cover
Contact Name
Mohammad Rizki Fadhil Pratama
Contact Email
mohammadrizkifadhilpratama@gmail.com
Phone
-
Journal Mail Official
vnovrianti@gmail.com
Editorial Address
-
Location
Kota palangkaraya,
Kalimantan tengah
INDONESIA
Media Ilmiah Teknik Sipil
ISSN : 02161346     EISSN : 24073857     DOI : -
Core Subject : Engineering,
The publication of Media Ilmiah Teknik Sipil certainly participates in disseminating the results of research and review of science and technology development conducted by lecturers and researchers especially from UM Palangkaraya and other universities. This edition contains 8 articles consisting of civil engineering topics.
Arjuna Subject : -
Articles 217 Documents
Perhitungan Produktivitas Tenaga Kerja Pasangan Dinding Bata Pada Proyek Perumahan di Kota Banjarmasin: Calculation Of Labor Productivity Of Brick Wall Makers in Housing Projects in Banjarmasin City Tezar Aulia Rachman; Hendra Cahyadi; Akhmad Gazali; Eriko Mahendra; Suriansyah
Media Ilmiah Teknik Sipil Vol. 14 No. 3 (2026): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Labor productivity is a crucial factor influencing the success of construction projects regarding cost, schedule, and work quality. This study aims to analyze labor productivity for red brick masonry and wall plastering tasks in a Banjarmasin housing project, compare productivity levels between morning and afternoon shifts, and evaluate the results against the 2026 Unit Price Analysis (AHSP) standards. A time study method—involving direct observation of labor activities—was employed to determine standard times and productivity rates. Primary data were collected through field surveys conducted between May and June 2026. The results indicate that brick masonry productivity was 0.899 m²/man-hour in the morning and 0.811 m²/man-hour in the afternoon, representing a 9.789% decrease. For brick wall plastering, productivity was 0.854 m²/man-hour in the morning and 0.816 m²/man-hour in the afternoon, a decrease of 4.450%. Given the AHSP 2026 standard of 0.768 m²/man-hour, field productivity for brick masonry was 5.597%–17.041% higher, while plastering productivity was 6.192%–11.242% higher than the standard. The findings demonstrate that the time of day influences labor productivity, with morning productivity levels exceeding those observed in the afternoon.
Analisis Efisiensi Struktural Gedung Poltekkes Mataram Melalui Penerapan Balok Tirus: Structural Efficiency Analysis Of The Poltekkes Mataram Building Through The Application Of Tapered Beams Hairul Fahmi; Hariyadi; Adryan Fitrayudha
Media Ilmiah Teknik Sipil Vol. 14 No. 3 (2026): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Multi-story buildings in seismic-prone regions require material efficiency without compromising safety. Prismatic beams are often inefficient as they do not follow bending moment distributions. This study evaluates the effect of tapered beams on the material efficiency and structural performance of the Poltekkes Mataram Building, which uses a dual system (SMRF and shear walls). Quantitative analysis was conducted using ETABS v22 comparing Model A (prismatic) and Model B (tapered) based on SNI 1726:2019, SNI 1727:2020, and SNI 2847:2019. Evaluated parameters included concrete volume, weight, base shear, drift, and natural period. Results show that tapered beams reduced beam concrete volume by 111.11 m³ (13.61%) and total weight by 2,666.64 kN (4.06%), lowering base shear by 3.09% in both directions. Interstory drift remained below the 42 mm limit, and the natural period was unchanged. Therefore, tapered beams effectively improve material efficiency and reduce seismic forces without compromising global structural performance, making them a viable alternative for reinforced concrete design in seismic-prone areas.
Evaluasi Kesesuaian Tata Letak Bangunan dengan Batas Ruang Milik Jalan di Kelurahan Pasir Panjang Kota Kupang: Evaluation Of Building Layout Compliance With Road Right Of Way Boundaries in Pasir Panjang Sub District, Kupang City Ambrosius Raha Lelang Wayan; Yacob Victor Hayer; Maria Anggreni Dos Santos
Media Ilmiah Teknik Sipil Vol. 14 No. 3 (2026): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to evaluate the conformity of building layouts with the Road Right-of-Way (Rumija) boundaries in Pasir Panjang Subdistrict, Kupang City. The evaluation was carried out using two observation methods, namely aerial mapping with a drone (Unmanned Aerial Vehicle/UAV) and terrestrial surveying using a Total Station. The UAV method was used to obtain high-resolution aerial imagery, which was then analyzed photogrammetrically, while the Total Station was used to acquire detailed coordinate data in the field. The results show that out of 88 buildings observed using the drone, 73 buildings (82.95%) do not comply with the Rumija boundary regulations. Meanwhile, measurements using the Total Station indicate that out of 97 buildings observed, 79 buildings (81.44%) violate the Rumija boundary. The comparison of the two methods demonstrates a relatively high level of consistency, indicating that UAV technology can serve as an efficient alternative for evaluating building layout compliance with road right-of-way boundaries. This study is expected to provide a basis for local government in planning and supervising urban spatial management more effectively.
Analisis Kesiapan Kontraktor Dalam Mengimplementasikan Green Building Pada Bangunan Gedung di Jakarta: Analysis Of Contractor Readiness in Implementing Green Building for High-Rise Buildings in Jakarta Dimas Andriyanto; Pio Ranap Tua Naibaho; Bambang Priambodo
Media Ilmiah Teknik Sipil Vol. 14 No. 3 (2026): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Responding to the critical issues of global warming and the continuous increase in energy demand, this empirical study systematically analyzes the current readiness of construction contractors operating in Jakarta regarding the implementation of the LEED (Leadership in Energy and Environmental Design) green building standard. Utilizing a comprehensive quantitative approach through the distribution of structured questionnaires to 50 active executing contractors, the analysis is specifically focused on evaluating four main dimensional aspects: core knowledge, organizational readiness, human resource (HR) capability readiness, and technical-operational readiness. The empirical results of this study indicate that the contractors' overall level of knowledge regarding the basic concepts and benefits of LEED falls into the moderate category (with a calculated average score of 2.92), highlighting that technical and administrative understanding still requires substantial improvement. Organizational readiness is classified as fairly good (achieving an average score of 3.16), yet it faces significant constraints regarding budget availability and the lack of a comprehensive database for eco-friendly material suppliers. Human resources show high readiness (attainting a higher average score of 3.39), which is strongly driven by a positive willingness to learn and strong procedural awareness, although specific problem-identification skills still need to be honed. Meanwhile, technical-operational readiness is positioned in the fairly good category (with an average score of 3.19), where the main issue revolves around the availability of specialized work equipment that meets strict LEED standards. In conclusion, these findings clearly indicate an urgent need for enhanced technical understanding, reinforcement of internal corporate policies and financial budgets, as well as systematic infrastructure optimization by contractors to support the effective, long-term adoption of LEED green buildings across Jakarta.
Analisis Penerapan Prototipe Pelaksanaan Konstruksi Bangunan Gedung Studi Kasus Proyek Pembangunan Gedung Madrasah: Analysis Of The Implementation Of The Prototype for Building Construction Execution Case Study Of A Madrasah Building Construction Project Samsul Arifin; Pio Ranap Tua Naibaho
Media Ilmiah Teknik Sipil Vol. 14 No. 3 (2026): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The development of Madrasah Learning Classrooms (RKB) through the State Sharia Securities (SBSN)-funded program represents a strategic initiative to enhance the quality of Islamic education in Indonesia. However, the implementation of RKB construction projects continues to face challenges, including schedule delays, cost overruns, and inconsistencies in construction quality. This study investigates the effect of prototype implementation on time efficiency, cost efficiency, and construction quality in RKB building projects. A quantitative research design was employed, using questionnaire data collected from 137 respondents directly involved in the planning and implementation of RKB construction. The respondents included Heads of Work Units, Commitment-Making Officials, Heads of Provincial Infrastructure and Facilities Teams, and relevant personnel responsible for madrasah infrastructure and facilities. The data were analyzed using Structural Equation Modeling–Partial Least Squares (SEM-PLS). The findings reveal that prototype implementation has a positive and statistically significant effect on time efficiency (coefficient = 0,770; p = 0,000), cost efficiency (coefficient = 0,637; p = 0,000), and construction quality improvement (coefficient = 0,762; p = 0,000). These findings suggest that the use of standardized prototypes can improve design clarity, reduce revisions and material waste, strengthen coordination, and promote consistency in construction quality. Therefore, prototype implementation offers an effective approach to improving the performance of RKB construction projects through greater efficiency, standardization, and quality assurance.
Analisis Pemakaian Bahan Kimia Pada Instalasi Pengolahan Air Minum PT. Moya Bekasi Jaya Khususnya Biaya Bahan Kimia Koagulan (Studi Kasus IPA PT. MBJ, Kec. Cikarang Selatan, Kab. Bekasi): Analysis Of Chemical Consumption at The PT. Moya Bekasi Jaya Drinking Water Treatment Plant: A Focus On Coagulant Costs (Case Study Of PT. MBJ WTP, South Cikarang District, Bekasi Regency) Rahadian Sutisnawidjaya; Simon Sembiring
Media Ilmiah Teknik Sipil Vol. 14 No. 3 (2026): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Clean water is a basic necessity that plays a vital role in maintaining public health and supporting various life activities. To meet the demand for clean water in the Cikarang region and its surroundings, Perumda Tirta Bhagasasi collaborates with the private sector through the Water Treatment Plant (WTP) of PT Moya Bekasi Jaya (MBJ), which utilizes raw water from the Tarum Barat Canal. This study aims to evaluate the effectiveness of using Aluminum Sulfate (Alum) and Poly Aluminum Chloride (PAC) coagulants based on raw water quality, treatment results, and operational cost efficiency. The research methods include collecting primary and secondary data for the period of January–December 2025, analyzing laboratory test results (jar tests), evaluating the optimum coagulant dosage based on turbidity and pH parameters, and analyzing operational cost efficiency. The relationship between raw water turbidity and coagulant dosage was analyzed using linear regression. The results showed a strong correlation between raw water turbidity and the required coagulant dosage, with a coefficient of determination (R^2) of 0.9218 for Alum and 0.9507 for PAC. The jar test results indicated that PAC performed better than Alum when raw water turbidity exceeded 228.49 NTU. The efficiency of PAC usage became more evident at raw water turbidity levels above 300 NTU, with PAC being 4.7% more cost-effective, saving IDR 5.88/m³. Based on the research findings, PAC 8% is recommended as a more effective and efficient coagulant for high raw water turbidity conditions, while Alum 8% remains feasible for low to moderate turbidity levels to optimize water treatment operational costs.
Model Keputusan Terpadu Berbasis Risiko dan Akuntabilitas Data untuk Kebijakan Preservasi Jalan Nasional: Integrasi Prediksi IRI-PCI, Earned Value Management, dan Unit Cost IRMS Pada Koridor Makassar-Parepare: An Integrated Decision Model Based On Risk and Data Accountability for National Road Preservation Policy: Integration Of IRI-PCI Prediction, Earned Value Management, and IRMS Unit Cost On The Makassar-Parepare Corridor Hary Styaji; Mohamad Sobirin
Media Ilmiah Teknik Sipil Vol. 14 No. 3 (2026): Media Ilmiah Teknik Sipil
Publisher : ​Institute for Researches and Community Services Universitas Muhammadiyah Palangkaraya

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Indonesia's national road management remains heavily reactive: segments are typically left to deteriorate until damage becomes visually evident before entering the maintenance program. This study proposes an integrated decision model linking road condition prediction, risk mapping, project performance, and data governance for the 155-km Makassar–Parepare national road corridor. Unlike prior analyses of the same dataset, which focused solely on correlation testing and regression, this study treats those statistical results as inputs to a comprehensive decision framework encompassing a technical-traffic-climate-budget-execution risk map, the relationship between road condition indicators and Ministerial Regulation No. 4/2023 on road functional eligibility, a strategy for strengthening the Pavement Management System (PMS) database, budget accountability mechanisms, and a five-stage implementation roadmap for BBPJN Sulawesi. The analysis draws on 26,818 observation segments (2020–2024), revealing a Pearson correlation of r = –0.2710 (p < 0.001) between IRI and PCI, and r = +0.1898 (p < 0.001) between IRI and AADT, alongside multiple regression models yielding R² = 0.1110 (IRI) and R² = 0.1053 (PCI). An Earned Value Management (EVM) evaluation of 50 projects worth IDR 65.08 billion shows an average CPI of 0.9758 and SPI of 0.9435. Findings indicate that execution risk, not physical deterioration risk alone, determines whether sound technical priorities translate into improved road conditions. The proposed integrated decision model comprises five stages—data integration, priority dashboarding, annual model calibration, IRMS-based budgeting, and EVM control—with an estimated 15–20% budget efficiency potential through preventive maintenance on segments with IRI 6–8 m/km, ahead of costlier reconstruction demand priced at IDR 1,923,900/m².