cover
Contact Name
Risky Ayu Kristanti
Contact Email
ayukristanti@gmail.com
Phone
+6282153870439
Journal Mail Official
csue@tecnoscientifica.com
Editorial Address
Jalan Asem Baris Raya No 116 Kebon Baru, Tebet, Jakarta Selatan Jakarta 12830, Indonesia
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Civil and Sustainable Urban Engineering
Published by Tecno Scientifica
ISSN : -     EISSN : 28089200     DOI : https://doi.org/10.53623/csue.v1i1
The journal is intended to provide a platform for research communities from different disciplines to disseminate, exchange and communicate all aspects of basic and applied research involving three important divisions of Civil Engineering, Construction Management and Urban Engineering. The journal will focus on the dissemination of knowledge on both theoretical aspects and practical applications. It would be the platform for the diffusion of new and innovative methods, tools, techniques, technologies, and applications in different disciplines. Topics of specific interest include, but not limited to, are: Civil Engineering: Structure Engineering, Dynamics of Structures, Materials, Infrastructure Engineering, Geotechnical Engineering, Water Resources and Hydraulic Engineering. Construction Management: Project Management Planning, Cost Management, Time Management, Contract Administration, Safety Management, CM Professional Practice, construction materials and management, energy efficiency, energy in buildings, Sustainable Infrastructures, Sustainable Design & Construction, Building Information Modeling (BIM), Concrete Technology and Waste Research. Urban Engineering: Urban transportation, smart cities, Transportation planning, Sustainable transportation, active transportation, transport policy and applied soft computing for sustainable transportation.
Articles 85 Documents
High-Damping Rubber Bearing Base-Isolation Performance under Different Seismic Hazard Levels Indra Ariani; Fachriza Noor Abdi; Muhammad Jazir A lkas; Masayu Widiastuti; Budi Haryanto; Heri Sutanto; Triana Sharly P. Arifin; Citra Anggita; Chalsi Mala Sari; Moch. Gaharu D. Devedo; Dharwati P. Sari
Civil and Sustainable Urban Engineering Volume 6 - Issue 2 - 2026
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53623/csue.v6i2.1436

Abstract

Base isolation can reduce seismic forces transmitted to building superstructures, but its effectiveness depends on seismic hazard conditions, bearing properties, and structural response. This study compares the reported seismic responses of a reinforced-concrete hospital building with fixed-base and high-damping rubber bearing (HDRB) configurations under three Indonesian seismic hazard scenarios: Samarinda, Aceh, and Palu. Six analytical cases were evaluated using identical reported building geometries. The assessment considered base shear, floor displacement, interstory drift, and P–Delta stability. The reported base shear decreased from 4,902 to 3,754 kN in Samarinda, from 16,371 to 10,914 kN in Aceh, and from 16,997 to 11,331 kN in Palu, corresponding to reductions of 23.42%, 33.33%, and 33.34%, respectively. The isolated models generally exhibited greater absolute floor displacements than the fixed-base models. However, inconsistencies between the reported floor-displacement and interstory-drift values prevent a definitive assessment of drift compliance. Furthermore, the available information is insufficient to independently verify the HDRB constitutive model or determine story-level P–Delta stability coefficients. Although the results demonstrate reduced base shear across all three HDRB configurations, these reductions alone do not establish full compliance with seismic design codes or ensure the hospital's operational continuity following an earthquake. Further verification of site-specific seismic spectra, bearing properties, isolation displacement capacity, interstory drift, and second-order effects is necessary before the findings can support final engineering design decisions.
Assessment of Construction Waste Management Practices in Klaten, Indonesia Muhammad Rizki Hidayat; Mochammad Solikin; Yenny Nurchasanah
Civil and Sustainable Urban Engineering Volume 6 - Issue 2 - 2026
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53623/csue.v6i2.1439

Abstract

Construction waste management is an essential component of sustainable construction, as ineffective handling of residual materials reduces resource efficiency and increases potential environmental burdens. This study evaluates construction waste management practices across 21 building projects in Klaten Regency, Indonesia, based on stakeholder perceptions of four factors: labor, materials, methods, and management. A quantitative descriptive approach was employed using a structured questionnaire comprising 20 initial indicators assessed on a five-point Likert scale. Following item validity testing, 16 indicators were retained for descriptive analysis. The material factor achieved the highest mean score (3.89; good), whereas labor (2.29), methods (2.54), and management (2.47) were classified as poor. The lowest-scoring indicators were the appointment of personnel specifically responsible for waste management (1.62), the inclusion of waste management provisions in contracts (1.76), arrangements for third-party waste disposal (1.86), and the availability of waste sorting facilities (2.05). These findings indicate that conventional material protection and quality control practices are better established than dedicated waste management responsibilities, on-site waste segregation, and contractual governance mechanisms. Recommended improvements include establishing clear responsibilities for waste management, providing designated waste sorting and temporary storage areas, incorporating measurable waste management requirements into construction contracts, and systematically documenting waste generation, handling, and final disposal destinations. Given the limited sample size and reliance on stakeholder perceptions rather than direct measurements of waste generation and disposal, the findings should be interpreted as exploratory evidence from the surveyed projects rather than generalized estimates for all construction projects in Klaten Regency.
Quantifying the Porosity–Strength Relationship of Porous Paving Blocks Containing Mechanically Processed Waste-Paper Fibre as a Partial Fine-Aggregate Replacement Pengki Suanto; Mulyadi Sugih Dharsono; Nadia Diandra; Rayesa Bimo Pasya; Randhy Ramadhan Jaenudin
Civil and Sustainable Urban Engineering Volume 6 - Issue 2 - 2026
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53623/csue.v6i2.1443

Abstract

Waste paper is a large waste stream, and porous paving materials are increasingly investigated for urban stormwater management. However, quantitative information linking porosity to mechanical performance in porous paving blocks that contain waste-paper fibre remains scarce. This study quantifies how replacing fine aggregate with mechanically processed, chemically untreated waste-paper fibre affects open porosity, water absorption, dry density, compressive strength, and flexural strength, and expresses the porosity–strength relationship with confidence intervals. Paving blocks (200 × 100 × 60 mm; cement-to-sand ratio 1:3; nominal water-to-cement ratio 0.30) were produced with 0, 5, 10, 15, and 20% fibre by bulk volume of the sand replaced. Ten specimens per mixture were tested for each property at 28 days. Data were analysed using analysis of variance, Welch's test, Games–Howell and Tukey comparisons with 95% confidence intervals, effect sizes, linear regression, and Pearson and Spearman correlations. Substitution increased open porosity from 11.99% to 17.87%, reduced dry density by 13–15%, reduced compressive strength from 37.28 MPa to 18.18–25.40 MPa, and reduced flexural strength from 6.25 MPa to 3.25–4.15 MPa. Across the five mixture means, each 1-percentage-point increase in porosity corresponded to 2.78 MPa lower compressive strength (95% CI: 0.13–5.43 MPa; p = 0.045) and 0.43 MPa lower flexural strength (95% CI: −0.91 to +0.05 MPa; p = 0.065). The relationship largely vanished within the waste-paper mixtures alone (r = −0.39 for compressive strength), indicating that porosity is a useful indicator but not the sole determinant of strength; fibre dispersion and material heterogeneity (coefficients of variation of 19–29%) also matter. The 10% mixture (16.20% porosity, 25.40 MPa, 8.30% water absorption) is identified as a screening candidate for light-traffic porous paving, subject to infiltration, durability, and variability-control studies.
Identification and Descriptive Assessment of Construction Delay Risks in A Research Building Project in Central Sulawesi, Indonesia Ananda Sakti Hariasmara; Masca Indra Triana
Civil and Sustainable Urban Engineering Volume 6 - Issue 2 - 2026
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53623/csue.v6i2.1468

Abstract

A research building construction project in Central Sulawesi, Indonesia, recorded actual cumulative progress of 59.005%, compared with planned progress of 68.617%, at week 29 of a 43-week contract, indicating a delay of 9.612 percentage points. This discrepancy highlighted the need for project-specific identification of potential construction delay risks. This study aimed to identify and assess potential factors contributing to construction delays using a descriptive quantitative approach based on a structured questionnaire survey. A total sampling method was employed, involving all 27 project personnel within the defined study population. Twenty-eight potential delay indicators were identified from the existing literature and adapted to the project context. Item validity was assessed using Pearson item–total correlations, which ranged from 0.383 to 0.780, exceeding the adopted critical value of 0.381. The questionnaire demonstrated high internal consistency, with a Cronbach’s alpha coefficient of 0.907. Indicators were screened using a predefined exclusion criterion, whereby indicators receiving negative responses (strongly disagree or disagree) from more than 50% of respondents were excluded. Consequently, eight indicators were excluded, while 20 were retained, comprising six technical, five managerial, five resource-related, and four external indicators. Material quantity discrepancies and delayed material delivery received the highest levels of agreement, at 92.59% and 88.89%, respectively. The findings provide a project-specific framework for identifying potential construction delay risks and supporting subsequent risk prioritization and mitigation strategies. However, the retention of indicators reflects the absence of majority disagreement rather than empirical confirmation of their occurrence or causal effects. As the study was limited to respondent perceptions within a single construction project, the generalizability of the findings remains limited.
Construction Safety Risk Distribution in a Phase 7B Haul Road Project Using the IBPR Method in South Kalimantan, Indonesia Zoevans Mart L. Tobing; Neny Sukmawatie; Yusias Andrie; Ferra Murati; Yossa Yonathan Hutajulu
Civil and Sustainable Urban Engineering Volume 6 - Issue 2 - 2026
Publisher : Tecno Scientifica Publishing

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.53623/csue.v6i2.1473

Abstract

Haul road construction in mining environments involves heavy equipment operations, material transportation, earthworks, and variable ground conditions, all of which may expose workers to occupational safety hazards. This study aimed to assess the distribution of occupational safety risk levels during the Phase 7B haul road construction project at PT Karya Halim Sampoerna, South Kalimantan, Indonesia, using the Identifikasi Bahaya dan Pengendalian Risiko (IBPR; Hazard Identification and Risk Control) method. A descriptive risk assessment approach was employed, integrating qualitative hazard identification with quantitative risk classification. Eight construction activities were evaluated: subgrade compaction, Dynamic Cone Penetrometer (DCP) testing, base course material supply, base course compaction, sub-base layer material supply, sub-base layer compaction, drainage excavation, and safety berm construction. A total of 81 potential risks were identified and classified into three categories: medium (scores of 5–9), high (10–19), and critical (20–25). No risks were classified as low. High-risk cases accounted for the largest proportion (40 cases; 49.4%), followed by critical-risk cases (30; 37.0%) and medium-risk cases (11; 13.6%). Sub-base layer material supply exhibited the highest proportion of critical risks (10 of 14 cases; 71.4%), followed by base course material supply (6 of 9 cases; 66.7%). These findings highlight the need to prioritize safety assessments and risk control measures related to material transportation, equipment manoeuvring, unloading operations, equipment–worker interactions, excavation conditions, and safety berm design. However, the absence of the original individual hazard register, complete risk-scoring matrix, observation schedule, and post-control risk scores limits the independent reproducibility of the assessment. Consequently, the findings should be interpreted as aggregated risk classifications rather than independently verified risk scores. This study provides an activity-specific framework for prioritizing occupational safety interventions and identifies essential documentation requirements for improving the transparency, reproducibility, and validation of future risk assessments.