cover
Contact Name
Ade
Contact Email
ade.sri.w@unib.ac.id
Phone
+62736344087
Journal Mail Official
inersia@unib.ac.id
Editorial Address
Program Studi Teknik Sipil, Fakultas Teknik Universitas Bengkulu Jl. W.R. Supratman, Kandang Limun, Bengkulu
Location
Kota bengkulu,
Bengkulu
INDONESIA
Inersia : Jurnal Teknik Sipil
Published by Universitas Bengkulu
ISSN : 20869045     EISSN : 26865017     DOI : https://doi.org/10.33369/ijts
Core Subject : Engineering,
Each volume contains two editions. The first edtion is published in April and the second one in October. This journal accomodates the research result in the area of civil engineering, i.e. Construction Management, Geotechnical Engineering, Structural Engineering, Transportation Engineering and Water Resources Engineering.
Articles 216 Documents
PENENTUAN NILAI CBR DAN NILAI PENYUSUTAN TANAH TIMBUNAN (JALAN RUAS TAIS-MARAS KABUPATEN BENGKULU SELATAN) Muhamad Zen Zen; James Hellyward
Inersia: Jurnal Teknik Sipil Vol. 16 No. 1 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.1.67-74

Abstract

In civil engineering, soil plays a crucial role as it supports the strength of the construction above it.. Thus, research was conducted on native soil in the Tais-Maras region of South Bengkulu Regency. Testing was carried out to determine the properties of the native soil intended for construction activities, including water content according to SNI 03-1965:2008, specific gravity according to SNI 03-1964:2008, plastic limit according to SNI 03-1966:2008, liquid limit according to SNI 03-1967:2008, hydrometer analysis according                                     to SNI 03-3423:2008, activity value, CBR according to SNI 03-1744-1989, and shrinkage limit research according to SNI 03-1996-1990. Based on research and data calculation from disturbed soil samples in the Tais-Maras region of South Bengkulu Regency, the soil properties were determined as follows: water content (W) 98.52%, specific gravity (Gs) 2.415, liquid limit (LL) 45%, plastic limit (PL) 33.85%, Plasticity Index (PI) 11.2%, Optimum Moisture Content (OMC) 34.9%, dry density 1.120 Kg/Cm3, and a CBR design value of 3.9%. The calculated shrinkage limit value was 38%, and the soil activity value was 2.6. It can be concluded that this soil belongs to the OL category, with 'O' representing organic silt due to the hydrometer analysis showing particle sizes ranging from 0.002 mm to 0.0074 mm with high plasticity and moisture content, thus indicating that it is unsuitable for bearing construction loads.
PERAN TIM TEKNIS PADA PENGENDALIAN PROYEK PEMBANGUNAN MASJID PEMDA KOTA BENGKULU TAHAP I HENDRA OKTA
Inersia: Jurnal Teknik Sipil Vol. 16 No. 1 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.1.48-52

Abstract

In the 2022 Fiscal Year, the Bengkulu City Government is building a place of worship, namely the Bengkulu City Government Mosque, which is an iconic mosque in the red and white office complex which will accommodate ASN and the surrounding community. The research methods used are qualitative and quantitative methods, by examining various primary and secondary data collected, this case study produces the role of the Technical Team in the success of project development later.  
ANALISA PERUBAHAN DESIGN PONDASI BAWAH ABUTMENT-1 JEMBATAN KIKUBA PULAU ENGGANO DARI PONDASI SUMURAN MENJADI PONDASI BORE PILE M.Arif Rahman.S Arif; Nilda Tri Putri
Inersia: Jurnal Teknik Sipil Vol. 16 No. 1 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.1.42-47

Abstract

Foundation is a structural element that functions as a support for the construction loads above it. These loads are transmitted to the soil, so the depth of the foundation must reach the depth of hard soil; therefore, the determination of the depth and type of foundation used must be based on soil investigation conducted during the bridge construction planning phase. The Kikuba bridge project is planned to use pile foundations with a depth of 5 meters. After conducting soil investigation using drilling equipment, the N-SPT 60 results for Abutment-1 were obtained at an average depth of 19 meters, rendering pile foundations unsuitable. The accuracy of selecting the type of foundation used depends greatly on the depth of hard soil. The Kikuba bridge construction project encountered an average depth of hard soil at 19 meters, thus necessitating an analysis to change the design from pile foundations to bore pile foundations, while meeting the technical requirements of the foundation and analyzing using the Meyerhoof method.
ANALISA KONDISI STRUKTURAL PADA JALAN BERDASARKAN HUBUNGAN ANTARA KETIDAKRATAAN PERMUKAAN JALAN (IRI) DAN INDEKS KONDISI JALAN (RCI) (SP –KERKAP – BATAS SUMBAR ) kadibengkulu kadi; james Hellyward
Inersia: Jurnal Teknik Sipil Vol. 16 No. 1 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.1.53-60

Abstract

Road surface smoothness measurements are not widely conducted in Indonesia due to limited equipment, resulting in inadequate monitoring and evaluation of existing road constructions according to national road sector standards. Road surface smoothness levels can be determined by measurements using various methods recommended by Bina Marga and AASHTO. One method recommended by Bina Marga for measuring road smoothness levels is through road damage survey forms according to the 2015 road condition reporting guidelines. The average road damage level for the Sp.Kerkap–Batas Sumber Road Section is 5.130%. The location Km.Bdg. 63+000-64+000 has the highest IRI value of 12, dominated by damage such as shallow potholes covering an area of ​​8,916.56m², which is planned to be repaired using hotmix patching. Therefore, road observers must be vigilant and regularly report road damages every month to ensure the stability and condition of the road are well maintained, in order to facilitate and support economic flow/velocity. Proper and appropriate handling will keep the road in good condition based on the planned road stability.
OPTIMASI WAKTU DAN BIAYA PROYEK KONSTRUKSI GEDUNG DENGAN METODE TIME COST TRADE OFF (Studi Kasus Proyek Non Struktur Gedung Perkantoran Tiga Lantai Tahap Lanjutan di Kota Bengkulu) Iqbal Alfayed; Fepy Supriani; Agustin Gunawan
Inersia: Jurnal Teknik Sipil Vol. 16 No. 1 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.1.29-41

Abstract

  The research objective was to analyze the most optimal time and cost between the additional of overtime and labor. The data used in this study is from the construction project data of a three floors office building advanced stage in Bengkulu City with non structural groups of work. Research began with project network arrangement and critical path identification using Microsoft Project program, the selected critical activity resources then added with  overtime and labor by the Time Cost Trade Off method. The results of the critical path identification showed that there are three critical jobs namely walls plastering  1 : 4 thickness 15 mm, anti-fungal exterior painting and wallpaper that selected to be accelerated in order to shorten the total duration of the critical path. The results showed that the addition of one hour of overtime for the first three days of each critical job accelerated the duration of work by 8.24%, and saved costs by 1.77%. The addition of labor of a worker and a handyman on  walls plastering  1 : 4 thickness 15 mm and anti-fungal exterior painting jobs, as well as one handyman on wallpaper job is known to accelerate the duration by 8.24%, and save costs by 0.61%. The addition of overtime results the most optimal time and cost by accelerating the duration for 7 days (8.24 %), and saving the total cost of Rp. 4.245.237,92 (1.77%)  
Analisis Faktor-Faktor dalam Perencanaan Alokasi Tenaga Kerja Konstruksi pada Proyek Rehabilitasi dan Rekonstruksi Sarana Pendidikan Universitas Tadulako Fase I andi asnudin; Ibnu Rahmatullah
Inersia: Jurnal Teknik Sipil Vol. 16 No. 1 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.1.1-7

Abstract

The purpose of this research was to find out what factors influenced the allocation of construction labor in the Phase II Tadulako University Educational Facilities Rehabilitation and Reconstruction Project. The type of research used in this research is quantitative research with a descriptive approach. The research method uses multiple linear regression analysis and data processing uses the Statistical Package for the Social Sciences version 26 application. This research uses 5 (five) variables, namely Cost (X1), Duration (X2), Volume (X3), Experience (X4) and Labor Allocation (Y). The number of samples or respondents in this research was 30 people who were management on the construction project. The partial research results show that all variables have a positive effect on craftsman performance with the regression equation Y = 2.309 + 0.51X1 + 0.519X2 + 0.168X3 + 0.480X4 but the only variables that have a significant effect are volume, duration and experience. Simultaneously, the variables cost, volume, duration and experience have a significant influence on labor allocation and it can be seen what factors have a significant influence on labor allocation.
Analisis Kekuatan Kolom Komposit Terbungkus Beton Berpenampang Bundar terhadap Kapasitas Tahanan Aksial dan Momen dengan Metode Beda Hingga Rizki Aidil; Mukhlis Islam; Ade Sri Wahyuni; Agustin Gunawan; Yuzuar Afrizal
Inersia: Jurnal Teknik Sipil Vol. 16 No. 1 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.1.21-28

Abstract

Composite column structures can provide high strength from the combination of two or more materials with different material properties which then provide better combined properties. This research was conducted by analysing the composite column structure with finite difference method and comparing the results with CSiCol application. The results of the analysis of   the Pn and Mn interaction diagram of the finite difference method composite column when compared to the CSiCol application composite column have a maximum percentage difference for the maximum Pn value of 19.17%, the maximum Mn value of 2.90%. The difference in the Pn and Mn values of  the composite column can be corrected with a regression equation using a linear correction factor and a Polinomial correction factor, with a maximum Pn percentage difference value of 8.93% for the linear correction factor and 6.84% for the Polinomial correction factor value. Therefore, the finite difference method can be used to analyse composite columns with relatively good accuracy provided that correction factors are used.    
Karakteristik Penggunaan Plastik PVC (Polyvinyl Chloride) Bahan Tambahan Campuran Aspal Porus M. Sa'dillah; Yurnalisdel; Blima Oktaviastuti; Calvin Charis Christy Nenabu
Inersia: Jurnal Teknik Sipil Vol. 16 No. 1 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.1.8-20

Abstract

Various types of plastik used by the community, including the plastik used by researchers (Polyvinyl Chloride). This type of PVC is plastik waste made from the polymerization process which is found in everyday life. One of the uses of plastik pellets is as an additional material in making asphalt. Porus which will later function as road construction adhesive. This research aims to (1) Determine the Optimal Asphalt Content value for Marshall properties (KAO) for porous asphalt mixtures (2) Characteristics of the Marshall test to determine the ideal asphalt content by adding PVC plastik waste (3) to determine the effect of adding PVC plastik pellets on performance of porous asphalt. The research method uses experimental research in the laboratory. The research will be carried out using the Australian Asphalt Pavement Association (AAPA) 2004 approach method. Testing for optimum asphalt content (KAO), namely at a level of 5%, meets the Asphalt Pavement Association (AAPA 2004) specifications for porous asphalt mixtures. Mixture testing with variations in PVC plastik content of 4% has met Australian specifications (AAPA 2004) including VIM, VMA, Stability, Flow and MQ testing.
ANALISIS KAPASITAS PROFIL BAJA WIDE FLANGE YANG EFISIEN SEBAGAI ELEMEN BALOK, KOLOM, DAN BALOK-KOLOM PADA STRUKTUR GEDUNG (Analisis Terhadap Profil IWF dan HCS Berdasarkan SNI 1729:2015) Anggara, Jeirry; Wahyuni, Ade Sri; Islam, Mukhlis
Inersia: Jurnal Teknik Sipil Vol. 16 No. 2 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.2.80-88

Abstract

The design of the steel frame structure for beam, column and beam-column elements which takes quite a lot of time makes engineers it difficult forin the field of building construction. Engineers have to do several experiments to findsteel profiles IWF and HCS that are safe, efficient and economical. The problems that arise due to the length of the design process are the basis for this research. The research was conducted on 100 profiles IWF and HCS which consisted of 81 profiles IWF and 19 profiles HCS. The analysis was carried out with reference to SNI 1729:2015. The results of this study are in the form of moment capacity graphs and tables of axial capacity of steel profiles as well as coefficients of m and U. Moment capacity graphs and tables of axial capacity of IWF and HCS profiles produced can assist in designing safe and efficient steel profiles as beam, column and column elements. column beam. Efficiency testing of steel profiles used as beam-column elements proves that the safety profile of the axial resisting profile and ultimate moment is close to the value 1.
PERAN PEMILIK KEGIATAN (PENGGUNA ANGGARAN) DALAM UPAYA PERCEPATAN PEMBANGUNAN RUMAH ADAT (TAHAP II) KABUPATEN MUKOMUKO DAN ALTERNATIF PENANGANANNYA Bewok, Apriansyah
Inersia: Jurnal Teknik Sipil Vol. 16 No. 2 (2024)
Publisher : Universitas Bengkulu

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33369/ijts.16.2.101-107

Abstract

In construction project work, there are usually several obstacles that can result in delays in the project work, both obstacles that have been taken into account and obstacles that are beyond the planner's calculations. These obstacles are the cause of delays in project completion, so that the project does not proceed according to plan, in this case in the Traditional House Construction project (Phase II) there can be delays both from a technical and non-technical perspective. This research was conducted as an effort to accelerate development and to obtain or understand the role of budget users to prevent delays in the Traditional House Development Project (Phase II). Keywords: the role of budget users in anticipating delays in the construction of traditional houses (phase II).