cover
Contact Name
Syaiful
Contact Email
-
Phone
+6281282738786
Journal Mail Official
jrs.astonjadro@uika-bogor.ac.id
Editorial Address
Gedung Ir. Prijono Hardjosentono Universitas Ibn Khaldun Bogor Jl. KH. Sholeh Iskandar KM 2 Kedung Badak Tanah Sareal Kota Bogor 16161
Location
Kota bogor,
Jawa barat
INDONESIA
Astonjadro
ISSN : 23024240     EISSN : 26552086     DOI : http://dx.doi.org/10.32832/astonjadro
Core Subject : Engineering,
Astonjadro: Jurnal Rekayasa Sipil adalah jurnal ilmiah dibidang teknik sipil p-ISSN : 2302-4240 dan e-ISSN : 2655-2086. Jurnal Rekayasa Sipil Astonjadro diterbitkan untuk mengapresiasi dan memberikan informasi ilmiah bagi peneliti, dosen serta para profesional. termasuk dalamnya pengembangan model dan konsep penelitian yang mengacu secara berkesinambungan. Jurnal Astonjadro diterbitkan oleh Fakultas Teknik dan Sains Universitas Ibn Khaldun Bogor, terbit dua kali dalam satu tahun yaitu bulan Juni dan Desember.
Articles 597 Documents
Integrating BMS Economic Evaluation with Random Forest Algorithm for Bridge Maintenance Intelligent Prioritization Ismail Wahyudi; Akhmad Aminullah; Suprapto Siswosukarto
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23672

Abstract

Bridges have a long design life, but over time, their function and quality decline due to material degradation and other factors. Therefore, a bridge management system (BMS) is crucial for making appropriate maintenance decisions. This study developed a model to determine bridge maintenance priorities on the Solo-Ngawi Toll Road, which includes 70 bridges by integrating an economic feasibility evaluation (BMS) method with machine learning using the Random Forest algorithm. The bridge condition was conducted in accordance with the 2022 Bridge Inspection Guidelines, while the economic evaluation was based on the 1993 IBMS guidelines, using Net Present Value per square meter (NPV/m²) and Internal Rate of Return (IRR) indicators. The results of the economic evaluation in the form of bridge maintenance priority rankings, were used as the primary target variables for the machine learning model, enabling Random Forest to predict the order of economic priority for maintenance directly. Input variables include 13 bridge element Condition Scores ​​summarized through the Weighted Condition Score (WCS), as well as five economic variables such as remaining service life, floor area, AADT, diversion distance, and maintenance costs. The Random Forest model produces an R² on the test data of 0.8744. Comparison of ranking results between the BMS and Random Forest methods shows good consistency in high-priority bridges and the Random Forest model is able to identify bridges with critical structural conditions that are less accommodated by the conventional BMS method, resulting in more holistic treatment recommendations.
Prioritizing Provincial Road Maintenance in Bali Using a Combination of PKRMS and AHP Ni Made Werdi Intra Sari; Putu Alit Suthanaya; Dewa Made Priyantha Wedagama
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23675

Abstract

Budget constraints in Bali Province prevent the accommodation of all road maintenance needs in the annual program. While the Provincial/Kabupaten Road Management System (PKRMS) is commonly used, it lacks systematic integration of non-technical criteria. Conversely, the Analytical Hierarchy Process (AHP) relies heavily on expert judgment. The novelty of this study lies in the development of an integrated prioritization model that combines technical indicators from the PKRMS application with non-technical strategic criteria derived from the AHP method within a unified decision-making framework. This study aims to develop a hierarchical structure, determine the weight of each criterion, formulate a mathematical model for road maintenance prioritization, establish a priority scale, and compare the priority results obtained from the AHP method, the PKRMS application, the combination of PKRMS and AHP, and the realization of the 2025 road maintenance program. The study was conducted on 101 provincial road sections in Bali Province involving 24 expert respondents. The analysis integrated technical and non-technical criteria obtained from AHP with the Triggered Priority Index (TPI) values generated by PKRMS. The results showed that non-technical criteria had a more dominant influence, accounting for 71%, compared to technical criteria at 29%. The mathematical model obtained was Y = 22A1 + 7A2 + 23B1 + 10B2 + 21B3 + 17B4. Comparison with the 2025 road maintenance program showed that the combination of PKRMS and AHP achieved the highest conformity level at 75.00%. Therefore, this model is considered more objective and representative in supporting road maintenance priority determination.
Development of a Predictive Model for Road Maintenance Management Based on Correlation of IRI, PCI and Traffic Data Hary Styaji; Mohamad Sobirin; Pio Ranap Tua Naibaho
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23736

Abstract

National road infrastructure is a strategic asset requiring effective, data-driven maintenance management systems. This study develops a predictive model for road maintenance management through correlation analysis of International Roughness Index (IRI), Pavement Condition Index (PCI), and traffic parameters on the 155 km Makassar-Parepare corridor. A quantitative descriptive-explanatory approach was applied to 26,818 observation segments spanning 2020-2024 from the BBPJN South Sulawesi Pavement Management System. Multiple regression models were developed with 70:30 validation split, and Earned Value Management (EVM) was implemented on 50 maintenance projects totaling IDR 65.08 billion. Results show a significant negative IRI-PCI correlation (r = -0.2710, p < 0.001) and weak positive IRI-AADT correlation (r = +0.1898, p < 0.001). The regression model yielded R² = 0.1110 for IRI prediction (RMSE = 1.03 m/km) and R² = 0.1053 for PCI (RMSE = 12.55), with pavement age (AGE) as the strongest predictor. Validation shows the Moderate Scenario 2024 prediction (IRI 5.71 m/km) nearly identical to actual data (5.70 m/km). EVM analysis produced mean CPI of 0.9758 and mean SPI of 0.9435. Integration of predictive models, EVM, and IRMS unit costs yields a data-driven maintenance strategy with 15-20% potential budget savings through timely preventive maintenance.
Design Change Factors in Hospital Design-Build Projects: Variable Validation and RII Analysis Yofan Saman Agusta; Mardiaman Mardiaman
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23800

Abstract

Hospital construction projects in island regions face compounded challenges that differ fundamentally from urban settings. This study investigates design change factors in hospital construction under the Design and Build (D&B) contract scheme, with empirical reference to the Tafaeri Hospital project in Nias and the Tarempa Hospital project in Anambas. A two-phase research design was employed. Phase one involved a preliminary survey using expert judgment, where five construction professionals evaluated 20 candidate variables derived from a systematic literature review, using a five-point Likert scale. Seventeen variables met the relevance threshold (mean ≥ 3.0) and were retained. Phase two involved a main survey distributed to 157 practitioners to measure the relative significance of each validated variable. Data were analysed through Pearson validity testing, Cronbach Alpha reliability assessment, and Relative Importance Index (RII) scoring. All 17 variables demonstrated valid correlation coefficients (r > 0.156, p = 0.000) and the instrument achieved high reliability (Cronbach Alpha = 0.897). The three highest-ranked variables were site condition changes (RII = 0.775), natural disaster impacts (RII = 0.767), and MEP system and medical equipment integration issues (RII = 0.708). These findings confirm that geographic vulnerability and technical complexity are the dominant design change drivers in island-based hospital D&B projects, and provide a validated empirical foundation for risk mitigation strategies in similar settings.
Strategy for Improving Environmental Quality in Parung Kored Urban Village, Tangerang City, Banten Province Ahmad Satori; Sodikin Sodikin; Edi Rusdiyanto
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23832

Abstract

Rapid urbanization in Tangerang City has accelerated environmental degradation in urban kampung areas, including Kampung Parung Kored, through increasing settlement density, inadequate sanitation systems, poor drainage conditions, unmanaged household waste, and declining green open spaces. This study aims to formulate an appropriate strategy for improving environmental quality in Kampung Parung Kored to support sustainable urban settlement development. The research employed a qualitative descriptive approach combined with SWOT analysis. Data were collected through field observations, interviews, questionnaires, and documentation studies conducted from January to March 2026. Respondents consisted of 40 residents, 5 community leaders, and 3 government representatives selected through purposive sampling. Data validity was ensured through triangulation, while SWOT weighting and rating were determined using expert judgment. The findings indicate that Kampung Parung Kored experiences significant environmental problems related to sanitation, drainage, waste management, and declining green open spaces. The Environmental Quality Index (IKLH) of Tangerang City declined from 60.32 in 2019 to 46.92 in 2023, reflecting increasing urban environmental pressure. However, the settlement still possesses strong social cohesion, active local institutions, and a culture of mutual cooperation functioning as important social capital. SWOT analysis positions Kampung Parung Kored in Quadrant I (SO Strategy), indicating strong internal capacity and significant external opportunities. Priority strategies include strengthening community-based environmental management, improving sustainable infrastructure, expanding participatory greening programs, strengthening local institutions, and implementing collaborative governance through a penta-helix approach to support healthier, more inclusive, resilient, and sustainable urban environmental management.
Evaluation of Hexavalent Chromium (Cr6+) Content in Nickel Mining Sediment Ponds of Morowali Using Atomic Absorption Spectrophotometry (AAS) Alwin Alwin; Eris Nur Dirman; Erniati Erniati; Muh. Chaerul; Natsar Desi; Mahmud Mahmud
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23849

Abstract

Nickel mining activities in Morowali have the potential to release hexavalent chromium (Cr6+) into aquatic environments through runoff from mining areas into sediment ponds. Cr6+ is toxic, carcinogenic, and highly soluble in water, posing a serious threat to aquatic ecosystems and public health. This study aims to analyze Cr6+ concentrations in sediment pond water, evaluate compliance with the quality standard of Ministry of Environment and Forestry Regulation No. 5 of 2022, and formulate adaptive evidence-based management strategies. A quantitative descriptive approach was used, with water sampling conducted at three sediment pond locations in the Morowali nickel mining area, Central Sulawesi. Cr6+ concentrations were analyzed using Atomic Absorption Spectrophotometry (AAS) with the APDC-MIBK solvent extraction technique. Supporting parameters including pH, TSS, and Total Chromium were analyzed following applicable SNI standards. Results showed Cr6+ concentrations of 0.054 mg/L (54.0% of quality standard) at SedPond 1, 0.038 mg/L (38.0%) at SedPond 2, and 0.071 mg/L (71.0%) at SedPond 3, all below the 0.1 mg/L threshold of PermenLHK No. 5/2022. However, SedPond 3 warrants attention given its safety margin of only 29%. The Cr6+/Total Cr ratio varied: 54.0% (SP-1), 15.2% (SP-2), and 18.7% (SP-3), indicating differences in geochemical conditions and the intensity of Cr3+ → Cr6+ oxidation among sampling locations. A management strategy based on regular monitoring and control of runoff sources is recommended as a priority mitigation measure.
Welding Quality Control Analysis on Steel Structure of Pedestrian Bridge (JPO) at PMJ Land Tower Building from a Project Management Perspective Muhammad Firdaus; Mardiaman Mardiaman
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23873

Abstract

Welding of steel structure components in pedestrian bridge (JPO) elements of high-rise buildings is a critical operation that determines structural integrity and user safety. Weld joint failures may reduce load-bearing capacity by 25–40%, making a comprehensive quality control system essential. Empirical studies specifically examining welding quality control for high-rise building JPO structures based on AWS D1.1:2025 and project management perspectives remain scarce in Indonesia; no published study has yet integrated technical, managerial, and human resource factors in a single quantitative model. This study aims to: (1) identify the actual implementation of welding quality control based on AWS D1.1:2025; (2) analyze factors affecting welding output quality; (3) identify dominant variables; and (4) formulate improvement recommendations. A descriptive-associative quantitative method was applied with 35 respondents — welders, Quality Control Inspectors, Welding Inspectors, Site Engineers, Field Supervisors, and Supervision Consultants — at the PMJ Land Tower Building project, East Jakarta (2024–2025). Data were collected via a 5-point Likert scale questionnaire covering 23 independent variables (X1–X23) across four dimensions: technical aspects, human resources, management & supervision, and work environment. Analysis used SPSS 26, including validity testing (Pearson, r-table = 0.334), reliability (Cronbach’s α = 0.892), normality (Kolmogorov–Smirnov), descriptive statistics, rank score analysis, and Pearson correlation. Variable mean scores ranged from 3.89 to 4.26 (Good to Very Good). The three dominant variables were Technical Training (X12, mean = 4.26), Welder Certification (X3, mean = 4.17), and WPS & PQR (X2, mean = 4.14). Work Environment (X5) and VT Effectiveness (X16) scored lowest (mean = 3.89). Correlation testing yielded r = 0.086 (p = 0.622 > 0.05), interpreted through a compliance gap — a discrepancy between positive respondent perceptions and actual field implementation. The study recommends enhancing RKS specifications, improving NDT consistency through an Inspection and Test Plan (ITP), strengthening welder qualification systems, and implementing digital documentation for improved traceability.
Passenger Terminal Performance as Maritime Transportation Infrastructure in Supporting Port Area Development Dedy Rusmiyanto; Yayan Sugiyantoro
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23904

Abstract

Passenger terminals are not only service facilities for maritime travelers but also transport nodes that shape accessibility, mobility, and the functional relationship between ports and their surrounding areas. This study evaluates passenger-terminal facility performance and translates service-improvement priorities into implications for port-area development. A mixed survey and field-evaluation design was applied at Tanjung Perak Surabaya, Tanjung Emas Semarang, Benoa Bali, and Lembar Lombok. Four hundred passengers (100 at each port) assessed 41 service attributes grouped into safety, security and order, reliability and regularity, comfort, convenience and accessibility, and equality. Customer Satisfaction Index (CSI), Importance-Performance Analysis (IPA), and Quality Function Deployment (QFD) were integrated to identify overall satisfaction and priority interventions. The overall mean CSI across the four terminals was 84.8%, indicating very high satisfaction, with port-level averages of 85.8% at Tanjung Perak, 81.8% at Tanjung Emas, 84.7% at Benoa, and 86.8% at Lembar. Despite these high scores, IPA and QFD revealed localized deficiencies in emergency and health facilities, security, flood handling, waiting-room comfort, toilets, thermal control, boarding and debarkation access, schedule information, public transport connections, terminal layout, and inclusive facilities. The novelty of this article is the translation of user-based terminal performance priorities into an urban-planning interpretation for the port-city interface. Port-area development is therefore treated as a planning implication rather than a directly measured dependent variable. The results suggest that terminal investment should combine internal service quality with multimodal access, inclusive public space, climate resilience, and adaptive information systems.
Development Analysis Rural Drinking Water Supply System Network in Tulamben Village, Karangasem District I Gusti Ngurah Kerta Arsana; I Putu Gustave Suryantara Pariartha; Sagung Putri Chandra Astiti; I Wayan Suryantara
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23949

Abstract

PAMDES Tirta Gunung Agung utilizes a well with a discharge of 2.53 liters/second as a source of raw water which has served 323 SR (house connections). This research is to analyze efforts to develop SPAMDes to increase services for 130 SRs that do not have water service. A simulation was carried out using Epanet 2.2 software by using Telagawaja SPAM raw water of 1.0 liters/second to increase the shortage of discharge from existing water sources. Simulations that meet the technical criteria are analyzed financially using the parameters Net Present Value (NPV), Internal Rate of Return (IRR) and Benefit Cost Ratio (BCR). Of the 3 (three) development alternatives, only 2 (two) alternatives meet the technical aspects, including: Alternative 2, namely taking raw water discharge from the RD (Distribution Reservoir) Kubu SPAM Telagawaja to Reservoir 1 by gravity via a 2,448 m long pipe with a construction cost of IDR 817. 154,000 have (NPV = Rp. 68,196,373) > 0, (IRR = 6.956%) > MMRA (6%), (BCR = 1.04) > 1, and Alternative 3 is taking raw water discharge from RD Kubu SPAM Telagawaja to the Reservoir 2 through a 1770 m long pipe assisted by a booster pump with construction costs of IDR 693,338,000 having (NPV = IDR 228,880,999) > 0, (IRR = 9.594%) > MMRA (6%) and (BCR = 1.16) > 1. Utilization of raw water from existing wells and additional water discharge from Telagawaja SPAM of 1.0 liters/second can meet water needs in the PAMDES development plan area, as well as planning alternatives 2 and 3 are technically and financially feasible.
Project Stakeholders’ Perceptions of Green Building Implementation in Public Market Buildings Muhammad Fauzi Novrizaldy; Ashar Saputra; Johan Syafri Mahathir Ahmad
ASTONJADRO Vol. 15 No. 4 (2026): ASTONJADRO
Publisher : Universitas Ibn Khaldun Bogor

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.32832/astonjadro.v15i4.23987

Abstract

Green building implementation in public facilities is essential to support sustainable development, particularly in public market buildings that require adequate environmental quality, accessibility, sanitation, and user comfort. However, the success of green building implementation is not only determined by technical design and regulatory compliance, but also by project stakeholders’ awareness, supporting drivers, and perceived barriers. This study aims to analyze project stakeholders’ perceptions of awareness, drivers, and barriers in green building implementation using the Pasar Godean public market project in Sleman Regency, Indonesia, as a case study. A quantitative descriptive approach was applied through a structured questionnaire distributed to stakeholders involved in planning, construction, supervision, and building management. A total of 24 valid responses were obtained from five stakeholder groups and analyzed using descriptive statistics and non-parametric inferential tests with IBM SPSS Statistics version 26. The novelty of this study lies in its specific focus on stakeholder perceptions in a public market green building project under the Indonesian Bangunan Gedung Hijau (BGH) regulatory context. The results show that stakeholders had relatively good awareness, particularly regarding technical aspects of public market buildings, although formal training and certification remained limited. Financial, non-financial, and recognition-based incentives were perceived as complementary drivers. The main barriers were related to awareness and social aspects, human resources and technology, and financial-economic constraints. Therefore, green building implementation in public market projects requires not only regulatory and technical compliance, but also stronger stakeholder readiness, technical training, expert assistance, promotion, and integrated incentive schemes.