cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota kupang,
Nusa tenggara timur
INDONESIA
Jurnal Teknik Sipil
ISSN : 20894953     EISSN : 2775815X     DOI : -
Core Subject :
Arjuna Subject : -
Articles 185 Documents
TINJAUAN KUAT LENTUR BALOK KOMPOSIT KAYU Alves, Paulito M. D.; Sina, Dantje A. T.; Cornelis, Remigildus
Jurnal Teknik Sipil Vol 2, No 2 (2013): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (355.731 KB)

Abstract

This research was use wood beam, reinforced concrete plate and nail as shear connector. Nail that used is artless nail and thread nail that public reside in marketing. the purpose of this research is to know bending strength of a composite beam of wood-concrete with shear connector artless nail and shear connector thread nail. The research was conducted at the Laboratory of Concrete Civil Engineering Department University of Nusa Cendana Kupang - NTT and Laboratory of Mechanical Engineering State Polytechnic of Kupang - NTT. From the results of research and analysis of the data obtained the maximum tension of composite beam with shear connector artless nail : maximum load as big as 40000 N; bending moments as big as 5.01 x106 Nmm; tension depresses as big as 29,327 N/mm2; contact surface-tension as big as 3,545 N/mm2; bending stress as big as 16,381 N/mm2; the shear stress as big as 6,325 N/mm2. Whereas the average test results of composite beams with shear connector thread nail is obtained by maximum load as big as 51667 N; bending moment as big as 6.47 x 106 Nmm ; tension depresses as big as 38,400 N/mm2; contact surface-tension as big as 4,624 N/mm2; bending stress as big as 21,205 N/mm2; the shear stress as big as 8,036 N/mm2.
STUDI EKSPERIMENTAL KUAT TEKAN DAN SERAPAN AIR BATA RINGAN CELLULAR LIGHTWEIGHT CONCRETE DENGAN TANAH PUTIH SEBAGAI AGREGAT Hunggurami, Elia; Bunganaen, Wilhelmus; Muskanan, Richardo Yeskial
Jurnal Teknik Sipil Vol 3, No 2 (2014): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (116.862 KB)

Abstract

Penelitian ini dilakukan untuk mengetahui pengaruh substitusi tanah putih terhadap pasir pada nilai kuat tekan dan serapan air bata ringan cellular lightweight concrete (CLC). Metode yang digunakan dalam penelitian ini yakni dengan membuat bata ringan CLC dengan substitusi tanah putih sebesar 0%, 50%, dan 100% dari berat pasir. Bata ringan yang telah di curing selama 7, 14 dan 28 hari kemudian diuji untuk mendapatkan nilai kuat tekan dan serapan air dari dari bata ringan. Hasil penelitian menunjukan nilai kuat tekan bata ringan CLC normal pada umur 7 hari adalah sebesar 0,861 MPa. Kuat tekan bata ringan lebih besar 29,04% yaitu 1,111 MPa pada substitusi 50 % tanah putih,dan lebih besar 77,47 % yaitu 1,528 MPa pada substitusi 100% tanah putih. Pada umur 14 hari, nilai kuat tekan bata ringan normal 0,889 MPa. Nilai kuat tekan lebih besar 49,94% yaitu 1,333 MPa, dan lebih besar 87,51% yaitu 1,667 MPa pada substitusi 50% dan 100% tanah putih. Pada umur 28 hari nilai kuat tekan bata ringan CLC normal sama dengan bata ringan CLC dengan substitusi 100% tanah putih yaitu 1,472 MPa. Nilai kuat tekan lebih kecil 7,54% menjadi 1,361 MPa pada substitusi 50% tanah putih. Nilai serapan air bata ringan CLC berturut – turut sebesar 17,678% untuk bata ringan CLC normal, 16,645% untuk bata ringan dengan substitusi 50% tanah putih, dan 20,267% pada substitusi 100% tanah putih. Nilai serapan air ini bata ringan CLC ini masih dibawah nilai serapan air bata beton pejal tipe 1 yaitu sebesar 25%.
STUDI KELAYAKAN FINANSIAL INVESTASI PERUMAHAN UME MALINAN PERMAI KABUPATEN KUPANG Messah, Yunita A.; Pah, Jusuf J. S.; Putri, Ria A.
Jurnal Teknik Sipil Vol 4, No 2 (2015)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (235.591 KB)

Abstract

Untuk memenuhi kebutuhan perumahandosen dan pegawai, pihak Undana bekerja sama dengan PT. Spison Brajo selaku developer membangun sebuah kawasan perumahan yang diberi nama Perumahan Ume Malinan Permai. Mengingat dana yang dibutuhkan cukup besar, perlu dilakukan penyusunan studi kelayakan untuk menghindari resiko kerugian di masa yang akan datang.Tugas akhir ini bertujuan untuk mengetahui kelayakan proyek perumahan Ume Malinan Permai terhadap aspek finansial. Untuk mengetahui ketersediaan jumlah tempat tinggal digunakan perhitungan peluang pasar dan untuk mengetahui kelayakan dari segi finansial digunakan perhitungan analisa uji kelayakan dengan parameter investasi yaitu NPV, IRR dan PP.Setelah diadakan analisis, diperoleh kesimpulan bahwa peluang pasar pembangunan perumahan Ume Malinan Permai sangat menjanjikan karena besarnya peluang pasar (market potencial) di Kupang yaitu 58489 unit pada tahun 2018.Dari aspek ekonomi dengan biaya investasi sebesar Rp. 9,536,722,200.00 dan perhitungan uji kelayakan investasi dalam jangka waktu 5 tahun menggunakan 4 asumsi penjualan berbeda disimpulkan bahwa asumsi keempat lebih besar dari 3 asumsi lainnya dengan nilai NPV sebesar Rp. 5,548,503,421,IRRsebesar 25.2112% dan PP selama 3 tahun. Perumahan Ume Malinan Permai yang dilakukan oleh PT. Spison Brajo dikatakan layak (feasible) direalisasikan dari aspek finansial. To fulfill the need of lecturer and staff’shousing, Undana in cooperation with PT. Spison Brajo as the developer built a residential district named Ume Malinan Permai Housing. Because of the huge funds required, feasibility studies need to be done to avoid the risk of losses in the future.This final assesment aims to determine the feasibility of Ume Malinan Permai housing project on the financial aspects. To know the availability of the number of dwelling, calculation of market opportunities is used while to know the feasibility in financial terms, due diligence analysis calculation is used with the investment parameters, namely NPV, IRR and PP.After been analysed, it is concluded that the market opportunities of Ume Malinan Permai housing is very promising because of the large market opportunities (market potencial) in Kupang are 58489 units in 2018.From the economic aspect with the investment cost of Rp. 9,536,722,200.00 and the calculation of investment feasibility test within a period of 5 years using 4 different sales assumptions it has been concluded that the fourth assumption is greater than 3 other assumptions withNPV of Rp. 5,548,503,421,IRR of 25.2112% and PP for 3 years. Ume Malinan Permai housing conducted by PT. Spison Brajo is feasible to be realized on financial aspects.
KAJIAN KRITERIA DALAM SISTEM PEMILIHAN PEMASOK MATERIAL OLEH PERUSAHAAN KONTRAKTOR DI KOTA KUPANG MENGGUNAKAN METODE ANALYTICAL HIERARCHY PROCESS (AHP) Messah, Yunita A.; Utomo, Sudiyo; Tefu, Santi F.
Jurnal Teknik Sipil Vol 5, No 1 (2016): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1030.5 KB)

Abstract

Material merupakan bagian penting dalam suatu proses konstruksi. Sebagai pelaksana, perusahaan kontraktor memiliki 3 sistem dalam memilih perusahaan pemasok material yang meliputi sistem seleksi untuk semua perusahaan pemasok material, sistem seleksi untuk beberapa perusahaan pemasok material yang dianggap perusahaan telah memenuhi standar dan sistem penunjukan langsung. Dari ketiga sistem tersebut terdapat sebuah kriteria yang merupakan prioritas perusahaan kontraktor untuk memilih pemasok material. Tujuan dari penelitian ini adalah untuk mengetahui sistem pemilihan apa dari ketiga sistem tersebut yang sering digunakan perusahaan kontraktor di Kota Kupang dalam memilih pemasok material dan kriteria apa dalam sistem tersebut yang menjadi prioritas perusahaan kontraktor dalam memilih pemasok material. Data yang diperlukan meliputi data primer yang diperoleh dari hasil wawancara dan digunakan untuk memperoleh sistem pemilihan pemasok material yang sering digunakan perusahaan kontraktor di Kota Kupang serta dari hasil pengisian kuesioner digunakan untuk memperoleh kriteria yang menjadi prioritas dari ketiga sistem tersebut. Hasil kajian menunjukan bahwa 62,34% perusahaan kontraktor di Kota Kupang lebih sering menggunakan sistem penunjukan langsung untuk memilih perusahaan pemasok material. Dari ketiga sistem pemilihan yang ada, kriteria kualitas dan biaya merupakan kriteria yang menjadi prioritas dalam ketiga sistem pemilihan tersebut dengan persentase kriteria kualitas sebesar 85,4% dan persentase kriteria biaya sebesar 37%.
BIAYA KEMACETAN RUAS JALAN KOTA KUPANG DITINJAU DARI SEGI BIAYA OPERASIONAL KENDARAAN Bolla, Margareth E.; Yappy, Ricky A.; Sir, Tri M. W.
Jurnal Teknik Sipil Vol 6, No 1 (2017)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (476.44 KB)

Abstract

Congestion is one of unresolved problem in the major cities in the world, including in Indonesia. In Kupang City, including at Jend. Sudirman street, congestion happen at peak hours in the morning and afternoon. This study takes the case on two representative points at Sta. 00+750 and Sta. 01+418 and analysis for Vehicle Operating Costs (VOC) have done by per peak hour and then taken the average per point. Calculation of VOC refers to the similarities in Manual BOK 1995 method and LAPI ITB-PT. Jasa Marga method. Furthermore, by selecting the VOC, the largest from the two methods, are used to determine the amount of congestion cost per peak hour per vehicle by using the equation Tzedakis (1980). Based on the analysis, the result of VOC of Jend. Sudirman road is Rp. 8,938,-/hour for motorcycles (MC), Rp. 204,320,- /hour for vehicle car (LV) and Rp. 565,661,- /hour for heavy vehicles (HV), where bad Level of Service (LOS) happen at 6:30 to 7:30 pm, 09:00 to 10:00 am, 12:00 to 13:00 pm and 17:00 to 19:00 pm. In addition, total congestion costs is Rp. 723,241/vehicle/peak hour/trip
KOEFISIEN LIMPASAN PERMUKAAN PADA EMBUNG KECIL DI PULAU SUMBA Krisnayanti, Denik S.; Karels, Dolly W.; Nurdin, Ramadhan R.
Jurnal Teknik Sipil Vol 7, No 2 (2018): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (609.495 KB)

Abstract

Pulau Sumba dengan luas 11.005,62 km2 memiliki curah hujan yang tidak merata dimana semakin ke bagian barat pulau curah hujan yang terjadi semakin tinggi.Curah hujan yang relatif tinggi dan kondisi geografis Pulau Sumba yang sebagian besar wilayahnya berbukit-bukit dapat dioptimalkan untuk membangun embung kecil. Penelitian ini dilakukan pada 4 kabupaten di Pulau Sumba.Metode yang digunakan adalah metode analisis matematis, grafik Puslitbang, metode Hassing, dan tabulasi software GIS.Data yang digunakan dalam penelitian ini adalah data curah hujan, klimatologi, dan data teknis embung tahun terbaru. Nilai koefisien limpasan permukaan yang didapat dengan metode analisis matematis berkisar antara 0,24 – 0,76, dengan grafik Puslitbang berkisar antara 0,34 – 0,99, nilai dengan metode Hassing didapat antara 0,28 – 0,46, dan nilai berdasarkan tabulasi GIS berkisar antara 0,26 – 0,65.Sumba islandwith an area of 11,005.62 km2havethe uneven distribution of high rainfall which the more westerly a trajectory is taken across the island, the higher the rainfall becomes.With a relatively high rainfall, the geographical conditions of Sumba Island, mostly its territory is hilly can be optimized to building a small retention basin. This research was conducted on 4 districts in Sumba Island. There are several methods used in this study; the method of mathematical analysis, graphical of research and development center, Hassing method, and tabulation GIS software. The data used in this research are rainfall, climatology, and technical data of the latest year of the retention basin. The value of the surface runoff coefficient obtained by mathematical analysis method ranged from 0,24 - 0,76, with graph of Research and development center ranged between 0,34 - 0,99, the value with Hassing method got between 0,28 - 0,46, and the value based on tabulation of GIS ranged between 0,26 – 0,65.
KAJIAN HUBUNGAN WASTE MATERIAL KONSTRUKSI DAN ORGANISASI PROYEK KONSTRUKSI Messah, Yunita A.
Jurnal Teknik Sipil Vol 1, No 1 (2011)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (324.913 KB)

Abstract

ABSTRAKMaterial merupakan salah satu komponen penting yang harus diperhatikan karenasangat mempengaruhi nilai produktivitas dan biaya proyek. Material dalam pekerjaankonstruksi mempunyai kontribusi sebesar 40-60% dari biaya proyek, sehingga secaratidak langsung memegang peranan penting dalam menunjang keberhasilan proyekkhususnya dalam komponen biaya. Pada proses konstruksi, penggunaan material olehpekerja-pekerja di lapangan dapat menimbulkan sisa material yang cukup tinggi. (Intan,S.,dkk, 2005). Pihak-pihak yang terlibat dalam pekerjaan konstruksi mempunyai peranpenting dalam terjadinya waste material. Kajian ini dilakukan untuk mengetahui pihakyang paling berperan dalam waste material pada pekerjaan konstruksi dengan studikasus struktur organisasi proyek Kuningan City. Hasil analisa mean menunjukan bahwakontraktor pelaksana mempunyai peran paling penting dibandingkan dengan konsultanperencana dan owner, hal ini ditunjukan dengan hasil analisis kontraktor pelaksana79.17%, konsultan perencana, 16.67% dan owner 4.17%. Untuk pihak kontraktorpelaksana, koordinator engineering paling berperan dalam waste material konstruksidengan prosentase 29.17% dan diikuti oleh bagian logistik, 20.83%.
PENGGUNAAN LIMBAH BATU MARMER DARI GUNUNG BATU NAITAPAN KABUPATEN TIMOR TENGAH SELATAN Nauk, Sepriulus S.; Hunggurami, Elia; Bolla, Margareth E.
Jurnal Teknik Sipil Vol 1, No 4 (2012)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (479.599 KB)

Abstract

The activity of marble mining at Mount Naitapan produces wastes such as powder and marble rocks. Efforts to utilize this waste as an alternative to aggregate in concrete mix. This research aims to discover the magnitude of compressive strength if aggregates in concrete that using marble waste as replacement. Specimens used is concrete cylinders. The marble waste used in three treatments of substitution they were substitution of marble powder by sand, marble rocks by the split stone, marble powder and marble rock by sand and split stone.The percentage of each substitution is 25%, 50%, 75%, 100%. The test result showed that for concrete with the substitution of marble powder by the sand and substitution of marble powder and marble rock by sand and split stone to substitute 75% increase while the compressive strength of 100% lower compressive strength. Substitution of marble rocks by the split stone had increased compressive strength.
STUDI PERENCANAAN PENGEMBANGAN PENYEDIAAN AIR BERSIH Krisnayanti, Denik Sri; Udiana, I Made; Benu, Henry Jefrison
Jurnal Teknik Sipil Vol 2, No 1 (2013): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (414.001 KB)

Abstract

The water is very important to human life. Human does not live without getting enough to water supply either in quantity and quality.The method used in the calculation projection of population that using aritmatic method and exponential method. The incresing of facilities and calculation projection which is analyzed by deviation standart and hidrolis analysis to pipeline that using software Waternet 2.2. Based on analysis and evaluation of the planning development in the first phase in 2021. It is founded the population of projection in District of East Kupang amounts 58.697 people. The water suplay is needed by domestic, namely home connection (SR) and public hydrant (HU) amounts 107,02 liter/sec and than the loss of water amounts 15%. Therefore, the requirements of water is founded to 8 villages namely 123,07 liters/sec. From the sources of water that is exis with minimum discharge 145 liters/sec, it is able to serve of requirement clean water in the servise area to 8 villsges in East Kupang District. The result of hydraulic analysis on pipeline plans uses software WaterNet 2.2 and there is no node that has a relative pressure under 10 meter. Therefore, the water can flow into each node within 24 hours. The maximum relative pressure occurs at node 51, it is 127,90 m in Naibonat Village. This is caused by the different of reservoir elevation with a service area until the pressure of relative getting high. The relative pressure can be derived using the PRV valve that is installed of the heigh in 68,39 m and then the lowest of relative pressure occurs at 74, namely 16,08 m in the Tuatuka Village. The highest energy loss occurs in the pipe 4 until 33,67 m at 08:00 O’clock AM wita. The maximum of flow velocity occours on pipe number 1,2,3 and 4 is equal 2,087 m/sec at 08:00 O’clock AM wita whereas the minimum of flow velocity occours on pipe 71 is equal 0,000 m/sec at 01:00 – 02:00 AM wita because of in the time there is no use at all.
PERENCANAAN SISTEM IRIGASI TETES (DRIP IRRIGATION) DI DESA BESMARAK KABUPATEN KUPANG Udiana, I Made; Bunganaen, Wilhelmus; Pa Padja, Rizky A.
Jurnal Teknik Sipil Vol 3, No 1 (2014): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (94.813 KB)

Abstract

Water is an important natural resource for human needs one of them in agriculture . Village Community Besmarak mostly farmers who use wells as the main source of water . How to water provision applied by the villagers of Besmarak not effective , efficient and the results are uneven . The drip irrigation system is one of the alternatives in resolving the matter. The drip irrigation system is the provision of water to the plant continuously around the root zone of plants . The main components in a drip irrigation system is the emitter (dropper) , lateral pipes , pipe divider , main pipes , water pumps , and other ancillary components. In planning a drip irrigation system in the village Besmarak , plants in the review is the tomato plant. Value of reference evapotranspiration (ETo) was calculated with the program cropwat 8.0 ranged from 4.32 to 7.47 mm/day and the value of crop evapotranspiration (ETc) ranged from 2.97 to 6.89 mm/day . Effective precipitation ranged from 0 to 63.2 mm/month . Discharge emitters are selected to meet the water needs of the plant is 4 l/ h and substantial rate of droplet emitternya ie 11,428 mm/hour . Based on calculations of power pumps used to lift water to land is 0.5 kW.

Page 5 of 19 | Total Record : 185