cover
Contact Name
Dini Retnowati
Contact Email
journal_iso@umaha.ac.id
Phone
+6281231507642
Journal Mail Official
journal_iso@umaha.ac.id
Editorial Address
Publisher: LPPM Universitas Maarif Hasyim Latif Jl. Ngelom Megare, Taman, Sidoarjo 61257 031-7884034, Fax. 031-7884034 e-mail: journal_iso@umaha.ac.id URL: https://e-journal.umaha.ac.id/index.php/jiso
Location
Kab. sidoarjo,
Jawa timur
INDONESIA
JISO : Journal of Industrial and Systems Optimization
ISSN : 26228971     EISSN : 2622898X     DOI : -
Core Subject : Social, Engineering,
JISO merupakan jurnal ilmiah yang menjadi wadah bagi para peneliti, akademisi dan praktisi untuk mempublikasikan hasil penelitiannya di bidang rekayasa sistem dan industri diterbitkan oleh LPPM Universitas Maarif Hasyim Latif (eISSN 2622-898X) (pISSN 2622-8971). Dengan fokus dan materi tentang Industrial engineering, Supply chain, manajemen kinerja, keselamatan dan kesehatan kerja, Ergonomi,
Articles 12 Documents
Search results for , issue "Vol 6, No 1 (2023): Juni 2023" : 12 Documents clear
ANALISA TOTAL PRODUCTIVE MAINTENANCE MESIN EXTRUDER BERBASIS RISK FACTOR Muhammad Nabil Reza Respati; M. Nushron Ali Mukhtar
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.33-39

Abstract

Teknologi yang di pakai perusahaan semakin maju mengikuti perkembangan zaman, sehingga untuk menjamin kelancaran proses produksi harus selalu memperhatikan pemeliharaan produktivitas. Permasalahan yang terjadi adalah tingginya cost yang di timbulkan karena lamanya waktu downtime pada salah satu mesin, yaitu mesin extruder. Pada penelitian ini mengkaji tentang manajemen perawatan. Metode Overall Equipment Effectiveness (OEE) di gunakan untuk mengukur efisiensi perawatan. Analisis dari resiko operasional selama proses produksi menggunakan House Of Risk (HOR). Pengolahan data Overall Equipment Effectiveness dimulai dengan pengukuran tiga komponen yaitu Availability, Performance, dan Rate Of Quality. Dalam kurun waktu satu tahun, di dapatkan rata-rata nilai OEE mesin extruder pada tahun 2022 sebesar 74,04 %. Identifikasi resiko dilakukan pada proses maintenance mesin extruder. Hasil dari pengukuran effectiveness to difficulty ratio memperoleh 3 prioritas mitigasi pada mesin extruder di dapatkan nilai OEE di bawah overall plant efficiency 85%. Atas dasar tersebut, di pilih 6 risk agent dan 5 preventive action yang memberikan feedback paling tinggi pada resiko maintenance. Kerusakan part, kurangnya jadwal perawatan, dan gangguan kelistrikan merupakan Risk agent yang berpengaruh terhadap operasional extruder. Tindakan pencegahan yang bisa dilakukan adalah melaksanakan pengecekan mesin tiap minggu. ABSTRACTThe technology used by the company is increasing by the following times, to ensure a smooth production process had to heed to productivity maintenance. The problem that occurs is the high cost incurred due to the length of downtime on one of the machines, which is the extruder machine. This research examines maintenance management. The Overall Equipment Effectiveness (OEE) method is used to measure maintenance efficiency. Analysis of operational risks during the production process using the House of Risk (HOR). Overall Equipment Effectiveness data processing starts with measuring three components, Availability, Performance, and Rate of Quality. Within one year, the average OEE value of the extruder machine in 2022 was 74.04%. Risk identification is carried out in the extruder machine maintenance process. The results of measuring the effectiveness to difficulty ratio obtained three mitigation priorities on the extruder machine obtained an OEE value below the overall plant efficiency of 85%. On this basis, six risk agents and five preventive actions were selected that produced the highest feedback on maintenance risks. Part damage, lack of scheduled maintenance, and electrical interference are risk agents that affect extruder operations. Preventive action that can be done is to carry out machine checks every week. 
COVER, SUSUNAN REDAKSI, DAFTAR ISI Editor editor
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.%p

Abstract

ANALISA PENGENDALIAN KUALITAS MENGGUNAKAN METODE SIX SIGMA PADA KEMASAN PRODUK X DI PT GF Milly Maria Sahelangi; Lusi Mei Cahya Wulandari
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.1-8

Abstract

Pengendalian kualitas merupakan hal yang penting dan perlu dilakukan oleh perusahaan untuk mengurangi produk yang cacat. Salah satu industri pangan terkenal yang bergerak di bidang makanan ringan biskuit adalah PT GF. Dalam mempertahankan kualitas produk dengan mengidentifikasi penyebab kecacatan produk X di PT GF, maka dapat digunakan metode Six Sigma dengan pendekatan DMAIC (Define Measure Analyze Improve Control). Penelitian ini bertujuan untuk mengendalikan kecacatan pada kemasan produk X. Berdasarkan hasil penelitian ini didapatkan jenis cacat kemasan produk tertinggi dari 10 jenis cacat adalah gaset melipat yaitu sejumlah 300 pcs dengan persentase 60,61%. Faktor penyebab terjadinya kecacatan produk adalah faktor manusia yaitu adanya perbedaan kompetensi setiap operator saat setting baut gaset di mesin packaging. Faktor material disebabkan oleh kualitas bagian terdalam roll alufo kurang bagus. Faktor mesin disebabkan oleh tumpulnya cutter pada mesin packaging. Faktor metode disebabkan oleh metode pengecekan WIP alufo oleh Quality Control (QC) kurang teliti. Usulan perbaikan yang dapat dilakukan adalah mengadakan training rutin untuk operator mesin packaging agar lebih memahami work instruction khususnya mengenai tata cara setting pada mesin packaging serta penataan tray di mesin tray loader. Selain itu, perlu dilakukan pengecekan QC secara teliti dan sesuai dengan tahapan yang tertera pada work instruction. Untuk meminimalisir terjadinya kecacatan maupun error pada mesin packaging, maka diperlukan maintenance secara berkala serta setting ulang agar mesin dapat berjalan dengan lancar.ABSTRACT Quality control is important and needs to be done by companies to reduce defective products. One of the well-known food industries engaged in biscuit snacks is PT GF. In maintaining product quality by identifying the causes of product X defects at PT GF, the Six Sigma method can be used with the DMAIC (Define Measure Analyze Improve Control) approach. This study aims to control defects in the packaging of product X. Based on the results of this study, it was found that the highest type of product packaging defect of the 10 types of defects was folded gaskets, namely 300 pcs with a percentage of 60.61%. Factors causing product defects are factors humans, namely the difference in competence of each operator when setting the gasket bolts on the packaging machine. The material factor is caused by the poor quality of the inner part of the alufo roll. The engine factor is caused by the dullness of the cutter on the packaging machine. The method factor was due to the inaccuracy of the alufo WIP checking method by QC. Proposed improvements that can be made are to conduct routine training for packaging machine operators to better understand work instructions, especially regarding procedures for setting the packaging machine and arranging trays on the tray loader machine. In addition, it is necessary to carry out QC checks carefully and in accordance with the stages stated in the work instructions. To minimize the occurrence of defects and errors on packaging machines, periodic maintenance and resetting are needed so that the machine can run smoothly. Keywords : packaging, defects, six sigma method, DMAIC
PENJADWALAN PERAWATAN MESIN MILLING PIPE DENGAN PENDEKATAN SIMULASI MONTE CARLO PADA PT WPP Moch. Faries Firmansyah; Wiwin Widiasih
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.40-47

Abstract

PT WPP merupakan industri manufaktur yang memproduksi pipa stainlees. Karena keadaan daya saing bisnis saat ini, organisasi harus dapat mempertahankan ketergantungan peralatan manufaktur mereka untuk memastikan kelancaran proses produksi.. PT WPP mengaplikasikan metode preventive maintenance pada perawatan mesin produksinya hanya saja dalam penentuan jadwal belum optimal, hanya berlandaskan patokan dari kegagalan-kegagalan yang terjadi sebelumnya. Dalam mesin produksi pipa stainlees, PT WPP memiliki 3 mesin produksi yaitu mesin slitter, mesin milling pipe, dan mesin polishing. Mesin produksi yang memiliki breakdown tertinggi yaitu mesin milling pipe dengan frekuensi breakdown 444. Berdasarkan analisis pareto didapatkan 8 komponen kritis  dengan downtime tertinggi yaitu abrasive, gearbox, sander, cutter, as cutter, welding, water pump, dan hower. Simulasi monte carlo dapat menguji jadwal perawatan yang optimal. Hasil dari Simulasi didapatkan interval waktu perawatan preventive untuk komponen abrasive 11 hari, komponen gearbox 15 hari, komponen sander 23 hari, komponen cutter 9 hari, komponen as cutter 170 hari, komponen welding 43 hari, komponen water pump 32 hari, dan komponen hower 25 hari. Dengan mengaplikasikan interval waktu optimum dapat meningkatkan keandalan menjadi 35,33% hingga 65,33%.                       ABSTRACT PT WPP is a manufacturing industry that produces stainless steel pipes. Due to the current state of business competitiveness, organizations must be able to maintain dependence on their manufacturing equipment to ensure the smooth running of the production process. PT WPP applies the preventive maintenance method to the maintenance of its production machines but the schedule is not optimal, only based on the benchmark of failures that occur previously. In terms of stainless steel pipe production machines, PT WPP has 3 production machines namely slitter machines, pipe milling machines and polishing machines. The production machine that has the highest breakdown is the pipe milling machine with a breakdown frequency of 444. Based on the Pareto analysis, 8 critical components with the highest downtime are obtained, namely abrasives, gearbox, sander, cutter, axle cutter, welding, water pump, and hower. Monte carlo simulation can test the optimal maintenance schedule. The results of the simulation obtained preventive maintenance time intervals for abrasive components 11 days, gearbox components 15 days, sander components 23 days, cutter components 9 days, axle components cutter 170 days, welding components 43 days, water pump components 32 days, and hower components 25 day. Applying the optimum time interval can increase the reliability to 35.33% to 65.33%.
COVER BELAKANG JUNI 2023 Editor editor
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.%p

Abstract

ANALISIS PERCEPATAN WAKTU PADA PEKERJAAN SIPIL PROYEK PEMBANGUNAN LPG REFRIGERATED DENGAN MENGGUNAKAN METODE CRITICAL PATH METHOD (CPM) DAN TIME COST TRADE OFF (TCTO) Mohammad Shodig Burhanudin; Nuzulia Khoiriyah; Eli Mas’idah
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.9-16

Abstract

Pembangunan LPG Refrigerated yang terletak di tuban, Jawa Timur saat ini sedang dalam proses pembangunan. Pengerjaan proyek direncanakan dalam waktu 399 hari dengan nilai total proyek sebesar Rp. 14.584.800.000. Selama pelaksanaan proyek sering mengalami keterlambatan aktivitas pekerjaan yang menyebabkan durasi waktu penyelesaiannya mengalami kemunduran dari jadwal yang telah ditentukan. Akibatnya terjadi penundaan waktu untuk memulai aktivitas pekerjaan berikutnya. Hal tersebut tidak hanya menambah durasi umur proyek, akan tetapi juga mengakibatkan pembengkakan anggaran biaya. Banyak faktor yang menyebabkan keterlambatan penyelesaian terhadap suatu pekerjaan meliputi penyediaan bahan baku, keadaan alam, letak geografis dan berbagai unsur lainnya. Dengan demikian perlu diadakan analisa untuk mempercepat durasi proyek, dimana pada penelitian ini akan menggunakan metode Critical Path Method (CPM) dan Time Cost Trade Off (TCTO) untuk melakukan percepatan durasi waktu pada aktivitas yang berada dijalur kritis. Hasil Perhitungan dengan metode Time Cost Trade Off didapatkan durasi dan biaya optimal proyek pembangunan LPG Refrigerated yaitu selama 364 hari dengan penambahan 1 jam lembur yang dapat mempercepat proyek hingga 35 hari dari durasi normal yaitu selama 399 hari dengan total tambahan biaya sebesar Rp. 235.580.228.ABSTRACTThe development of a Refrigerated LPG located in Tuban, East Java is currently under construction. Project work is planned within 399 days with a total project value of Rp. 14,584,800,000. During project implementation, work activities often experience delays which cause the duration of the completion time to experience a setback from the predetermined schedule. As a result, there is a time delay to start the next work activity. This not only increases the duration of the life of the project, but also results in an increase in the budget. Many factors cause delays in the completion of a work including the supply of raw materials, natural conditions, geographical location and various other elements. Thus it is necessary to carry out an analysis to accelerate the duration of the project, which in this study will use the Critical Path Method (CPM) and Time Cost Trade Off (TCTO) methods to accelerate the duration of time for activities that are on a critical path. Calculation results using the Time Cost Trade Off method obtained the optimal duration and cost of the Refrigerated LPG development project, namely for 364 days with the addition of 1 hour of overtime which can accelerate the project by up to 35 days from the normal duration, which is 399 days with a total additional cost of Rp. 235,580,228.
HOW TO UTILIZE AUTODESK FUSION 360 THAT REINFORCES PRODUCT REDESIGN SIMULATION? Tri Andi Setiawan; Anda Iviana Juniani; Dhika Adhitya Purnomo; Noorman Rinanto; Habib Ngumar Faruq
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.48-54

Abstract

Dalam industri desain saat ini, konsep desain generatif untuk perancangan dan pengembangan produk semakin berkembang. Ketika sebuah produk telah berada di pasar dalam jangka waktu yang lama, kebutuhan redesain produk menjadi hal yang tak terelakkan. Konsep redesain produk memodifikasi produk yang sudah ada untuk meningkatkan fungsionalitas, kegunaan, atau efisiensi manufaktur. Ini melibatkan perubahan desain produk, material, dan aspek lain untuk mencapai tujuan dan menyelesaikan masalah tertentu. Komunikasi antara desainer dan insinyur saat proses redesain produk muncul melalui perbedaan perangkat lunak. Kesulitan juga terletak pada komunikasi pemikiran desain dan strategi pemesinan. Autodesk Fusion 360 adalah perangkat lunak CAD/CAM dan CAE yang komprehensif. Penelitian ini bertujuan untuk menggunakan Fusion 360 untuk memperkuat simulasi desain ulang produk. Desain ulang produk yang lengkap mencakup beberapa bidang penting, termasuk desain industri, desain mekanik, rendering dan animasi, emulasi dengan dibantu komputer (CAE), dan manufaktur yang terintegrasi (CAM). Fusion 360 menyajikan ikhtisar kolaborasi, mendobrak batasan antara seni dan manufaktur, serta mengkritisi konsep desain dan proses manufaktur. Dengan menggunakan perangkat Fusion 360 untuk simulasi, analisis FEA statis dapat divisualisasikan. Untuk studi kasus, diamati bahwa hasil kekuatan, tegangan berada dalam nilai kekuatan luluh kritis dari masing-masing bahan, dengan kustomisasi massal dalam analisis struktur. Sebagai hasil dari analisis struktural selama tahap desain, penilaian sepeda motor kargo roda tiga dalam hal daya tahan dan ketahanan mekanisnya dapat dilakukan tanpa membahayakan pengguna.ABSTRACT In today's design industries, the concept of generative design for product development is progressively evolving. When a product has been on the market for an extended period of time, redesigning becomes inevitable. Product redesign refers to modify an existing product to improve functionality, usability, or manufacturing efficiency. It involves changing the product's design, materials, and other aspects to address specific goals and problems. The communication between designers and engineers used to go on through different software products, tool commands, and even industry terms. However, the difficulty also lies in communicating design thoughts and machining strategies. Autodesk Fusion 360 is a comprehensive CAD/CAM and CAE software tool. This article proposes to utilize Fusion 360 for reinforcing product redesign simulation. A complete product redesign covers several significant areas, including industrial design, mechanical design, rendering and animation, computer-aided emulation (CAE), and computer-aided manufacturing (CAM). Fusion 360 presents an overview of collaboration, breaks the barriers between art and manufacturing, and blocks between design and processing. Using Fusion 360 user interface for simulation, the static FEA simulation results can be visualized. For the case study, it is observed that the results for stress and global displacement are within the critical yield strength values of the respective material, with mass customization. As a result of structural analysis during the design stage, the assessment of three-wheeled cargo motorcycle in terms of their durability and mechanical resistance is possible without putting the user at risk. Based on the obtained results, the structure strength was compared.
ANALISIS KOMPONEN KRITIS DAN PENJADWALAN PERAWATAN MESIN INJECT MOLDING DENGAN METODE FMEA PADA PT. ANGKADA RAYA Muhammad Rizal Nur Alamsyah; Wiwin Widiasih
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.17-24

Abstract

PT. Angkada Raya perusaahaan manufaktur bidang pengolahan limbah selang PVC, Vinyl, yang beralamatkan dijalan Rangkah II No. 19 Kecamatan Tambaksari Kota Surabaya, perusahaan ini menggunakan 7 mesin inject model lama,  hanya 3 dari 7 yang digunakan untuk mengurangi downtime atau kerusakan secara tiba-tiba  diperlukannya pengecekan berkala, jika mesin  mati tidak bisa digunakan maka akan berdampak pada proses produksi, penelitian dilakukan untuk mengetahui komponen kritis apa saja yang perlu diutamakan menggunakan metode Failure Mode Effect Analysis yaitu (RPN) dengan total nilai sebesar 606, serta usulan waktu interval pengecekan atau pemeliharaan secara berkala yaitu Band heater 71 hari, Mold 113 hari, Screw 111 hari, Cooling 57 hari, CPU 152 hari, Oli 122 Hari dan untuk mengetahui penyebab seringnya terjadi kegagalan digunakan metode Fault Tree Analysis (FTA) ada 2 faktor umum yaitu eksternal dan internal seperti Band Heater Internal masalah dikabel dan eksternal dari bahan baku dan pemasangan kabel kurang tepat, Mold Internal masalah ditemperatur tinggi atau cooling dan eksternal pengecekan tidak teratur, Screw internal masalah pada leher hopper overheat dan eksternal operator tidak melakukan pengecekan secara berkala serta material tercampur minyak, habis, membeku, Cooling internal ada pembekuan dan eksternal kurang pengecekan berkala, CPU internal masalah terlalu panas serta eksternal kurang pemeliharaan berkala.ABSTRACTPT. Angkada Raya, a manufacturing company in the field of PVC, Vinyl hose waste treatment, which is located at Jalan Rangkah II No. 19 Tambaksari District, Surabaya City, this company uses 7 injection machines, only 3 out of 7 are used to reduce downtime or sudden damage. find out what critical components need to be prioritized using the Failure Mode Effect Analysis method, namely (RPN) with a total value of 606, as well as the proposed time interval for periodic checking or maintenance, namely Band heater 71 days, Mold 113 days, Screw 111 days, Cooling 57 days, CPU 152 days, Oil 122 days and to find out the causes of frequent failures, the Fault Tree Analysis (FTA) method is used. There are 2 general factors, namely external and internal, such as Band Heater Internal wiring and external problems from raw materials and improper wiring, Internal Mold problem with high temperature or cooling and external checking is not regular, internal screw is a problem with the neck of the hopper overheat and the external operator does not check regularly and the material is mixed with oil, runs out, freezes, internal cooling has freezing and external lacks periodic checking, internal CPU overheating problem as well as external lack of periodic maintenance.
PEMILIHAN SUPPLIER MATERIAL KAWAT LAS DAN JASA PENGELASAN DENGAN PENDEKATAN ANALYTIC HIERARCPROCESS (AHP) DI PT. PLN (PERSERO) PUSHARLIS UP2W VI SURABAYA Gita Ardila Anggraeni; Herlina Herlina
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.55-61

Abstract

 PT. PLN (Persero) PUSHARLIS UP2W VI Surabaya merupakan perusahaan yang bergerak didalam bidang design dan reverse engineering peralatan ketenagalistrikan. Grinding roll merupakan salah satu produk unggulan di PT. PLN (Persero) PUSHARLIS UP2W VI Surabaya yang menerapkan sistem make to order, akan tetapi produk tersebut selalu di produksi dalam setiap semesternya sehingga penulis menggagas untuk melakukan pemilihan pada supplier material dan jasa. Dengan ada banyak kriteria dari penawaran yang ditawarkan oleh supplier serta ada beberapa orang pengambil keputusan yang memiliki kriteria prioritas sehingga masih dibutuhkan metode yang dapat melakukan perangkingan. Dalam menentukan supplier material dan jasa yang dapat memenuhi preferensi dari semua pengambil keputusan menggunakan metode Analytic Hierarchy Process (AHP) pada pengadaan produk grinding roll untuk mendapatkan peringkat prioritas supplier berdasarkan kriteria. Alternatif berupa ranking atau urutan prioritas yang dapat digunakan sebagai dasar usulan pada produksi grinding roll sehingga dapat menentukan supplier terbaik sesuai dengan yang diharapkan oleh perusahaan. ABSTRACT PT. PLN (Persero) PUSHARLIS UP2W VI Surabaya is a company engaged in the design and reverse engineering of electrical equipment. Grinding rolls are one of the superior products at PT. PLN (Persero) PUSHARLIS UP2W VI Surabaya, which implements a make-to-order system, but these products are always produced every semester, so the author has the idea to select material and service suppliers. There are many criteria from the offers offered by suppliers, and there are several decision makers who have priority criteria, so methods are still needed that can do ranking. In determining material and service suppliers that can meet the preferences of all decision makers using the Analytic Hierarchy Process (AHP) method in the procurement of grinding roll products to get supplier priority rankings based on criteria. An alternative is in the form of a ranking or order of priority, which can be used as a basis for proposals for grinding roll production so that the best supplier can be determined as expected by the company.
PENGUKURAN BEBAN KERJA KARYAWAN FROZEN FOOD MENGGUNAKAN METODE NASA-TLX Gusti Adriansyah; Heksananda Pamungkas Daulay; Sryang T. Sarena; Tito Mau Pelu Benjamin
JISO : Journal of Industrial and Systems Optimization Vol 6, No 1 (2023): Juni 2023
Publisher : Universitas Maarif Hasyim Latif

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.51804/jiso.v6i1.25-32

Abstract

Tujuan penelitian ini adalah mengukur beban kerja karyawan pada lini produksi PT.X di Driyorejo. Terdapat sejumlah karyawan pada masing-masing bagian, yaitu 2 orang pada bagian Penggilingan, 2 orang di bagian Packing, 2 orang di bagian Perebusan, serta 2 orang di bagian Pemotongan Bahan. Pengukuran beban kerja ini menggunakan metode NASA-TLX (National Aeronautics and Space Administration Task Load Index). Dalam metode ini terdapat dua tahap pengukuran, yaitu tahap pembobotan dan tahap pemberian rating. Dalam perhitungan tersebut mengacu pada 6 indikator NASA TLX, yaitu KF, KM, KW, P, TU, serta TF. Hasil dari pengukuran beban kerja mental karyawan menunjukkan bahwa indikator TU (Tingkat Usaha) memiliki nilai yang tertinggi daripada indikator lainnya. Sedangkan indikator TF (Tingkat Frustasi) menjadi yang terendah diantara indikator lainnya. Dan hasil akhir dari perhitungan nilai skor beban kerja mental karyawan PT. X skor NASA-TLX rata-ratanya ialah sebesar 79,25. Artinya untuk nilai ini menurut NASA – TLX termasuk pada kategori beban kerja mental yang berat. Adapun bagian pekerjaan dengan tingkat beban kerja tinggi ada pada bagian Packing dan Penggilingan, tingkat beban kerjanya yaitu sebesar 82,666 di bagian Packing dan 80,666 pada bagian Penggilingan.ABSTRACTThe purpose of this study is to measure the workload of employees on the PT.X DRIYOREJO production line. Each of which is 2 in the Milling section, 2 in the Packing section, 2 in the Boiling section and 2 in the Material Cutting section. Measurements were made using the NASA-TLX (National Aeronautics and Space Administration Task Load Index) method. In this method there are two stages of measurement, namely the weighting stage and the rating stage. The calculation will refer to 6 NASA TLX indicators, namely KF (Physical Demands), KM (Mental Demands), KW (Temporal Demands), P (Performance), TU (Efforts), TF (Frustration). The results of measuring the mental workload of employees show that the TU (Business Level) indicator has the highest value than other indicators. Meanwhile, the TF (Frustration Level) indicator is the lowest among other indicators. And the final result of calculating the mental workload of employees, the average NASA-TLX score is 79.25. This means that the category of mental workload of employees according to the NASA – TLX method is included in the category of heavy mental workload. The work section with a high level of workload is in the Packing and Milling section, the workload level is 82,666 in the Packing section and 80,666 in the Milling section.