cover
Contact Name
Aris Fiatno
Contact Email
abi.fiat@gmail.com
Phone
+6282113270340
Journal Mail Official
teknikindustri@universitaspahlawan.ac.id
Editorial Address
Jl. Tuanku Tambusai No. 23 Bangkinang Kampar, Riau » Tel / fax : (0762) 216 77 / (0762) 216 77
Location
Kab. kampar,
Riau
INDONESIA
Jurnal Teknik Industri Terintegrasi (JUTIN)
ISSN : 26208962     EISSN : 26208962     DOI : 10.31004jutin
Jurnal Teknik Industri Terintegrasi merupakan jurnal yang dikelola oleh Program Studi Teknik Industri Fakultas Sains dan Teknologi Universitas Pahlawan Tuanku Tambusai yang menjebatani para peneliti untuk mempublikasikan hasil penelitian di bidang ilmu teknik dan teknik industri mencakup proses manufaktur, kegagalan dan rekayasa material, perawatan berbasis keandalan, keselamatan kerja, perancangan sistem kerja dan ergonomi, pengendalian dan penjaminan mutu, tata letak fasilitas, penelitian operasional, kewirausahaan dan pengembangan bisnis
Arjuna Subject : -
Articles 1,048 Documents
Rancang Bangun Alat Angkut Bahan Baku Guna Meningkatkan Efektivitas Material Handling dengan Pendekatan Ergonomi Hartono, Moh Arief Andri; Purnama, Jaka
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.27927

Abstract

PT Candi Jaya Amerta is a company engaged in the food sector and produces various types of traditional crackers, such as shrimp crackers, fish crackers, and other variations. The process of manually transporting flour raw materials at PT CJA takes a long time so that it can reduce the effectiveness of material handling. In this study, the design of an ergonomic raw material transport tool was carried out with the aim of reducing the level of fatigue in workers and speeding up the process of moving raw materials. the method used is the anthropometric method. the results of collecting anhtropometric data on workers are used to design the tool. the cardiovascular load method is used to measure the level of fatigue of workers based on the pulse rate of workers. the dimensions of the tool have a height of 114cm, width of 80cm, length of 125cm, and tool reach of 88cm. the percentage of worker fatigue is known with % CVL before using the tool design. worker 1 = 72.5%, worker 2 = 61.22% then there is a decrease in fatigue levels after using the tool design to %CVL worker 1 = 43%, worker 2 = 26%.
Rancang Bangun Mesin Penggiling Sambel Pecel dengan Penerapan Antropometri Guna Meningkatkan Efisiensi dan Kepuasan Pengguna (Studi Kasus: UMKM Warung Pecel dan Rujak 46) Krishartanto, Riski; Purnama, Jaka
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.27931

Abstract

The sambel pecel grinding machine is a machine used to smooth the ingredients of sambel pecel. The ingredients for making sambel pecel consist of fried peanuts, brown sugar, red chili, garlic, lime leaves, and other ingredients. All these ingredients will be ground to make sambel pecel. UMKM pecel and rujak coffee shop 58 in the process of grinding sambel pecel still requires services from other places, so that condition causes the production process to be less efficient. The purpose of this research is to make a sambel pecel grinding machine part of the transmission system.The results of the design of the resource and transmission parts of the sambel pecel grinding machine are: the resource used is an AC electric motor with a power of 0.268 Hp and a rotation speed of 2900 rpm, the transmission used is a pulley and a type A V-belt to drive the grinder, the diameter of the drive pulley used is 65 m, the driven pulley is 130 mm, the length of the V-belt circumference is 711 mm, number of belts required 1 piece, and uses a WPA 40 gearbox with a ratio of 1: 20.
Analisis Kelayakan Investasi Usaha Peternakan Ayam Guna Memenuhi Kebutuhan Telur di UD. Hadhita Jaya Makmur Afied, Putra Mahendra; Murnawan, Herry
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.27933

Abstract

Feasibility Analysis of Investing in a Chicken Farming Business to Meet the Need for Eggs which aims to determine the feasibility of a business. In an analysis of the feasibility of establishing a business, it can be carried out through several aspects, namely a monetary perspective, a special perspective, a market perspective using several methods, namely Draft Budget (RAB), Net Present Value (NPV), Net Benefit Ratio (NET B/C ) Internal Rate of Return (IRR), Payback Period (PP) and). This analysis produces data that shows the RAB of the feasibility of UD's business investment. Hadhita Jaya Makmur amounting to Rp. 1,470,669,000, with an NPV of Rp. 347,561,231 IRR is 43%, then the business PP is for 2 years, and the NET B/C is 3. According to the existing analysis regarding feasibility here it can be concluded that investment in the UD.Hadita Jaya Makmur business has met the feasibility of business investment, because has a positive NPV value, higher IRR on funding costs, relatively short PP, and larger NET B/C and is financially profitable for this business.
Rancang Bangun Mesin Pengaduk Pakan Ternak Bebek Melalui Pendekatan Antropometri Guna Mengurangi Waktu Proses Pengadukan di UD. Hadhita Jaya Makmur Permana, Dylan Dias; Murnawan, Hery
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.27934

Abstract

UD. Hadhita Jaya Makmur was established in 1993 and located on Jalan S. Parman, Modopuro Village Rt.03, Rw.07, Mojosari District, Mojokerto Regency. The founder of this company is Mr. Drs.Munasrib, who is known in poultry farming activists, especially ducks. UD. Hadhita Jaya Makmur has ducks with a population of 3000 laying ducks, ducks at UD Hadhita Jaya Makmur produce about 2100 eggs every 2 days in December. UD. Hadhita Jaya Makmur strives to improve the quality of duck eggs by setting a target of feeding ducks as much as 500 kg every day for a population of 3000 ducks that are ready to lay eggs. Nevertheless, the use of manual methods in mixing duck animal feed ingredients has some negative impacts. The process of stirring duck animal feed takes quite a long time, which can reach 40 minute so that workers at UD. Hadhita Jaya Makmur experienced fatigue. One idea to be able to solve the problem is to design an animal feed mixer machine to provide significant results, providing results in accelerating the time of the 500kg per day animal feed stirring process which was originally at UD. Hadhita Jaya Makmur stirred animal feed ingredients in the process still using manual methods with a processing time duration of 43 minutes. After the design of the animal feed mixer machine, the process time of stirring animal feed ingredients to 15 minutes, the magnitude of the reduction in process time also affected the worker productivity index which was originally 19,3% to 55.5%.
Identifikasi Waste Guna Mengefisiensikan Proses Produksi Castable di PT. Benteng Api Technic Gresik Novitasari, Etika Devi; Murnawan, Hery
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.27948

Abstract

PT Benteng Api Technic was founded in 1997 and produces refractory bricks, refractory cement and various refractory materials. Refractory cement or castable currently still uses a pre-order system before the production process is carried out. During observations for seven days with 38 observations, there were activities that were felt to be less efficient, then the value stream mapping method was carried out to streamline waste. The result is a defect when the production process is finished, there is a repetition of the production process because it does not pass the feasibility test, processing because a lot of leftover material falls in the bagging section and the material is no longer used. Waiting is the average part of weighing materials/products of 1.54 seconds (waiting for the material composition recipe and weighing platform trouble/error). Material mixing section with an average/product of 1.82 seconds (waiting for machine repairs due to leaking air duct). Total production lead time is 3396 seconds. Once the waste is identified, the next step is to eliminate the activity by testing data adequacy and testing data uniformity. The results of the analysis of the castable production process contained 2 analyses, the first analysis by reducing activity time with an average total time of 3285 seconds/44 cement and the second analysis by reducing and eliminating the cement weighing activity in the bagging section with a total time of 2873 seconds/44 cement
Karakteristik Penggunaan Limbah Serbuk Kaca pada Campuran Aspal Laston (AC-BC) Terhadap Parameter Marshall Syafi, Ilham Maulana; Hartatik, Nurani; Rizkiardi, Aditya
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.28066

Abstract

The increasing volume of transportation users annually has had an unstable impact on the quality of infrastructure construction, particularly on asphalt roads. Therefore, there is a need for monitoring to effectively and efficiently address damages to asphalt roads. One method of maintenance or repair for asphalt pavement that exceeds the planned lifespan in the Asphalt Concrete Binder Course (AC-BC) layer is through the diversion of common filler materials using the Marshall method. The researcher aims to explore the substitution of common filler materials, one of which involves utilizing waste glass powder to enhance layer stability. The waste glass powder material utilized is sourced from the production remnants of CV Sari Jaya Aluminum, located in Mojokerto. The research aims to investigate the impact of waste glass powder on Marshall parameters AC-BC Laston layer. The optimal and most efficient outcome obtained from the use of waste glass powder filler influence is a filler variation level of 2.5% with a planned asphalt content of 6.0%. All the obtained Marshall characteristic parameter results have met the requirements of the General Specification of Bina Marga (revision 2) Year 2018.  
Upaya Peningkatan Pembuatan Sofa dengan Memperhatikan Value Added dan Value Engineering Arika, Windy; Murnawan, Hery
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.28071

Abstract

There is waste in the production process due to losses such as the raw materials for making sofas being much greater than customer demand, sometimes workers or employees make mistakes in the process of making and repairing sofas which results in low customer satisfaction with the quality of sofa products, and price submissions that make customers doubt the offer. the price, then the owner of the UMKM sofa offers the customer to service the sofa to another UMKM sofa to compare the price whether it is lower or higher. The application of value addition and engineering plans can be in the form of improving the production process, using more efficient raw materials, performing sofa models, and efficient production process times. As a result of the application of value added and value engineering that has been carried out, the results of the budget plan are IDR.6,546,000 for the initial sofa product, the 1 design sofa product results in a budget plan of IDR.6,521,000, the 2 design sofa product results in the budget plan the cost
Design Konseptual Model Pengelolaan Sampah di Kota Padang Rahmayanti, Dina; Meuthia, Yumi; Aqila, Andini
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 3 (2024): July
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i3.28157

Abstract

The increase in waste at the Padang City landfill (TPA) each year is caused by population growth and the imbalance between the amount of waste generated and the waste processing facilities at the source. As a result, inadequately processed waste at waste banks, TPS3R, and TPST ends up in the landfill, where space is increasingly limited. This study uses a Causal Loop Diagram (CLD) to identify and analyze the waste management and disposal system in Padang City and its impact on overall waste management. The conceptual model is created with three CLD submodels: the population submodel, the waste at source submodel, and the waste processing submodel. This study concludes that a more dynamic approach and comprehensive analysis of all aspects of waste management are needed to reduce waste accumulation at the landfill and increase its capacity in the future. The conceptual waste management model developed serves as an initial step in creating a dynamic system that can help solve waste problems effectively and sustainably.
Analisis Faktor Penyebab Keterlambatan Pelaksanaan Proyek Konstruksi pada CV. X Menggunakan Metode FTA Putra, Dwi Meilana; Triana, Masca Indra
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.28181

Abstract

Delays that are not handled immediately can affect the quality of a company's performance. This research was conducted on a construction project undertaken by CV. X. Where 4 construction projects undertaken by CV. X as of January 2024 experienced delays in completion. For this reason, it is necessary to analyze the factors that cause delays in the project by using the FTA (Fault Tree Analysis) method which aims to find fault trees from various errors that will result in the occurrence of unwanted events. Data collection is done by survey using a questionnaire. The results of the questionnaire were then analyzed using the FTA Method and then determining the combination of these factors with a minimum cut set. Based on the results of the analysis using the FTA Method, there are 6 aspects that are factors causing delays, namely aspects of labor; material / equipment aspects; project implementation management aspects; contract aspects; aspects of work documents; aspects of natural conditions and force majors. With the largest probability value, namely the contract aspect of 0.21; project implementation management aspect of 0.18; material / equipment aspect of 0.15; aspects of natural conditions and force majors of 0.12; aspects of work documents of 0.09; aspects of labor of 0.08.
Analisis Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja pada Proyek Pembangunan Perumahan Opra City Gresik Jawa Timur Bagaskara, Jordan Setyo; Triana, Masca Indra
Jurnal Teknik Industri Terintegrasi (JUTIN) Vol. 7 No. 2 (2024): April
Publisher : LPPM Universitas Pahlawan Tuanku Tambusai

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.31004/jutin.v7i2.28204

Abstract

Labor productivity is one of the main elements in determining the success of a construction project. The purpose of this research was to find out what factors influence labor productivity. This research was conducted at the Opra City Gresik Housing Development Project. The method used to find the relationship between productivity and factors that influence productivity is the Productivity Rating method, multiple linear regression analysis method, t test, F test (Anova) and coefficient of determination using statistical software, namely SPSS version 23. There are other analysis methods that are used. used are the validity test, reliability test and normality test used in testing the questionnaire. The level of worker productivity is 81.80%. This can be said to be quite satisfactory, because the Worker Utility Factor is more than 50%. There are seven factors that are most dominant in influencing productivity, namely uncertain weather, lack of material availability, damaged equipment, education level, age, worker motivation and quality of supervision.