cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota kupang,
Nusa tenggara timur
INDONESIA
Jurnal Teknik Sipil
ISSN : 20894953     EISSN : 2775815X     DOI : -
Core Subject :
Arjuna Subject : -
Articles 185 Documents
ANALISIS KEBUTUHAN ANGKUTAN UMUM JALUR KOLHUA  BUNDARAN PU DAN BANGKITAN PERJALANAN PENDUDUK YANG MENGGUNAKAN KENDARAAN PRIBADI Yane, Magdalena B.; Sir, Tri M. W.; Hunggurami, Elia
Jurnal Teknik Sipil Vol 5, No 1 (2016): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (114.806 KB)

Abstract

Dalam melakukan perjalanan sehari-hari penduduk Kelurahan Kolhua dan sebagian penduduk Kelurahan Maulafa dan Oepura hanya terlayani oleh sarana angkutan pribadi dan angkutan umum (ojek). Penelitian ini bertujuan untuk mengetahui peluang penggunaan moda transportasi, besarnya jumlah permintaan pelayanan angkutan umum, jumlah kebutuhan armada angkutan umum dan faktor-faktor apa saja yang lebih berpengaruh terhadap bangkitan perjalanan penduduk menggunakan kendaraan pribadi. Hasil penelitian menunjukkan bahwa jumlah perjalanan penduduk berdasarkan moda transportasi di Kelurahan Kolhua, Maulafa dan Oepura adalah sebanyak 356 kali perjalanan atau sebesar 44,61% menggunakan kendaraan pribadi sedangkan sebanyak 182 kali perjalanan atau sebesar 22,81% menggunakan angkutan umum (ojek). Jumlah permintaan pelayanan angkutan umum adalah sebanyak 2057 permintaan dan jumlah armada yang dibutuhkan adalah 9 unit. Wilayah ini tidak dapat dimasukkan dalam wilayah pelayanan angkutan umum penumpang karena jumlah permintaan angkutan umum (D) < R.Pmin = 5000 permintaan dan jumlah kendaraan yang dibutuhkan, N = 9 < R = 20 unit. Dan diketahui faktor yang lebih berpengaruh terhadap bangkitan (jumlah) perjalanan penduduk yang menggunakan angkutan pribadi (Y) adalah variabel jumlah anggota keluarga yang bekerja/sekolah (X2) dan jumlah kendaraan (X3).
KESEIMBANGAN AIR (WATER BALANCE) DI KABUPATEN SABU-RAIJUA Ndoen, Oliver K.; Krisnayanti, Denik S.; Utomo, Sudiyo
Jurnal Teknik Sipil Vol 6, No 1 (2017)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1683.063 KB)

Abstract

Sabu Raijua is one of districts in East Nusa Tenggara province with dry climate that have annual rainfall about 997 mm/year and including in low grade (
ANALISIS NILAI RESIKO PROYEK KONSTRUKSI MENGGUNAKAN QUALITATIVE RISK ANALYSIS Messah, Yunita A.
Jurnal Teknik Sipil Vol 1, No 2 (2011)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (56.812 KB)

Abstract

ABSTRAKProyek konstruksi memiliki karakteristik yang unik dimana setiap proyek mempunyaikeunikan tersendiri baik dari lokasi proyek, waktu pelaksanaan, metode pelakasanaan,material, tenaga kerja dan lain-lain. Uniknya proyek konstruksi menyebabkanketidakpastian resiko dalam tiap tahapan proyek. Untuk itu, perlu dilakukan analisamengenai resiko dari tiap proyek dan proyek mana yang berpeluang untuk menang danmenguntungkan.Studi analisis ini dilakukan pada salah satu perusahaan konsultan X yang mendapattawaran pekerjaan perencanaan 3 (tiga) pada proyek konstruksi. Ketiga proyek tersebutyaitu Laboratorium Kimia suatu Universitas Lokal, Gedung kantor Dewan dan Fasilitassanitasi perusahaan pengelohan limbah kota. Analisis resiko menggunakan QualitativeRisk Analysis. Analisa dimulai dari mengidentifikasi resiko-resiko yang kemungkinanterjadi dalam tiap proyek, besar kemungkinan akan terjadi dan seberapa besar dampakyang akan diterima sebagai konsultan perencana.Berdasarkan analisis yang dilakukan, diperoleh jumlah resiko untuk proyek LaboratoriumKimia sebanyak 9, Gedung Kantor Dewan, 10 dan Fasilitas Sanitasi PerusahaanPengelolaan Limbah Kota, 7 faktor resiko. Untuk nilai resiko, proyek Gedung KantorDewan memiliki nilai resiko terkecil yaitu 146, proyek Laboratorium Kimia, 194.4 danproyek Fasilitas Sanitasi Perusahaan Pengelolahan Limbah Kimia sebesar 364.3. dari nilairesiko yang diperoleh, perusahaan dapat memilih proyek yang berpeluang untukdimenangkan dan menguntungkan.
KINERJA LALU-LINTAS SIMPANG TAKBERSINYAL PADA KOMPLEKS KAMPUS UNIVERSITAS NUSA CENDANA Frans, John H.; Bunganaen, Wilhelmus; Banu, Matelda
Jurnal Teknik Sipil Vol 7, No 1 (2018): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (3972.558 KB)

Abstract

Arus lalu-lintas pada area kampus terus meningkat setiap tahunnya, hal inilah yang menyebabkan terjadinya masalah lalu-lintas khususnya pada daerah simpang, sehingga perlu dilakukan analisi. Analisis dilakukan pada 5 simpang dengan menggunakan aturan dalam Manual Kapasitas Jalan Indonesia (MKJI) 1997. Berdasarkan hasil penelitian yang dilakukan, volume kendaraan terbesar pada jam puncak pagi hari (simpang I, simpang II dan simpang V) dan pada siang hari (simpang III dan simpang IV). Cara paling cepat untuk mengetahui kinerja dari suatu simpang dapat dilihat nilai derajat kejenuhannya, untuk itu berdasarkan hasil perhitungan dapat disimpulkan bahwa dari kelima simpang yang dianalisis, simpang yang sudah dalam keadaan jenuh yaitu simpang I dengan nilai derajat kejenuhan sebesar 0,89 dan simpang II dengan nilai derajat kejenuhannya sebesar 1,07, dimana nilainya lebih besar dari 0,75. Rekomendasi peningkatan kinerja pada simpang berupa alternatif perubahan lebar pada pendekat jalan utama dan jalan minor, pengalihan arus lalu-lintas dan larangan parkir pada daerah simpang. Setelah direkomendasikan alternatif tersebut, derajat kejenuhan pada simpang I menjadi 0,62 dan derajat kejenuhan pada simpang II menjadi 0,57 lebih kecil dari 0,75.Traffic flow on campus area continues to increase every year, it causes traffic problems, especially in the intersection, so it needs to be done analysis. The analysis was performed on 5 intersections using the rules in the Manual Kapasitas Jalan Indonesia (MKJI) 1997. Based on the results of the research, the largest volume of vehicles at the peak hour of the morning (intersection I, intersection II and intersection V) and at noon (intersection III and Intersection IV). The fastest way to determine the performance an intersection can be seen the saturation degree value, for that based on the calculation results can be concluded that from the five intersections are analyzed, intersection that already in the saturated state of intersection I with the value of degree of saturation of 0,89 and intersection II with The value of its saturation degree of 1,07, where the value is greater than 0,75. Recommendation of performance improvement at intersection in the form of alternate width change on main road and minor road approach, traffic diversion and parking ban at intersection area. After the recommended alternative, the saturations degree at intersection I becomes 0,62 and the saturations degree at intersection II becomes 0,57 smaller than 0,75.
KAJIAN KARAKTERISTIK KECELAKAAN SEPEDA MOTOR DI KOTA SURABAYA Bolla, Margareth Evelyn
Jurnal Teknik Sipil Vol 1, No 1 (2011)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (766.447 KB)

Abstract

Dosen Jurusan Teknik Sipil FST Undana 67KAJIAN KARAKTERISTIK KECELAKAAN SEPEDA MOTORDI KOTA SURABAYAMargareth Evelyn Bolla*)ABSTRAKKota Surabaya adalah salah satu kota yang mengalami peningkatan tajamjumlah kecelakaan sepeda motor, dimana setiap harinya rata-rata dua orangmeninggal dunia akibat kecelakaan sepeda motor. Penelitian ini bertujuan untukmengetahui karakteristik kecelakaan sepeda motor di kota Surabaya, sertamenyusun rekomendasi program aksi. Metode yang digunakan adalah analisisdeskriptif dengan data yang diperoleh dari Kepolisian Wilayah Kota BesarSurabaya, berupa data kecelakaan tahun 2006 – April 2009. Lokasi penelitianmeliputi 20 ruas jalan arteri.Hasil analisis deskriptif menunjukkan bahwa proporsi terbesar kecelakaansepeda motor terjadi pada hari kerja (Senin – Jumat), pukul 06.00 – 12.00 WIB,dengan mayoritas pengendara yang terlibat kecelakaan berjenis kelamin laki-laki(83%), berusia produktif 18 - 25 tahun (28%), dan bekerja di sektor swasta (76%).Ruas jalan Ry. Ahmad Yani merupakan ruas jalan dengan rata-rata kecelakaansepeda motor tertinggi (4.5 kecelakaan/bulan) dan rata-rata korban terbesar (2.3orang meninggal dunia atau luka berat/bulan).Program aksi yang direkomendasikan antara lain: pengawasan yang lebihefektif di ruas jalan kota Surabaya pada hari Senin – Jumat, pukul 06.00 – 12.00WIB, penetapan jalan Ry. Ahmad Yani sebagai kawasan tertib lalulintas, sertaperbaikan dalam upaya penanganan kecelakaan untuk meminimalkan jumlahkorban khususnya korban meninggal dunia dan luka berat.ABSTRACTSurabaya is one of the cities that has increasing amount of motorcycleaccident, in which there were about two victims killed every day. This study aimsto find the characteristics of motorcycle accidents in Surabaya and to developrecommendation relating with motorcycle safety program. The method used isdescriptive analysis with the data based on the data of accidents in the year 2006to April 2009 which is obtained from the Police Department. This study covered20 arterial roads.The result of the descriptive analysis shows that most of motorcycleaccidents happened at the working day (Monday – Friday), at 06.00 – 12.00 am.Male-riders (83%) with ages range between 18 – 25 (28%), and who thoseworking at the private sectors (76%) had the most portion of getting accidents.The Ahmad Yani street had the highest rate of accident (4.5 accident/month), with2.3 victims killed or seriously injured per month.The action programs recommended based on the result of descriptiveanalysis are: pay more attention the safety situation for arterial roads at workingday (Monday – Friday), at 06.00 – 12.00 am, establish the Ahmad Yani street as one of the road safety zone, and improve the mechanism of emergency responseto traffic accident victims
PROGRAM DESAIN PENULANGAN DINDING PENAHAN TANAH (RETAINING WALL) MENGGUNAKAN PERANGKAT LUNAK VISUAL BASIC .NET 2008 Star, Anastasia; Bella, Rosmiyati A.; Cornelis, Remigildus
Jurnal Teknik Sipil Vol 1, No 4 (2012)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2081.667 KB)

Abstract

The retaining wall usually used to resist lateral pressure which is caused by backfill material. The stability of retaining wall is obtained mainly from its weight and the weight of the soil at the toe and the heel of retaining wall. The purpose of this research is make a program to design the semi gravity wall and the cantilever wall by using Visual Basic. NET 2008 program. SC Wall 2011 is a result of this research that using programming language of Visual Basic .NET 2008 that used to calculate the stability and reinforcement of the cantilever and semi gravity wall. Based on the output of SC Wall 2011, it shows that the program can be used to design the cantilever wall and the semi gravity wall, because its calculation is faster than the manual calculation. This program needs approximately 1.5 minutes to solve a simple problems.
ANALISA PERBANDINGAN DINDING GESER YANG SIMETRIS DAN TIDAK SIMETRIS Widodo, Theodorus; Pah, Jusuf J.S.; Ninggeding, Aditya Yohanes
Jurnal Teknik Sipil Vol 2, No 1 (2013): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (131.027 KB)

Abstract

Earthquake make a lateral force on the building. Lateral forces in tall building that exerted in the column is big enough, so need a rigid elements structure such as shear walls to reduce the lateral force. In designing of shear wall, it’s location must be considered carefully, because the placement of shear wall effected on the shear wall symmetry and would lead to eccentricity. The purpose of this study was to compare the symmetrical shear walls and asymmetrical. The method used is thre equivalent static analysis. Using dead load, live load and earthqueke load for loading parameters. This study, using 3 asymmetric shear wall specimens (0.1 b, 0.2 b, and 0.3b) and 1 symmetric shear wall. From the analysis of 3 asymmetric shear wall compared to symmetric shear walls, it is found that the most savely asymmetric shear wall is the shear wall having 0.1 b eccentricity.
ANALISA FAKTOR PENYEBAB KERUSAKAN JALAN (STUDI KASUS RUAS JALAN W.J. LALAMENTIK DAN RUAS JALAN GOR FLOBAMORA) Udiana, I Made; Saudale, Andre R.; Pah, Jusuf J. S.
Jurnal Teknik Sipil Vol 3, No 1 (2014): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (55.549 KB)

Abstract

The roads is the most important land transportation in running all the economic activities with the other social activities, in case of road damages may gummed up the works of economic activities with the others social activity also may cause the road accident for the other road users. This research was aimed to find out the types of damage, the causal factor and the solution to prevent the road corruptness in W. J. Lalamentik street and in GOR Flobamora street. The kind of method used was field research by make use primary data of the road damage survey result in W. J. Lalamentik street dan GOR Flobamora street. The result survey of road damage in W. J. Lalamentik street dan the road in GOR Flobamora street were longitudinal cracks, transverse cracks, alligator cracks, edge cracking, meandering cracks, block cracks, corrugation, bleeding, delamination, potholes, patching. Generally causal factors of road damage are the increasing of traffic load volume, unwell drainage, unwell materials construction, climate ustable land condition, very thin ossification layer planning, the processing work that inappropriate with the specification. Based on the analysis result on the road damage happened in the field then the reparation action can be done with the per segment reparation action.
EVALUASI KINERJA ANGKUTAN UMUM TRAYEK TERMINAL OEBOBO - TERMINAL KUPANG PP DAN TERMINAL KUPANG - TERMINAL NOELBAKI PP Safe, Yohanes T.; Udiana, I Made; Bella, Rosmiyati A.
Jurnal Teknik Sipil Vol 4, No 1 (2015): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (253.743 KB)

Abstract

Beberapa ruas jalan pada Trayek Terminal Oebobo-Terminal Kupang PP dan trayek Terminal Kupang-Terminal Noelbaki PP, pada jam-jam puncak angkutan umum yang ada cenderung digunakan melebihi kapasitas maksimumnya. Keadaan sebaliknya terjadi pada jam non-puncak, kendaraan umum setengah kosong dan harus melakukan kompetisi dengan angkutan umum lainnya untuk mendapatkan penumpang. Tujuan dari penelitian adalah mengetahui kinerja pelayanan angkutan umum, kebutuhan angkutan umum dan membuat rekomendasi terkait dengan hasil evaluasi kinerja pelayanan pada kedua trayek ini. Dalam penelitian ini indikator kinerja angkutan umum yang dinilai adalah faktor muat, waktu perjalanan, frekuensi pelayanan, waktu antara, waktu tunggu, jumlah kendaraan yang beroperasi, dan waktu pelayanan. Indikator-indikator tersebut diperoleh dari hasil survey dinamis dan survey statis. Dari hasil evaluasi standar pelayanan angkutan umum menurut Dirjen Perhubungan Darat, kinerja pelayanan angkutan umum pada trayek Terminal Oebobo-Terminal Kupang PP dan Terminal Kupang-Terminal Noelbaki PP termasuk kategori baik. Kebutuhan jumlah angkutan umum pada trayek Terminal Oebobo-Terminal Kupang PP adalah 22 unit, sedangkan untuk trayek Terminal Kupang-Terminal Noelbaki PP sebanyak 40 unit. Berdasarkan hasil evaluasi diberikan rekomendasi diantaranya: jumlah angkutan umum yang sudah ada dipertahankan saja atau dikurangi hingga mendekati nilai rata-rata jumlah kendaraan beroperasi setiap hari serta perlunya pembinaan pada pengemudi tentang kesadaran berlalu lintas yang baik di jalan raya. Sometimes in Oebobo Station-Kupang Station route and Kupang Station-Noelbaki Station route, over capacity for public transportation happened in the peak time especially in several roads. While, in peak off time, most of public transportation have no passanger, so they had to compotate with the other transportation the get the passanger. Service operational planning of public transportation should be evaluate as soon as possible to know how about the performance of public transportation services. The goal of this research are to know about public transportation services performance, fleet necessity of public transportation and make recommendations relating to the results of the performance evaluation of services on this route both. The indicators of this research are public transportation performance, load factor, time journey, frequency, time line, passenger time waiting, the quantity of vehicle operated, and time services. All of these indicators get from dinamyc and statistic survey. From the results of the public transport service standards evaluation by the Directorate General of Land Transportation, the performance of public transport services on the Oebobo Station-Kupang Station Route and Kupang Station-Noelbaki Station Route including good categories. The needs of public transport fleet on the Oebobo Station-Kupang Station Route is 22 units, whereas for Kupang Station-Noelbaki Station Route 40 units. Based on the results of the evaluation given recommendations are: for while the number of existing public transport or retained only if necessary, be reduced to close to the average value of the number vehicles in operation each day as well as the need for guidance drivers about traffic awareness good on the highway.
STUDI PARAMETRIK PERTEMUAN BALOK KOLOM INTERIOR PADA PORTAL BETON BERTULANG MENGGUNAKAN METODE STRUT AND TIE Simatupang, Partogi H.; Hunggurami, Elia; Ina, Aditya B.
Jurnal Teknik Sipil Vol 5, No 1 (2016): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (358.894 KB)

Abstract

Untuk mendesain D-region diperlukan analisa yang lebih mendalam dengan berdasar pada bentuk trajektori tegangan elemen yang ditinjau. Tujuan dari penelitian ini adalah untuk mengetahui bentuk trajektori tegangan, jumlah tulangan serta konfigurasi penulangan pada daerah pertemuan balok kolom interior berdasarkan metode Strut and Tie dibandingkan dengan metode konvensional. Pada penelitian ini, pemodelan strut and tie dilakukan pada pertemuan balok kolom interior dari portal beton bertulang 2 lantai. Trajektori tegangan pada pertemuan balok kolom interior memiliki bentuk yang menyilang antara trajektori tekan dan trajektori tarik. Studi parametrik pertemuan balok kolom interior pada portal beton bertulang menggunakan metode Strut and Tie menghasilkan jumlah tulangan yang lebih sedikit dibanding metode konvensional dengan persentase perbedaan terhadap metode SNI 03-2847-2002 sebesar 14,18%, sedangkan terhadap metode R. Park dan T. Paulay sebesar 3,58%.

Page 8 of 19 | Total Record : 185