cover
Contact Name
agata iwan candra
Contact Email
iwan_candra@unik-kediri.ac.id
Phone
+62811308010
Journal Mail Official
iwan_candra@unik-kediri.ac.id
Editorial Address
Jl. Selomangleng 1 Gedung A no.110 - KEDIRI 64115 JAWA TIMUR - INDONESIA
Location
Kota kediri,
Jawa timur
INDONESIA
Jurnal Manajemen Teknologi dan Teknik Sipil (JURMATEKS)
Published by Universitas Kadiri
ISSN : -     EISSN : 26217686     DOI : http://dx.doi.org/10.30737/jurmateks
Core Subject : Engineering,
JURMATEKS (Jurnal Mahasiswa Teknik Sipil) diterbitkan oleh Program Studi Teknik Sipil, Fakultas Teknik, Universitas KADIRI untuk menampung hasil penelitian, tugas akhir maupun tugas proyek mahasiswa teknik sipil di lingkungan Universitas KADIRI.
Articles 15 Documents
Search results for , issue "Vol 4, No 2 (2021): OCTOBER" : 15 Documents clear
Meningkatkan Kualitas Pelayanan Jalan Raya Plandaan – Boro Tulungagung Menggunakan Perkerasan Kombinasi Geotextile Muhammad Ridho; Yosef Cahyo Setianto Poernomo; Agata Iwan Candra; Fajar Romadhon
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2595.78 KB) | DOI: 10.30737/jurmateks.v4i2.2057

Abstract

Roads as a means of transportation have an essential role in supporting human activities. One of the developments in road construction is the application of geotextiles in road combination pavements. Geotextile itself is often found in construction planning, especially in soil stabilization. The plandaan – boro Tulungagung road section is indicated by the type of silt as deep as 1.2 meters so that improvements are needed to support the quality of road construction. The purpose of this research is to plan road pavement with geotextiles on the Plandaan to boro roads. The geotextile used is a woven geogrid geotextile. The method used in planning is the Bina marga method of the 2017 Road Pavement Design Manual. The data used include technical data, traffic data, and California Bearing Ratio (CBR). The planning includes traffic design, pavement thickness calculations, and volume calculations. The planning results will be HMA – WC pavement covering an area of 4,200 m, with K225 concrete pavement covering an area of 8,400 m. Class Bﬞ Aggregate Pavement covering an area of 10,500 m using a geotextile layer requires 51,000 m² so that these results can be used as a reference in the repair or improvement of the Plandaan - boro Tulungagung road.
Optimalisasi Penjadwalan Proyek Pembangunan Gedung Puskesmas Badas Menggunakan Critical Path Method-Project Evaluation and Review Technique (CPM-PERT) Dafid Cahya Setiawan; Ahmad Ridwan; Suwarno Suwarno
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2916.706 KB) | DOI: 10.30737/jurmateks.v4i2.2011

Abstract

Lack of project scheduling planning and ineffective control make the activity of a project less efficient. This will have an impact on the success of the project. This situation will result in delays and a decrease in the quality of work due to time constraints. Scheduling is important for determining the required activities and arranging a sequence and time frame to complete project activities on time. This study aims to optimize the scheduling of a moderate light rehabilitation project in the Badas Community Health Center building, Kediri Regency, where project start-ups are experiencing delays. The method used is Critical Path Method-Project Evaluation and Review Technique (CPM-PERT), which is a method to determine the duration of a project that can be completed and the percentage of its success. The analysis carried out includes calculation the duration desired acceleration and cost slope. Analysis results using CPM-PERT obtained critical path in: preparation activities (A), earthworks (B), structural work (D), 1st floor work (E), 2nd floor work (F), 3rd floor work (G), roof, ceiling and plank work (H), iron work (I), electrical work (L), floor and wall covering work (M) and finishing work (N). The normal duration of project completion is 140 days and costs Rp. 1,818,182,709, whereas with the CPM-PERT method the duration can be accelerated to 128 days (probability 99.99%) and required additional fee 8.1% or worth Rp. 146,719,664. Implementers can use it in optimizing scheduling and financing on the badas public health center building construction project.
Optimalisasi Biaya dan Waktu Proyek Kontruksi Pelebaran Jalan Menggunakan Earned Value Sentot Tri Wibowo; Suwarno Suwarno; Ahmad Ridwan; Haris Wicaksono; Fitry Rahmawaty
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2156.877 KB) | DOI: 10.30737/jurmateks.v4i2.1828

Abstract

In a construction project, there are several aspects that cause the project not to go according to plan. Cost and time are aspects that need to be considered to avoid losses incurred in a project. Jombang-ploso-legundi-gresik road project is one of the road widening projects carried out by PT. Mix Pro Indonesia. The project was carried out with the aim that access to (Surabaya-Mojokerto) or further trans Java toll road is quicker safe and smoother. This research aims to optimize the cost and time on the project using the Earned Value method. Calculations include the calculation of ACWP (Actual Cost of Work Performance), BCWS (Budgeted Cost Work Schedule), and BCWP (Budgeted Cost for Work Performed) using the Earned Value method. From these parameters, estimate aspects of cost and time. As well as project analysis of acceleration on a critical trajectory of work. The results of calculations in the 12th week obtained a BCWS value of Rp 1,216,677,846,400 BCWP = Rp 3,040,372,140,080, ACWP = Rp 3,678,560,000. CV value = -Rp 109,203,495.92, SV = Rp 895,646,816.82, CPI = 0.827, and for SPI = 2,499. From these results it can be seen that the CPI value < 1 which means that there are project expenditures that exceed the original plan. With the results, it can be used as a reference in the implementation of project activities.
Optimalisasi Kuat Tekan dan Kuat Lentur Beton Menggunakan Campuran Lateks Ary Prastowo; Ahmad Ridwan; Edy Gardjito; Zendy Bima Mahardana
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2743.619 KB) | DOI: 10.30737/jurmateks.v4i2.2064

Abstract

Concrete is a building construction material that has an important role. Concrete itself tends to have strong properties in resisting compressive forces, but weak in resisting tensile or flexural forces. The use of additives in concrete is an option to improve the basic properties of concrete. Latex or rubber latex is one of the natural materials that can be used in concrete mixtures. Its adhesive properties can be utilized in improving the quality of concrete. This study aims to determine the compressive strength and flexural strength of concrete with the addition of latex. The research was conducted experimentally by making concrete specimens in the laboratory. The addition of latex by 10% and 30% with a planned concrete quality of fc' 29.5 MPa. The test object used is a cylinder measuring 15x30 cm and a beam measuring 15x15x30 cm. The tests carried out were testing the compressive strength and flexural strength at the age of 28 days. The results showed that the highest compressive strength was at the addition of 10% latex with a value of 9.96 MPa. While the highest flexural strength value obtained was 3.20 Mpa at the addition of 10% Latex or. From these results it can be seen that the addition of latex has not been able to improve the quality of concrete and has not been able to increase the compressive strength or flexural strength of concrete. So that these results can be used as research development or concrete production.
Kuat Tekan dan Penyerapan Batako Menggunakan Serat Pelepah Kelapa Darul Niham Wahono; Zaenuri Arifin; Yosef Cahyo Setianto Poernomo; Zendy Bima Mahardana; Ashabul Yamin
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (4484.351 KB) | DOI: 10.30737/jurmateks.v4i2.2016

Abstract

Brick is a building material that has a function as a room sealer. Its larger size, when compared to red brick, makes bricks more in demand in the market. Improving the quality of bricks needs to be done to meet the needs of the building. The use of added materials becomes one of the things that can be considered to improve the nature and quality of bricks. This research aims to find out the strong press and absorption of bricks with the use of coconut pellet fiber. The research was conducted experimentally with the manufacture of test objects in the laboratory. The test object used is in the form of a beam of 30x15x10 cm. The percentage variation of coconut fiber is 5%, 10%, and 15% of the weight mass in bricks. The tests carried out include a strong compressive and water absorption test with reference to the Indonesian National Standard (SNI). The results of water absorption tests obtained the optimum value in bricks with a mixture of 5% fiber which is 6% of the mass of the weight of the brick, while the minimum value is in the brick, 15% fiber, which is 10%. While the compressive strength results get the optimum value on the 5% fiber mix variation, which is 20.1 kg/cm², and the minimum value on the variation of 15% fiber is 8.8 kg/cm². From these results showed that bricks with coconut pellet fiber have not been able to improve the quality of bricks.
Mengurangi Durasi Pelaksanaan Proyek Dengan Menggunakan Metode Time Cost Trade Off Muhammad Rizal Hermawan; Ahmad Ridwan; Suwarno Suwarno
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2715.161 KB) | DOI: 10.30737/jurmateks.v4i2.1829

Abstract

Construction project management is one of the things that affect the smooth work of construction projects. Time and cost become benchmarks in the success of a project. In the construction project Bhayangkara Nganjuk hospital indicated experiencing delays caused by unse endorsive weather conditions. The delay will have an impact on the costs that will be incurred. The purpose of this research is to accelerate the time on the project by using the time cost trade off method. Development work includes IGD room work, Pharmaceutical Installation, Laboratory and Inpatiation Room. The data used in the form of Time schedule and budget plan costs obtained from the implementing contractor. From the data, analysis is carried out in the form of determination of relationships between jobs, determination of critical pathways, and acceleration analysis by applying a work shift system. The relationship between jobs is illustrated through the Microsoft Project. The results of the study obtained a total cost after acceleration of Rp. 3,873,505,632.00 the value was more expensive 11.25% than the normal cost of the project of Rp 3,481,698,000.00. With an accelerated duration of 125 days or 25.71% faster than the normal duration of the project of 180 days. So that from these results, it can be used as a reference in the implementation of the project regarding work hours that can be applied as well as the cost of the project and the duration of acceleration required.
Desain Struktur Atas Gedung Rawat Inap 3 Lantai RSUD Nganjuk Menggunakan Standart Nasional Indonesia (SNI) Ines Indria Wati; Edy Gardjito; Sigit Winarto; Muhammad Heri Nastotok; Imam Mustofa
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2678.361 KB) | DOI: 10.30737/jurmateks.v4i2.2067

Abstract

The hospital building is one of the building facilities that is developed continuously. The building was built as an effort to fulfill health facilities. In its construction, the hospital building must be properly planned so that it is safe to use. Planning includes the design and calculation of structural details. Several hospitals in the Nganjuk area added building units to meet the needs of the community, one of which was the Nganjuk Hospital which added a building to support services. Planning a multi-storey building is a solution because it will be able to accommodate many patients. This plan aims to plan the structure of the Nganjuk Regional General Hospital Building. The planning carried out includes the calculation of structural dimensions, calculation of loading, and calculation of reinforcement which were analyzed using SAP2000 software. The calculation results show that the dimensions of the columns used are 40/40 and 15/15 for practical columns, the dimensions of the beams are 35/50 and 30/40 and 25/35. Reinforcement on beams obtained diameters of 16 and 10 mm, reinforcement on columns obtained diameters of 19 and 10 mm, while on plates obtained diameters of 10 mm. Thus, these results can be used as a reference in the implementation of the construction of the Nganjuk Regional General Hospital Building.
Efisiensi Harga Satuan Pekerjaan Konstruksi Gedung Dengan Metode BOW (Burgerlijke Openbare Werken), SNI (Standart Nasional Indonesia) Dan Lapangan Nova Irmayanti; Ahmad Ridwan; Yosef Cahyo Setianto Poernomo; Haris Wicaksono; Fitry Rahmawaty
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2961.012 KB) | DOI: 10.30737/jurmateks.v4i2.2022

Abstract

Construction management is very necessary in project management. To increase the efficiency and effectiveness of construction development activities, a unit price calculation tool is needed, namely construction cost analysis. Contractors generally make bid prices based on analysis that is not entirely guided by BOW (Burgerlijke Openbare Werken) analysis or SNI (Standart National Indonesia) analysis. Contractors tend to calculate the unit price of work using their own analysis which is based on previous experience in completing a construction work. The purpose of this study was to analyze the unit price of work on the building using the SNI, BOW and Field methods. The work components analyzed in this study are the unit price of materials and wages for partner work and foundation work. In each calculation method used, the most economical cost budget plan is obtained, namely using the field method calculation with the unit price value for the work of a partner, it costs Rp. 509.9996.78 while for foundation work it costs Rp. 722,965.1. By using the field method, a unit price is more economical when compared to BOW and SNI methods. So that these results can be used as a reference in planning the budget for a construction project.
Meningkatkan Daya Dukung Pondasi Tiang Pancang Gedung Abipraya Mojo Kabupaten Kediri Menggunakan Metode Begemann Arif Fathur Rohman; Edy Gardjito; Agata Iwan Candra; Andri Dwi Cahyono
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2418.205 KB) | DOI: 10.30737/jurmateks.v4i2.1986

Abstract

The foundation is a lower structural element that serves to with stand the load of the upper structure. Pile foundation is one type of deep foundation, which is widely used in the construction of buildings. Pile foundation used in hard soil cases is located at a very deep depth. Abipraya Building is a building located in kediri regency which later functioned as a rural office. This study aims to increase the carrying capacity of pile foundation in the abipraya building project using the begemann method. Calculations carried out include the calculation of loading, carrying capacity, buckling factor and determination of foundation point.  Based on the calculations obtained the results of axial load (sigma Vertical Ultimate) Σνυ of 99.70. with a single-pole carrying capacity of 38.89 tons and a group pole carrying capacity of 117,917 tons. These results will be planned the foundation of the stake with a diameter of 30 with a depth of 8 meters, amounting to 4 poles. Calculation factor buckling results in 194.14 kg/cm2 smaller than the allowed maximum 2400 kg/cm2. Thus, with the known components of the planning of the pile foundation, it can be used as a reference in the construction of the abipraya building.
Desain Perkerasan Jalan Sumberboto - Gununggede Blitar Menggunakan Metode Manual Desain Uminarsih Uminarsih; Yosef Cahyo Setianto Poernomo; Agata Iwan Candra; Fajar Romadhon
Jurnal Manajemen Teknologi & Teknik Sipil Vol 4, No 2 (2021): OCTOBER
Publisher : Faculty of Engineering, Kadiri University

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (2496.514 KB) | DOI: 10.30737/jurmateks.v4i2.2080

Abstract

The road is an access that connects an area with other areas. With the road, mobility will be easier so that it has an impact on increasing or stabilizing the economy. The Sumberboto-Gunung Gede Blitar road section is one of the access roads to Tambakrejo beach tourism. To improve comfort and safety for road users, it is necessary to improve road quality. This study aims to plan the pavement on the Sumberboto-Gunung Gede Blitar road section. The planning is carried out on the condition of the heavily damaged pavement, with a service life of more than 10 years, the width of the road is 4 meters, the length of the road is 6 kilometers, the type of collector road is class II, and the type of pavement is laston. The planning carried out includes the addition of roads in the hills of Blitar Regency, the data used includes the condition of the sections on the road with calculations referring to the Design Manual Number 02/M/BM/2013 road pavement. The planning results obtained road construction with flexible pavement, with a specification of a surface layer of 10 cm, a layer of 20 cm for the top foundation, 25 cm for the bottom layer of the foundation. From this plan, a total budget of Rp. 13,572,808,084.00 (thirteen billion five hundred seventy-two million eight hundred thousand rupiah) is required. With these results, it can be used as a reference in realizing road construction on the Sumberboto-Gunung Gede Blitar road section.

Page 1 of 2 | Total Record : 15