project over cost. Then, based on the condition of the construction project on day 315,  we can make some scenario of project completion. If the project is completed in 117 days,  the total cost for remaining activity  will be IDR  4.787.828.482. If the  project is completed in 113 days, the total cost for remaining activity will be IDR.  4.800.288.482, If the project is completed in 103 days, the total cost for remaining activity will be IDR. 5.014.688.482. If the project is completed in 102 day, the total cost for remaining activity will be Rp.5.053.453.482; and if the project is completed in 94 days, the total cost for remaining activity will be IDR. 5.397.573.482.

Page 1 of 1 | Total Record : 8


Filter by Year

2016 2016


Filter By Issues
All Issue Vol 20, No 3 (2025): September 2025 Vol 20, No 2 (2025): Mei 2025 Vol 20, No 1 (2025): Januari 2025 Vol 19, No 3 (2024): September 2024 Vol 19, No 2 (2024): Mei 2024 Vol 19, No 1 (2024): Januari 2024 Vol 19, No 2 (2024): Article In-Press Vol 18, No 3 (2023): September 2023 Vol 18, No 2 (2023): Mei 2023 Vol 18, No 1 (2023): Januari 2023 Vol 17, No 3 (2022): September 2022 Vol 17, No 2 (2022): Mei 2022 Vol 17, No 1 (2022): Januari 2022 Vol 16, No 4 (2021): Edisi Khusus ACISE 2021 Vol 16, No 3 (2021): September 2021 Vol 16, No 2 (2021): Mei 2021 Vol 16, No 1 (2021): Januari 2021 Vol 15, No 3 (2020): September 2020 Vol 15, No 2 (2020): Mei 2020 Vol 15, No 1 (2020): Januari 2020 Vol 14, No 3 (2019): September 2019 Vol 14, No 2 (2019): Mei 2019 Vol 14, No 1 (2019): Januari 2019 Vol 13, No 3 (2018): September 2018 Volume 13, No. 2, Mei 2018 Volume 13, No. 1, Januari 2018 Volume 12, No. 3, September 2017 Volume 12, No. 2, Mei 2017 Volume 12, No. 1, Januari 2017 Volume 11, No. 3, September 2016 Volume 11, No. 2, Mei 2016 Volume 11, No. 1, Januari 2016 Volume 10, No. 3, September 2015 Volume 10, No. 2, Mei 2015 Volume 10, No. 1, Januari 2015 Volume 9, No.3, September 2014 Volume 9, No.2, Mei 2014 Volume 9, No.1, Januari 2014 Volume 8, No.3, September 2013 Volume 8, No.2, Mei 2013 Volume 8, No.1, Januari 2013 Volume 7, No.3, September 2012 Volume 7, No.2, Mei 2012 Volume 7, No.1, Januari 2012 Volume 6, No.3, September 2011 Volume 6, No.2, Mei 2011 Volume 6, No.1, Januari 2011 Volume 5, No.3, September 2010 Volume 5, No.2, Mei 2010 Volume 5, No.1, Januari 2010 Volume 4, No. 3, September 2009 Volume 4, No. 2, Mei 2009 Volume 4, No. 1, Januari 2009 Volume 3, No.3, September 2008 Volume 3, No.2, Tahun 2008 Volume 3, No.1, Januari 2008 Volume 2, No.2, Mei 2007 Volume 2, No.1, Januari 2007 Volume 1, No.3, September 2006 Volume 1, No.2, Mei 2006 Volume 1, No.1, Januari 2006 More Issue