cover
Contact Name
Suhanto
Contact Email
suhanto@poltekbangsby.ac.id
Phone
-
Journal Mail Official
mail@poltekbangsby.ac.id
Editorial Address
-
Location
Kota surabaya,
Jawa timur
INDONESIA
Jurnal Penelitian
ISSN : 19786832     EISSN : 26225948     DOI : -
Arjuna Subject : -
Articles 1 Documents
Search results for , issue "36-44" : 1 Documents clear
PERENCANAAN REKONSTRUKSI SALURAN INDUK DENGAN MENGGUNAKAN BETON PRECAST DI BANDAR UDARA INTERNASIONAL LOMBOK fitradi pahala; supriadi supriadi
Jurnal Penelitian 36-44
Publisher : Politeknik Penerbangan Surabaya

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.46491/jp.v4i4.474

Abstract

Lombok International Airport is the premier second-class airport located in Tanak Awu, Pujut, Lombok Tengah, Nusa Tenggara Barat which functions to serve transportation services. Lombok International Airport has runway, apron, and two taxiways along with its drainage. The drainage system is needed to prevent puddles of rainwater in the runway, taxiway and apron that can obstruct the aircraft movement. However, looking at the existing condition of the Lombok International Airport’s trunk, it is necessary to conduct research about trunk reconstruction for the next ten years’ time.The research is begun by collecting data such as existing elevation, existing dimension, slope of existing trunk and rainfall data for the last five years. From these data, an analysis of the rainfall plan is carried out using gumbel distribution method. Furthermore, from the results of the analysis, it is obtained the daily maximum rainfall which is used to know the rainwater runoff debit. Re-planning the dimensions of Lombok International Airport’s trunk is carried out to accommodate rainwater runoff debit for the next ten years since the existing dimensions of the existing trunk cannot accommodate rainwater runoff debit for the next ten years. Therefore, it was obtained the design plan for the reconstruction of each segment with a length of 1,2 meters, width of 1,84 meters and height of 1,77 meters. Re-planning the dimensions of the trunk is in precast concrete.

Page 1 of 1 | Total Record : 1


Filter by Year

0000


Filter By Issues
All Issue Vol. 10 No. 2 (2025): Jurnal Penelitian Juni 2025 Vol. 10 No. 1 (2025): Jurnal Penelitian Maret 2025 Vol. 9 No. 4 (2024): Jurnal Penelitian Desember 2024 Vol. 9 No. 3 (2024): Jurnal Penelitian September 2024 Vol. 9 No. 2 (2024): Jurnal Penelitian Juni 2024 Vol. 9 No. 1 (2024): Jurnal Penelitian Maret 2024 Vol. 8 No. 2 (2023): Jurnal Penelitian Juni 2023 Vol 2 No 2 (2017): Jurnal Penelitian Juni 2017 Vol 1 (2016): Jurnal Penelitian Maret 2016 343-352 332-342 323-331 316-323 312-322 311-320 306-315 305-310 297-311 297-305 295-301 292-304 289-296 289-294 283-296 282-288 278-291 278-288 276-281 273-282 270-277 268-275 264-272 261-267 260-269 257-263 256-269 254-260 250-259 249-253 247-255 246-256 242-248 240-249 237-246 236-241 235-245 232-239 230-235 227-236 224-234 223-229 222 -231 216-223 215-226 214 - 221 212-222 204 - 214 203 - 213 203-211 199-215 197-202 194-203 192 - 202 191-198 188-196 187-193 181 - 191 180-190 180-186 178-187 173-179 171 - 180 171-179 170-177 164 - 170 163-169 159-172 159-170 155 - 163 155-162 151 -158 147-158 142 - 150 138-147 135-146 133 - 141 129-137 125-134 123 - 132 121-128 114 - 122 113-124 110-120 102-112 101 - 113 100-109 90-101 90 - 100 93-99 86-96 84-92 79 - 89 77 - 89 75-85 75-83 71-80 71-77 70-77 69-77 68-77 67-77 66-77 66-74 65 - 76 64-77 64-69 62-70 61-69 60-69 59-70 59-67 58-68 58-66 58-65 57-65 56-65 56-64 56-63 55-63 52-61 52-60 50-59 50-58 49-57 49-56 49-55 48-57 47-57 45 - 54 45-54 45-51 44-48 43-51 42-55 42-49 42-48 41-49 40-48 40-44 38-47 38-46 38-41 37-48 37-44 36-44 36-43 35-41 32-37 31-40 30-41 29-42 29-39 29-37 29-35 28-41 28-34 27-37 27-35 27-31 25-39 25-36 24-36 23-29 21-30 21-28 21-26 20-28 20-27 19-28 18-26 16-27 16-24 15-24 14-28 14-20 13-20 12 - 23 12-22 11-20 11-19 11-14 10-17 9-17 8-13 7-12 1-19 1-15 1-13 1-11 1-10 1-9 1-8 1-7 1-6 More Issue