cover
Contact Name
-
Contact Email
-
Phone
-
Journal Mail Official
-
Editorial Address
-
Location
Kota kupang,
Nusa tenggara timur
INDONESIA
Jurnal Teknik Sipil
ISSN : 20894953     EISSN : 2775815X     DOI : -
Core Subject :
Arjuna Subject : -
Articles 185 Documents
KAJIAN EXPERIMENTAL DAN NUMERIK DESAIN PERANCANGAN ELEMEN BATANG PROFIL L BERBAHAN FERROCEMENT SEBAGAI PENGGANTI ELEMEN RANGKA KUDA-KUDA ATAP RINGAN BERBAHAN KAYU ATAU BERBAHAN BAJA Cornelis, Remigildus
Jurnal Teknik Sipil Vol 1, No 3 (2012)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (1387.547 KB)

Abstract

AbstrakPenelitian ini bertujuan mengkaji secara numerik dan eksperimen desain rancanganelemen batang profil L berbahan ferrocement sebagai elemen pengganti untuk rangkabatang kuda-kuda kayu untuk atap rumah sederhana. Penelitian ini dilakukan berdasarkankajian mekanikal elemen batang profil L yang memungkinkan untuk digunakan padarangka kuda-kuda sederhana. Kajian numerik yang dilakukan adalah menggunakanmetode elemen hingga dengan memanfaatkan software ADINA SAP 2000, sedangkankajian eksperimental dilakukan dengan membuat model rangka kuda-kuda sederhana.Hasil kajian numerik yang diperoleh menunjukkan bahwa keruntuhan material masihdominan adalah keruntuhan tekan dimana tidak ada pengaruh faktor panjang elemenbelum dan diperoleh Safety Factor (SF)>3,0. Hasil kajian menunjukkan bahwa hasilkajian numerik hampir mendekati pengujian secara experimental dimana untuk bebanringan, rancangan ini dapat dimungkinkan digunakan untuk konstruksi atap atau rangkabatang yang mengalami beban yang kecil (sederhana)
KEHEMATAN BIAYA MATERIAL AKIBAT PENGGUNAAN BATA RINGAN CLC UNTUK PEKERJAAN PASANGAN DINDING DAN PEKERJAAN BETON BALOK STRUKTURAL Pah, Jusuf J. S.; Karels, Dolly W.; Herat, Maria F. P. I.
Jurnal Teknik Sipil Vol 7, No 1 (2018): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (257.615 KB)

Abstract

Tujuan penelitian ini adalah mencaritahu kehematan biaya material yang diperoleh dari penggunaan bata ringan CLC pada pekerjaan pasangan dinding dan pekerjaan beton balok struktural. Total biaya untuk 1m2pasangan dinding bata ringan tebal 7,5cm sebesar Rp 107.339,09 lebih hemat 30,56 % dibandingkan harga 1m2 apabila menggunakan bata merah tebal 6cm sebesar Rp 154.558,57. Namun jika dibandingkan dengan batako sebesar Rp 91.892,73 lebih murah 16,81% dan pasangan dinding yang menggunakan bata merah tebal 8cm sebesar Rp 102.692,73 per m2 lebih murah 4,52%. Total biaya untuk 1m2pasangan dinding bata ringan tebal 10cm sebesar Rp 130.010,94 lebih hemat 16,91% dibandingkan harga 1m2 apabila menggunakan bata merah tebal 6cm sebesar Rp 154.558,57. Namun jika dibandingkan dengan batako sebesar Rp 91.892,73 lebih murah 39,78% dan pasangan dinding yang menggunakan bata merah tebal 8cm sebesar Rp 102.692,73 per m2 lebih murah 25,08%. Hasil analisis persentase pekerjaan balok diperoleh kehematan maksimum pada bentang 6m sebesar 42,45% terhadap ketiga material pembanding sedangkan kehematan minimum untuk pekerjaan balok diperoleh sebesar 7,96% pada bentang 7m.This study aimed at finding out the saving of material cost in masonry works using CLC bricks and in the works of its reinforced concrete supporting beam. Total cost for 1m2 pair of heavy brick wall 7.5cm thick of Rp 107,339,09 more efficient 30.56% compared to the price of 1m2 when using a 6cm thick red brick of Rp 154,558,57. However, when compared with the brick as much as Rp 91,892,73 cheaper 16,81% and wall pair using red brick 8cm thick equal to Rp 102.692,73 per m2 cheaper 4,52%. Total cost for 1m2 pair of 10cm thick light brick wall Rp 130.010,94 16,91% cheaper than 1m2 price when using 6cm thick red brick of Rp 154,558,57. However, if compared with the brick as much as Rp 91.892,73 39.78% cheaper and the wall pair using red brick 8cm thick as Rp 102.692,73 per m2 cheaper 25,08%. The result of beam work percentage analysis obtained maximum savings at 6m span of 42.45% against the three comparable materials while the minimum saving for beam work was obtained at 7.96% in span of 7m.
KAJIAN SISTEM IRIGASI SPRINKLER DI DESA OESAO KABUPATEN KUPANG SPRINKLER IRRIGATION SYSTEM STUDY IN THE OESAO VILLAGE DISTRICT OF KUPANG Kiik, Vincensius Paskalis; Nasjono, Judi K.; Udiana, I Made
Jurnal Teknik Sipil Vol 1, No 3 (2012)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (113.621 KB)

Abstract

ABSTRAKProvinsi Nusa Tenggara Timur merupakan salah satu provinsi yang baru menggunakan teknologiIrigasi sprinkler. Dari penggunaan teknologi yang baru khususnya untuk masyarakat Oesao maka halyang dievaluasi adalah koefisien keseragaman (CU), debit sprinkler, cara penyiraman menggunakansistem sprinkler, dan kehilangan energi pada jaringan sprinkler . Berdasarkan jaringan sprinkler yangtelah dipasang pada Daerah Oesao peneliti telah memperoleh hasil berdasarkan penelitian yaknitekanan pada lokasi penelitian digolongkan dalam tekanan menengah. Koefisien keseragaman (CU)dari jaringan sprinkler adalah 46,89% ini maka dapat diartikan bahwa penyiraman menggunakansprinkler memiliki keseragaman penyiraman yang tidak baik karena lebih rendah dari 85,00%. Debitsprinkler yang diperoleh adalah sebesar 0,0119 m3/dtk. Cara pengoperasian sprinkler yang ada padaDesa Oesao adalah sprinkler yang dioperasikan secara masing-masing atau satu demi satu.Kehilangan energi 3,2414 m dan energi total pompa untuk mencapai titik pengamatan adalah11,023m.ABSTRACTThe province of East Nusa Tenggara province is one of the new sprinkler irrigation technology.From the use of new technologies, especially for people Oesao then it is evaluated uniformitycoefficient (CU), discharge sprinkler, how to use the watering sprinkler systems, and energy loss onthe network sprinkler. Based on the sprinkler network that has been posted on the Regional Oesaoinvestigators have obtained results based on research that is the pressure at the study site isclassified in the intermediate pressure. Uniformity coefficient (CU) of the sprinkler network is46.89% , it means that watering using sprinklers have a uniform watering is not good because it islower than 85.00%. Sprinkler discharge was obtained at 0.0119 m3/dtk. The operation of the existingsprinkler to sprinkler Village Oesao is operated individually or one by one. Energy loss of 3.2414 mand total pump energy to reach the observation point is 11.023 m. Energy loss of 3.2414 m and totalpump energy to reach the observation point is 11.023 m.
KEANDALAN METODE HASPERS DAN WEDUWEN PADA DAS MANIKIN Nasjono, Judi K.; Hunggurami, Elia; Sarty, Mariana G.
Jurnal Teknik Sipil Vol 7, No 2 (2018): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (249.334 KB)

Abstract

Pada saat musim hujan, terjadi kenaikan tinggi muka air dan ketidakseimbangan debit yang ditimbulkan dari daerah hulu dengan penampang Sungai Manikin di bagian hilir. Debit maksimum dengan menggunakan data hujan perlu dievaluasi dengan debit maksimum terukur. Perhitungan besarnya debit maksimum dilakukan dengan menggunakan rumus rating curve DAS Manikin, Metode Haspers dan Metode Weduwen. Hasil analisis debit maksimum terukur periode 2009–2015 menggunakan persamaan rating curve Sungai Manikin diperoleh debit maksimum terbesar terjadi pada tahun 2009 dengan Qmaks = 154,901 m3/det, nilai terkecil yaitu pada tahun 2010 dengan Qmaks =  20,982 m3/det. Debit maksimum Metode Haspers yang terbesar terjadi pada tahun 2015 dengan Qmaks = 172,017 m3/det, nilai terkecil terjadi pada tahun 2011 dengan Qmaks = 84,224 m3/det. Debit maksimum Metode Weduwen terbesar terjadi pada tahun 2015 dengan Qmaks = 214,608 m3/det, nilai terkecil terjadi pada tahun 2011 dengan Qmaks =   82,654 m3/det. Nilai R squared Metode Haspers dan Weduwen berturut-turut adalah -0,236 dan -2,019. Tingkat kesalahan (R squared) adalah kurang dari 0,36 dengan interpretasi yang tidak memuaskan. Dengan demikian, Metode Haspers dan Weduwen tidak andal/layak dipergunakan pada DAS Manikin.During the rainy season, be an increase of water level and flow imbalances arising from cross-sectional area of the river upstream to downstream Manikin. Maximum debit by using rain data needs to be evaluated with maximum measurable debit. Calculation of the maximum discharge done using the rating curve formula of DAS Manikin, methods Haspers and Weduwen. The results of the measured maximum discharge analysis for the period 2009 - 2015 use the equation the curve rating of Manikin River obtained the greatest maximum discharge occurred in 2009 with Q max = 154,901 m 3 / sec, the smallest value was in 2010 with Q max = 20,982 m 3 / s. Maximum discharge counted Haspers method is the largest that occurs in 2015 with Q max = 172,017 m 3 / sec, the smallest value occurring in  2011 with Q max = 84.224 m 3 / sec. Method of Weduwen the largest maximum discharge occurred in 2015 with Q max = 214,608 m 3 / s, the smallest value occuring in 2011 with Q max = 82,654 m 3 / s. The value of R squared successively of Haspers and Weduwen is -0.236 and -2.019 . The error R squared is less than 0.36 with unsatisfactory interpretation. So, The Methods of Haspers and Weduwen  are not reliable or worthy of use in the Manikin River Basin.
ANALISIS KEBUTUHAN LAHAN PARKIR DI RUMAH SAKIT UMUM DAERAH Messah, Yunita A.; Lay Kanny, Roky A.E.; Rizal, Andi Hidayat
Jurnal Teknik Sipil Vol 1, No 4 (2012)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (159.666 KB)

Abstract

The regency hospital named Prof. Dr. W. Z. Johannes Kupang is located in Mochamad Hatta street. It is the one of central healthy service for Kupang society and surrounding. As the service central that most visited by public, the hospital has a problem that is the limited parking lot area. The problem makes a difficulty to the visitor to parking their vehicle because the parking is always full. Then, the visitor will parking their vehicle at the edge of Mochamad Hatta Street but it makes the traffic on the street. The method that used in this research is field survey. It is done by collecting data of observing the series number of cars and motorcycles that come in and out by the hospital. The data of research is analyzed by using regression analysis to know the influential variable of the space parkirng needed and based on the width of buildings floor. The result of the analysis is the corelation between the number of the medic and the parking needed of motorcycles which give the regression equivalent that fill the F test and t test, with the linear equivalent which is, Y = -3860.571 + 9.495 X3 and Y = -682.840 + 0.221 X1 – 0.207 X2 + 1.415 X3. By the equivalent, is known that the needed of motorcycle park is 498 partition and the needed of car park is 20 partition. Based on the parking needed and the parking width that space then know that the total space parking needed of motorcycle is 747 m2 with the parking sum is the 498 partition and the total space parking needed of car is 250 m2 with the parking sum is the 20 partition. The parking type of motorcycle that recommends is 90 degree and the parking type for car is 90 degree.
KAJIAN PENYEBAB KETERLAMBATAN PELAKSANAAN PROYEK KONSTUKSI GEDUNG DI KOTA KUPANG Messah, Yunita Afliana; Widodo, Theodorus; Adoe, Marisya L.
Jurnal Teknik Sipil Vol 2, No 2 (2013): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (106.889 KB)

Abstract

Construction projects are the activities which executed within limited schedule, limited resources to achieve the physical of buildings and other infrastructures. Construction projects entangle contractors, designers consultants , supervisor consultants which each other tied together in work agreements so called contacts . The success of a construction project depends on the fulfilling of the schedule, cost and quality prescribed on the contracts. During the project execution, it is frequently happen that the project takes more time to finished because of parts involved. Therefore, this research is done as a mean to know the factors that cause the delay of construction projects according to contractors, owners, and supervisor consultants. The research is done by propagating questionnaires to contractors, owners, and supervisor consultants. The result obtained should be analysed using mean and variant analysis. The result are: for the contractors, the main factors of delaying is the lock of man power while for the owners and the supervisor consultants, it is the materials supply factors.
PENGARUH TINDAKAN PENGAWETAN TERHADAP SIFAT MEKANIS KAYU KELAPA Hunggurami, Elia; Ramang, Ruslan; Djenmakani, Yuliana
Jurnal Teknik Sipil Vol 3, No 2 (2014): Jurnal Teknik Sipil
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (124.575 KB)

Abstract

Penelitian ini bertujuan untuk mengetahui pengaruh pengawetan terhadap sifat mekanis dari kayu kelapa.Penelitian ini dilakukan dengan metode eksperimen yaitu dengan memberikan bahan pengawet CCB dengan konsentrasi 3%, 6%, 10%.Respon yang diamati adalah kuat tekan sejajar serat, kuat tekan tegak lurus serat dan kuat lentur.Metode pengawetan yang diterapkan adalah rendaman dingin selama 2 minggu. Dari hasil penelitian dan analisis data diperoleh nilai dari sifat mekanis kayu kelapa sebelum dan sesudah pengawetan.Sebelum pengawetan diperoleh nilai kuat tekan sejajar serat sebesar 18.67 N/mm2, kuat tekan tegak lurus serat sebesar 4.22 N/mm2, dan kuat lentur sebesar 13.81 N/mm2. Sedangkan setelah diberi pengawetan 3% terjadi peningkatan terhadap nilai kuat tekan sejajar serat sebesar 7.12% yaitu 20 N/mm2, kuat tekan tegak lurus serat sebesar 5.12% yaitu 4.44 N/mm2 dan kuat lentur sebesar 34.76% yaitu 18.61N/mm2; diberi pengawetan 6% terjadi peningkatan terhadap nilai kuat tekan sejajar serat sebesar 39.26% yaitu 26 N/mm2, kuat tekan tegak lurus serat sebesar 58.06% yaitu 6.67 N/mm2 dan kuat lentur sebesar 87.76% yaitu 25.93 N/mm2; dan pengawetan 10% terjadi peningkatan terhadap nilai kuat tekan sejajar seratsebesar 71.40% yaitu 32 N/mm2, kuat tekan tegak lurus serat sebesar 158.06% yaitu 10.89 N/mm2 dan kuat lentur sebesar 119.91% yaitu 30.37 N/mm2.
PERENCANAAN INSTALASI PENGOLAHAN AIR LIMBAH RUMAH TANGGA KOMUNAL PADA DAERAH PESISIR DI KELURAHAN METINA KECAMATAN LOBALAIN KABUPATEN ROTE-NDAO Fanggi, Marthini S.; Utomo, Sudiyo; Udiana, I Made
Jurnal Teknik Sipil Vol 4, No 2 (2015)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (99.84 KB)

Abstract

Instalasi Pengolahan Air Limbah (IPAL) Komunal merupakan salah satu solusi bagi lingkungan perkotaan atau pesisir yang padat. Penelitian ini dilakukan dengan metode kuisoner dan teknik analisis yang digunakan adalah analisis deskriptif kuantitatif yang memberikan gambaran dengan jelas dan benar makna dari indikator- indikator yang ada. Sampel penelitian adalah masyarakat di RT 07, 08, 09 /RW 03, dan RT 10, 11/ RW 04 Kelurahan Metina, Kecamatan Lobalain, Kabupaten Rote Ndao, berjumlah 46 KK dari 262 KK. Skor rerata ideal 37,25 sampai 39,5 digolongkan pada kategori cukup baik karena modus berada pada kategori dua dengan frekuensi sebanyak 18 kali atau 39,13 %.. Desain bangunan IPAL komunal dengan tahun rencana 20 tahun. Jumlah penduduk P(2034) adalah 1330 orang, kebutuhan air bersih yaitu 80 L/orang/hari. Debit rata-rata air limbah adalah 64 liter / hari/ orang, debit puncak adalah 115,2 liter/hari/orang. Kapasitas pengolahan adalah 153,216 m3/hari. Volume bak pemisah lemak/minyak 3,192 m3, volume bak ekualisasi 31,92 m3, volume bak pengendapan awal 19,152 m3, volume bak biofilter anaerob 34,47 m3,volume bak biofilter aerob 34,47 m3. Volume bak pengendap Akhir 19,15 m3. Diameter pipa dari kloset dan air limbah non tinja adalah 100 mm. Diameter pipa utama adalah 150 mm. Waste Water Treatment Plant (WWTP) Communal is one of the solutions for the urban environment or coastal solid. This study was conducted using questionnaires and analysis technique used is quantitative descriptive analysis gives a clear and true picture of the significance of the existing indicators. Samples were people in RT 07,08,09 /RW 03 and RT 10,11 /RW 04 Metina Village, District Lobalain, Rote Ndao, totaling 46 families of 262 families. Ideal mean score 37,25 to 39,5 is classified in the category quite well because of the mode are in two categories with a frequency of 18 times or 39,13% . The building design communal WWTP with the 20 year plan. The total population is 1330 people, needs clean water that is 80 L/person/day. Average discharge of waste water is 64 liter/day/person, the peak discharge was 115,2 liters/day/person. Processing capacity is 153.216 m3/day. Volume tub fat separator 3,192 m3, the volume of 31,92 m3 equalization basin, the volume of 19,152 m3 initial deposition bath, bath volume 34,47 m3 biofilter anaerobic, aerobic biofilter volume of 34,47 m3. Final settling basin volume of 19,15 m3. Diameter pipe from the toilet and waste water non stool is 100 mm. The main pipe diameter is 150 mm.
PENGARUH PENAMBAHAN GULA PASIR TERHADAP KUAT TEKAN DAN SIFAT KEDAP AIR MORTAR Bunganaen, Wilhelmus; Hunggurami, Elia; Bei-Ngala, Yustanius
Jurnal Teknik Sipil Vol 5, No 1 (2016): JURNAL TEKNIK SIPIL
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (159.486 KB)

Abstract

Penggunanan mortar pada pekerjaan dinding rumah, kamar mandi, ataupun bak air saat ini belum maksimal karena banyak dijumpai retak dan tidak kedap air. Dalam mengatasi masalah ini biasa digunakan bahan kimia tambahan (chemical admixtures), tetapi bahan kimia tersebut harganya mahal dan sulit didapat. Penelitian ini bertujuan untuk mengetahui pengaruh penambahan gula pasir terhadap kuat tekan dan sifat kedap air pada mortar. Benda uji yang dipakai untuk pembuatan mortar berbentuk kubus berukuran 5 x 5 x 5 cm dengan variasi penambahan gula pasir 0%, 0,05%, 0,10%, 0,15%, 0,20%, 0,25%, dan 0,30% dari berat semen. Variasi campuran yang dipakai adalah 1PCC : 4Psr, 1PCC : 6Psr, dan 1PCC : 8Psr. Kuat tekan mortar maksimum adalah kuat tekan mortar dengan penambahan gula pasir 0,10 – 0,15% dan menyebabkan kenaikan kuat tekan 18,4% dari kuat tekan mortar normal. Porositas dan absorpsi mortar yang paling kecil adalah mortar dengan tambahan gula pasir 0,10 – 0,15% . Porositas mortar turun 9,99% dari porositas mortar normal dan absorpsi turun 11,84% dari absorpsi mortar normal.
PERENCANAAN DRAINASE KOTA SEBA Krisnayanti, Denik S.; Hunggurami, Elia; Dhima-Wea, Kristina N.
Jurnal Teknik Sipil Vol 6, No 1 (2017)
Publisher : Jurnal Teknik Sipil

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (143.855 KB)

Abstract

Drainage aims to drain the water from an area that comes from rain water and waste water, in order to avoid excessive inundation. The purpose of this study is planned drainage system in the city of Seba to drain water during the rainy season to prevent inundation of rainfall that is too big. The drainage zone divided into 4 zone based one the contour and the water canal that would be canalized. The divided zone also based on Seba Region RDTR (2011). Based on the calculation of the results obtained by the rectangular canal as many as 44 canals and a trapezoid shape as many as 21 canals. Canal base width (b) the average for the rectangular-shaped canal is 0.80 m, while the trapezoidal canal average of 0.50 m. The width of the surface of the trapezoidal canal average of 0.65 m. Planning drainage canals adapted to existing research data canals at the sites. There are 12 canal base width of the canal remains were taken from the existing canal data, while existing canals steeper modified according to plan based on the calculation of flood discharge plan

Page 10 of 19 | Total Record : 185