cover
Contact Name
Syaiful
Contact Email
-
Phone
+6281282738786
Journal Mail Official
jrs.astonjadro@uika-bogor.ac.id
Editorial Address
Gedung Ir. Prijono Hardjosentono Universitas Ibn Khaldun Bogor Jl. KH. Sholeh Iskandar KM 2 Kedung Badak Tanah Sareal Kota Bogor 16161
Location
Kota bogor,
Jawa barat
INDONESIA
Astonjadro
ISSN : 23024240     EISSN : 26552086     DOI : http://dx.doi.org/10.32832/astonjadro
Core Subject : Engineering,
Astonjadro: Jurnal Rekayasa Sipil adalah jurnal ilmiah dibidang teknik sipil p-ISSN : 2302-4240 dan e-ISSN : 2655-2086. Jurnal Rekayasa Sipil Astonjadro diterbitkan untuk mengapresiasi dan memberikan informasi ilmiah bagi peneliti, dosen serta para profesional. termasuk dalamnya pengembangan model dan konsep penelitian yang mengacu secara berkesinambungan. Jurnal Astonjadro diterbitkan oleh Fakultas Teknik dan Sains Universitas Ibn Khaldun Bogor, terbit dua kali dalam satu tahun yaitu bulan Juni dan Desember.
Articles 597 Documents
Water Treatment Plant Operational Costs Efficiency Strategy with Green Concept and Value Engineering Hendy Gunawan Putra; Budi Susetyo
ASTONJADRO Vol. 15 No. 3 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i3.22450

Abstract

The government prioritizes targets 100% access to drinking water through Vision 2030, with a service coverage target of 94.61% in Tangerang Regency by 2030. Water Treatment Plants (WTPs) are a crucial component of clean water supply systems, yet their operation poses environmental impacts. This research analyzes the operational cost efficiency of WTPs by integrating green concepts and Value Engineering (VE) methods. The aim is to identify economical and environmentally friendly solutions without compromising water quality and quantity, by pinpointing key factors influencing operational cost efficiency. The methodology encompasses literature review, hypothesis formulation, and data collection via questionnaires, analyzed using Structural Equation Modeling (SEM) and VE studies. Results indicate that Sustainable Technology with Renewable Energy Use and Innovation Implementation are the most influential variables. A case study at PERUMDAM TKR WTP applies VE and Life Cycle Cost Analysis (LCCA) for green concept operational cost analysis. VE results in an 8.97% cost increase, amounting to IDR 1,717,378,957. LCCA shows green concept investment in WTPs is viable with NPV > 0 (IDR 14,076,121,227.33), IRR of 16.42%, and a Payback Period of 8.60 years.
Material Waste Analysis in Building Structural Works Using the Lean Construction Method Gea Geby Aurora Syafridon; Rezky Ariessa Dewi; Syahrizal Syahrizal; Gina Cynthia R Hasibuan; Indra Jaya; Nurul Ika Putri Dalimunthe; Ananta Thariq
ASTONJADRO Vol. 15 No. 3 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i3.22451

Abstract

The lean construction approach is a systematic framework offered to identify and minimize non-value-adding processes that cause material waste in construction projects, which contribute to inefficiencies, cost overruns, and decreased project performance. This study investigates the types and causes of material waste in the construction of a public infrastructure project by applying lean construction principles. Several challenges were observed during implementation, including frequent design modifications, specification changes, limited storage capacity, and various on-site technical issues. The research utilizes key project documents such as the S-curve, Bill of Quantities (BoQ), and As-Built Drawings to analyze material use and waste patterns. The methodological steps include identifying high-cost materials, conducting a Pareto analysis, calculating installed material volumes, performing waste level assessments, and evaluating waste-generating activities based on lean waste categories. The findings reveal that the most prominent types of waste were defect, overproduction, waiting, and inventory. Defects were primarily caused by changes in building specifications. Overproduction occurred due to insufficient optimization during planning. Waiting-related waste was a result of untimely ordering of materials, while inventory-related waste stemmed from inadequate material storage practices. The identification of high-cost materials and Pareto analysis revealed four types of materials with the highest potential for waste generation: 16 mm diameter reinforcing steel bars (D16), 8 mm diameter reinforcing steel bars (Ø8), Portland cement, and 13 mm diameter reinforcing steel bars (D13), and according to the waste level analysis, the highest waste level percentage is D13 Deformed Steel Bars with a waste volume of 1138,18 kg and a waste level of 4,035%. The study underscores the importance of proactive material management and lean-based planning to enhance project efficiency and sustainability.
Comparative Analysis Between the Star Rating iRAP Method and ULFJ With Star Rating Method Ayu Putu Widhyarti; Budi Hartanto Susilo; Darmawan Pontan
ASTONJADRO Vol. 15 No. 3 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i3.22461

Abstract

Road traffic accidents remain a major problem within Indonesia's road transport system, resulting in significant social and economic impacts. One of the ways to enhance road safety is undertaken through infrastructure risk assessments using a star rating approach. Currently, these assessments are conducted via two methods: the International Road Assessment Programme (iRAP) Star Rating method, which is an international standard, and the Road Functional Feasibility Assessment (ULFJ) Star Rating method, developed specifically for Indonesian conditions. This study aims to compare the road safety assessment results of these two methods, as well as to analyse their accuracy through ground truth validation and the sensitivity of infrastructure attributes to changes in risk values. The novelty of this research lies in the ground truth validation and attribute sensitivity testing of each method in assessing road safety risks. The analysis was conducted on the Pekutatan–Antosari national road section in Bali Province, using road segments as the units of analysis. Comparisons were made regarding the Star Rating Score (SRS) and star categories, with accuracy tested against actual accident data representing collective and personal risk. Furthermore, sensitivity testing was performed through attribute change scenarios to identify the factors most influential to road safety risk levels. The results indicate differences in risk values and star categories between the iRAP and ULFJ methods, influenced by variations in attribute structure, Crash Modification Factors (CMF), and approaches to traffic characteristics and road users. While the iRAP method excels in analytical depth and sensitivity to physical road attributes, the ULFJ method demonstrates a higher level of alignment with actual accident data and is more responsive to operational attributes. These findings suggest that the ULFJ method is more representative within the context of national technical standards for assessing road safety risks on the Pekutatan–Antosari section.
Comparative Study of Earthquake Spectrum Response Parameters of SNI 1726-2012 Design Against SNI 1726-2019 in Batam City Ni Kadek Astariani; I Putu Raditya Hiswara; I Gede Ardi Yudha Pratama; I Gede Kerta Yasa; I Putu Agus Harry Calvin
ASTONJADRO Vol. 15 No. 3 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i3.22589

Abstract

This study analyzes the impact of the seismic standard transition from SNI 1726:2012 to SNI 1726:2019 on seismic design parameters in the Batam City region. The primary focus is to evaluate changes in design spectral acceleration values at short periods and 1-second periods across various site classifications, including hard, medium, and soft soil. The research methodology involves collecting geographic coordinates across all districts in Batam to determine base rock parameter values, which are subsequently adjusted using site coefficients according to the latest regulations. The analysis reveals a consistent upward trend in seismic design parameters throughout all research locations. The most significant increase occurred in the soft soil classification, where soil amplification effects in the latest standard yield higher earthquake load values compared to the previous standard. These findings emphasize that the updated national seismic map directly enhances the structural safety standards for buildings in Batam. The results of this study are expected to serve as a reference for construction practitioners and local authorities in designing earthquake-resistant buildings that align with the latest seismic risk levels to mitigate potential structural failures due to earthquake loads not accommodated in older designs.
Performance Assessment of Construction Projects Using Earned Value Indicators: A Case Study of the Bima Grand Mosque Rini Pebri Utari; Lintang Satiti Mahabella; Lourina Evanale Orfa
ASTONJADRO Vol. 15 No. 3 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i3.22646

Abstract

This study evaluates the cost and schedule performance of the Bima Grand Mosque construction project using the Earned Value Management (EVM) method as an comprehensive project control approach. A descriptive quantitative case study was conducted using cumulative project progress data at two critical monitoring points, namely week 55 and week 69. The analysis employed key EVM indicators, including Budgeted Cost of Work Scheduled (BCWS), Budgeted Cost of Work Performed (BCWP), Actual Cost of Work Performed (ACWP), Schedule Variance (SV), Cost Variance (CV), Schedule Performance Index (SPI), and Cost Performance Index (CPI). The results indicate that at week 55 the project was slightly on schedule, with an SPI of 1.001, but experienced cost inefficiency, as reflected by a CPI of 0.990. At week 69, project performance declined, marked by schedule delays and increasing cost overruns, with SPI and CPI values of 0.963 and 0.956, respectively. In addition, the estimated cost at completion increased, accompanied by a slight extension of the projected completion time. The novelty of this study lies in the milestone-based application of EVM to capture dynamic changes in project performance, providing early warning information to support effective cost and schedule control. The findings confirm that EVM is a reliable approach for evaluating construction project performance and facilitating informed managerial decisions.
Behavoir of Precast Concrete Columns with Steel Dowels H Profile on Cyclic Testing Lalu Arya Ngendung Sumantri; Ashar Saputra; Djoko Sulistyo
ASTONJADRO Vol. 15 No. 3 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i3.22718

Abstract

In the development of today's development, concrete is the most widely used material in development in the field of civil engineering, for buildings, bridges, dams, and other constructions. The use of precast concrete building structure systems can reduce the negative impact on environmental pollution. Precast concrete structure systems are also very effective for reducing labor requirements and as a relatively high labor wage solution. Precast concrete structures are generally planned by the emulsion method, which involves considering the structure to be monolithic, so that the precast concrete structure is planned and adjusted to the regulations that apply to monolithic concrete frames. The use of precast concrete in building construction is more efficient when compared to monolith concrete. However, there are major problems in the installation of precast concrete systems that use a wet connection system. Inaccuracies or deviations that do not correspond to the planned dimensional tolerances can affect the stress distribution in the structure to be built. Therefore, the joints on the precast columns must be designed to withstand the force of the earthquake. In a study related to the precast concrete column joint system using an H profile, the number of test specimens to be studied is 2, with an axial compression variation of 0.4. The research method used in this study related to the test object is part of a prototype of a 5-storey building that functions as a simple rental apartment (rusunawa) located on Karimunjawa Street, Gedanganak Village, West Ungaran Regency. Buildings with a column distance of 500 cm, height of each floor 350 cm, reinforced concrete floor slabs 13 cm thick. The materials and tools used are Concrete with K-350 quality, 420 MPa fy rebar steel, H fy 240 MPa steel profile, and fy 240 MPa steel plate. Loading process: The precast concrete column joint test object will be cyclically loaded back and forth under axial compression. The provisions of the charging used are regulated in SNI 7834:2012.
Optimization Strategies for Tidal Swamp Irrigation Operation Based on Hydroinformatics: Research Trends and Future Gaps Ayu Risnawatie; S. Imam Wahyudi; Moh. Faiqun Ni’am
ASTONJADRO Vol. 15 No. 3 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i3.22744

Abstract

Tidal swamp irrigation management faces complex challenges due to hydrological dynamics, fluctuations in water quality (pH and salinity), and limitations of manual operating systems. This article presents a systematic literature review (SLR) on the development of the Operation and Maintenance (O&M) optimization model of swamp irrigation networks with the integration of hydroinformatics technology. Using the PRISMA protocol, this study reviewed the literature from reputable databases (Scopus, ScienceDirect, and Google Scholar) in the 2015-2025 time frame. The results of the review show a methodological shift from conventional rule-based approaches towards IoT-based decision-making systems, real-time sensors, and advanced optimization algorithms such as MILP and NMPC. Key findings identify research gaps in the integration of multi-criteria optimization models that bring together aspects of agricultural production, energy efficiency, and wetland environmental protection in near real-time. This article provides a roadmap for the development of future decision support systems (DSS) for swamp irrigation, especially in the context of tidal lands in Indonesia.
Development of the Civil Engineering Laboratory Building at Ibn Khaldun University Bogor Muhamad Lutfi; Nurul Chayati; Syaiful Syaiful; Oman Asroman; Muhammad Khaerul Insan
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.19295

Abstract

This research aims to develop the design and structure of the Civil Engineering laboratory building, by considering aspects of safety, health, comfort, and security based on SNI 2847-2019. The method used is primary data collection measuring the area to be built, then a design plan and structural analysis is carried out using the Special Moment Resisting Frame System (SRPMK) method based on the Seismic Design Category (DKDS-D) with the ETABS application. The results of the design development and structural analysis of the laboratory building consist of 3 floors with a building area of 1,842 m², concrete deck roof. Structural material specifications which used are concrete quality (fc') 25 Mpa, reinforcing steel quality (Fy) 420 Mpa and (Fy) 240 Mpa, column dimensions are K1 50x50 cm, K2 30x50 cm, K3 25x30 cm, main beam dimensions are B1 35x55 cm, B2 30x45 cm, B3 30x40 cm, secondary beam is B3 25x30 cm, floor slab thickness is 15 cm and roof slab thickness is 12 cm. The first floor facilities are designed for Structures, Soil Mechanics, Water Resources, and Environmental Engineering study laboratories with supporting facilities such as reception rooms, lecturer rooms, classes, tool rooms, and practice rooms. The second floor accommodates the Transportation laboratory which is equipped with a meeting room, archive center, and control and server rooms to support the operation and documentation of academic activities. The third floor is focused on the implementation of the Tri Dharma of Higher Education, providing lecturer rooms, lecture rooms, archive rooms, and co-working spaces to support academic interaction and collaboration. The roof deck is designed for maintenance activities and a water reservoir. The cost budget plan for the civil engineering laboratory building is Rp 4,143,962,741.00.
Drainage Planning for the Bojong Gede Underpass Muhammad Yuzar Farhan; Feril Hariati; Muhammad Hasan Wicaksono
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.22143

Abstract

Underpasses are commonly used to reduce congestion caused by level crossings, but their position below ground elevation creates a significant risk of water accumulation, making drainage planning a critical component. This study presents the drainage system design for an underpass located approximately 675 meters from Bojong Gede Station toward Jakarta. The design flood discharge was calculated based on SNI 2415:2016, including the determination of design rainfall, rainfall intensity, composite runoff coefficient, and peak discharge estimation. With a catchment area of 30,000 m², a composite runoff coefficient, and a 2-year design rainfall of 126.3 mm, the resulting design flood discharge is 0.792 m³/s. The drainage system utilizes a sump pit and pumps. Analysis shows that the sump pit would reach full capacity in approximately two hours without pumping, requiring six pumps with a capacity of 135 L/s per unit to ensure the underpass remains operational without flooding. This design can serve as a reference for similar underpass drainage planning in urban areas with comparable flood risk.
Development of a Safety Culture Maturity Model for Planning Consultants to Improve Construction Safety Performance Siti Kholifah Syaja'ah; Rossy Armyn Machfudiyanto
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.22194

Abstract

The construction industry continues to record high accident rates, partly due to the limited integration of safety considerations during the design stage. Planning consultants play a strategic role in embedding safety principles early in the project lifecycle; however, prior studies indicate that their safety culture maturity remains low, leading to weak communication practices, inadequate evaluation mechanisms, and insufficient institutionalization of safety values . These conditions create the problem of inconsistent safety performance and unclear linkage between safety-culture variables and project outcomes. Accordingly, the research problem is formulated to identify key safety-culture factors influencing safety and project performance, evaluate maturity levels, and develop a measurable model tailored for planning consultants. This study aims to support accident-prevention efforts and enhance design-stage safety management. This research is limited to nine safety-culture variables evaluated through expert validation and a survey of 125 respondents, operationalized using Structural Equation Modeling–Partial Least Squares (SEM-PLS) to test the measurement and structural models. Findings confirm that all indicators are valid and reliable, and all structural relationships are statistically significant. Safety Evaluation and Learning emerges as the most influential variable in improving Safety Performance, while the model demonstrates strong predictive ability with R² values of 0.948 for safety performance and 0.935 for project performance. Safety-maturity assessment further shows that planning consultants remain at the Compliant level, with several indicators still Reactive, highlighting the need to strengthen cross-disciplinary communication and continuous learning. These results provide a scientifically grounded model for assessing and improving safety-culture maturity to elevate organizational readiness toward Proactive and Resilient levels.