cover
Contact Name
Rizki Amalia Tri Cahyani
Contact Email
rizkiatcahyani@gmail.com
Phone
+6285233000052
Journal Mail Official
media.teknik.sipil@umm.ac.id
Editorial Address
Jl. Raya Tlogomas 246 Malang, East Java, Indonesia, Postal Code: 65144
Location
Kota malang,
Jawa timur
INDONESIA
Media Teknik Sipil
ISSN : 16933095     EISSN : 25977660     DOI : 10.2229.
Core Subject : Engineering,
Arjuna Subject : -
Articles 16 Documents
Search results for , issue "Vol. 10 No. 2 (2012): Agustus" : 16 Documents clear
PENGARUH PENGEKANGAN GFRP TERHADAP KEKUATAN DAN DAKTILITAS KOLOM BETON BERTULANG PERSEGI AKIBAT BEBAN SIKLIK Karmila Achmad; Agoes SMD; Tavio .
Media Teknik Sipil Vol. 10 No. 2 (2012): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v10i2.1789

Abstract

Karmila Achmad1, Agoes SMD2 & Tavio31Mahasiswa Program Magister Teknik Sipil Struktur Universitas Brawijaya, Malang dan Dosen Politeknik NegeriBalikpapan2 Guru Besar Teknik Sipil Struktur Universitas Brawijaya, Malang3Dosen Teknik Sipil Struktur-FTSP Institut Teknologi Sepuluh Nopember, SurabayaEmail : milabpp@yahoo.co.idABSTRACTThe aim of this research is to get improving of strength and ductility in column specimen giventhe GFRP strengthener (Glass Fiber Reinforced Polymer) toward with original column, by using thecyclic load as the fix representative of quake load. There are two specimens full scale used. Theyare C-1 (original column) and C-1G (column with GFRP strengthener 1 layer). From the researchgot Pmax sequentially is 278,9 kN and 372.4 kN, and dmax is 53.24 mm and 56.78 mm, each for C-1and C-1G. For C-1 column, the concrete gets damage in plastic hinge zone at drift ratio 3.5%indicated by bending of longitudinal steel bar and spalling of cover concrete. The test for C-1G endsin third cycle at drift ratio 5% and gets damage in fracture of GFRP in plastic hinge zone. Thedamage is the changing of resin color the circumferential direction in three spots. They are as longas 10, 11 and 18 cm. Ductility index taken on three positions are plastic hinge zone, column with ahalf high effective and as high as effective column. From the analyze result got ductility index C-1on the three positions are 1.65; 1.70; 1,97 and ductility index C-1G are 1,44; 1,44 and 1,38 each forplastic hinge zone, a half high effective and as high as effective columnKey words : ductility, GFRP, strength, external confinement, cyclic
PENGARUH KOMPETENSI MANAJER PROYEK TERHADAP KEBERHASILAN PROYEK PADA PERUSAHAAN KONTRAKTOR DI KABUPATEN MALANG Khusnul Prianto; Sri Murni Dewi; Alwafi Pujiraharjo
Media Teknik Sipil Vol. 10 No. 2 (2012): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v10i2.1790

Abstract

Khusnul Prianto1, Sri Murni Dewi2 & Alwafi Pujiraharjo31, 2 & 3Fakultas Teknik Jurusan Teknik Sipil Universitas Brawijaya MalangAlamat Korespondensi : Jl. MT. Haryono No 167 Malang, Indonesiaazdotagroup@yahoo.comABSTRACTThis study aims to determine how big a role simultaneously and partially between knowledge,skills and attitude of the project manager to project success, and to know the most dominant factorthat affects the success of a project. This research uses survey research conducted at contractorcompanies in Malang. The population in this study is the management of the contractor as theproject manager supervisor leader contractor (director) or authorized by the company. Primary datawas collected through questionnaires. Secondary data obtained from the literature to form iteratur,journals, and data from agencies with an interest in this study, such as professional associations andrelated agencies.The results of descriptive analysis using respondents’ answers showed knowledge variable,variable skills, attitudes and behavior / work commitment, top management variables on averagehave an important influence to determine the success of the project. Test results using regressionanalysis and test assumptions Multiple Linear Regression analysis shows simultaneously betweenthe variables of knowledge, skills, work commitment and top management significantly influencethe success of the project amounted to 0.831. Partially between the variables of knowledge, skills,work commitment and top management significantly influence the success of the project amountedto 0.286, 0.296, 0.280 and 0.147.Dominant variable affecting the level of success of a project is a skill / expertise.Keywords: Competence, Project Manager, Contracting Company
PENGARUH PENAMBAHAN SERBUK BATA MERAH TERHADAP STABILITAS TANAH LEMPUNG SEBAGAI TANAH DASAR JALAN Moch. Sholeh; Dandung Novianto
Media Teknik Sipil Vol. 10 No. 2 (2012): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v10i2.1791

Abstract

Moch. Sholeh1 & Dandung Novianto21 & 2Fakultas Teknik Jurusan Teknik Sipil Politeknik Negeri MalangABSTRACTClay consists of grains - grains are very small (<0002 mm) and shows the nature - the natureof plasticity and cohesion. Cohesion indicates the fact that part - the part that is attached to eachother, while the plasticity is a trait that allows the form of the material was changed - edit withoutchanging the content or without returning to its original form, and without any cracks or brokens.And clay with high plasticity index has strong support low when used as a basic foundation of thehighway, so the need for soil improvement.From the above problems then this study aims to engineer clay with red brick powder in fourcomparisons. The first native land. Both the original soil mixed with red brick powder 5%. The thirdnative soil mixed with red brick powder 7.5%. The four original soil mixed with red brick powder10%. Each of these sought specific gravity, liquid limit, plastic limit and plasticity index on theoriginal soil, mixing 5%, 7.5% and 10%. From the analysis of data obtained the following conclusion:the original soil, the value amounting to 60.9 Liquid limit, plastic limit values of 42.8 and plasticityindex value of 18.1. The most optimal additional percentage is 7.5%. And Plasticity Index value at7.5% is 20,31.Key words : Red brick powder, Soil Stability, Subgrade and the Road
OPTIMALISASI JUMLAH PRODUKSI TIPE RUMAH PADA PROYEK PENGEMBANG PERUMAHAN DENGAN MENGGUNAKAN METODE SIMPLEK (STUDI KASUS : PT. ARAYA BUMI MEGAH MALANG) Rini Febri Utari; Andi Saiful Amal
Media Teknik Sipil Vol. 10 No. 2 (2012): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v10i2.1792

Abstract

Rini Febri Utari1 & Andi SA21&2Jurusan Teknik Sipil Fakultas Teknik Universitas Muhammadiyah MalangAlamat Korespondensi : Jalan Raya Tlogomas 246 Malang 65144email :rynfu_sheara@yahoo.co.idABSTRACTThe need of housing in Indonesia is estimated annually by an average of 800,000 new housingunits per year, the state saw a lot of developers that have sprung up to provide homes. But thechallenges that are often faced by the housing developers is to formulate the type of house that willbe produced so that it meets the constraints like aspects of the market, the area, production costs,comply with government regulations as well as the maximum profit margin. The purpose of thisstudy is to formulate the composition of the type of house to be built so as to achieve the optimumsolution and maximum profit.Optimization method used is the simplex method. As the object of study is the housing ArayaBumi Megah Malang, especially Cluster GreenWood Golf with a land area of 100.000m2. Type ofhouse that will be built is the type X1 (45/130) with Rp.389.750.000 price per unit, type X2 (54/170)with Rp.505.200.000 price per unit , the type of X3 (61/162) at a price of Rp.514.200.000 per unit,type X4 (65/144) with Rp.550.500.000 price per unit, type X5 (77/162) with Rp.609.500.000 priceper unit, type X6 (96/180) at a price Rp.720.500.000 per unit, the type X7 (141/144) withRp.833.100.000 price per unit, type X8 (161/162) with Rp.918.625.000 price per unit , the type ofX9 (221/200) with Rp.1.148.500.000 price per unit and the type X10 (308/375) at a price per unitRp.1.654.500.000. Function objective of this research is to gain maximum restriction function island area, limits cost of production and the market demand aspect.The analysis showed that the optimum combination type number built is X1=0, X2=0, X3=0,X4=387, X5=0 , X6=99 , X7=95 X8=0 X9=64 X10=0. So that from the ten types offered are only fourtypes produced the type X4 (65/144) of 387 units, type X6 (96/180) by 99 units, the type X7 (141/144) 95 units and the type of X9 (221/200) by 64 units to obtain the maximum profit ofRp.78.483.073.000.Key words : Optimization , Simplex Method , Number of housing types
FAKTOR-FAKTOR PENENTU PENINGKATAN KINERJA PEJABAT PEMBUAT KOMITMEN (PPK) PADA SATKER APBN DAN SKPD PROVINSI KALIMANTAN TIMUR Rizali Rahmawanto; A. Wicaksono; Sugeng P. Budio
Media Teknik Sipil Vol. 10 No. 2 (2012): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v10i2.1793

Abstract

Rizali Rahmawanto1, A. Wicaksono2 & Sugeng P. Budio31,2&3Fakultas Teknik Jurusan Teknik Sipil Universitas Brawijaya MalangAlamat Korespondensi : Jl. MT. Haryono No 167 Malang, IndonesiaABSTRACTThis research aims to find the most dominant factor that determines the Committing Officer(CO) to improve their performance, to determine the performance appraisal field coordinatorCommitting Officer (CO), to know how to improve the performance of the Committing Officer(CO) to achieve targets as per the Contract Performance.Validity test results indicate that all variables are as valid as each item has a value of PearsonCorrelatian amounted to less than 0.05, and the test showed that the value of Cronbach&rsquo;s Alphagreater than 0.6 so variable and item questionnaire is compliant study. Dominant factor test resultsusing factor analysis showed the dominant factor as a determinant of Committing Officer in improvingthe performance seen from the level of satisfaction is the location factor (55.124%), factor equipment(19.034%), the budget factor (15.718%), personnel factor (6.716% ), partner factor (3.408%).While the dominant factor based on the level of interest is the location factor (69.252%), thebudget factor (20.992%), personnel factor (4.426%), equipment factor (3.523%) and the partnerfactor (1.807%).Keywords: Committing Officer (CO), Performance, Factor Dominant
PERILAKU LEKATAN TULANGAN POLOS DAN TULANGAN ULIR PADA STRUKTUR BETON SERAT KAYU Rofikatul Karimah
Media Teknik Sipil Vol. 10 No. 2 (2012): Agustus
Publisher : Department of Civil Engineering, Faculty of Engineering, University of Muhammadiyah Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.22219/jmts.v10i2.1794

Abstract

Rofikatul KarimahFakultas Teknik Jurusan Teknik Sipil Universitas Muhammadiyah MalangAlamat Korespondensi : Jl. Raya Tlogomas 246 Malang 65144, IndonesiaKarimah@umm.ac.idABSTRACTIn addition wood powder residual sawmill.the concrete will cause a change in behaviorjuxtaposition between concrete and reinforcement steel reinforcement material either plain orreinforcement thread.The research this studyFiber is used sawmill waste wood fiber with content0%, 0.5%, 1% and 1.5% of the volume of concrete as a comparison is also made of concretewithout fibers.Specimens used were silinder30 cm x 15 cm were 12 specimens for compressive strengthtesting and 24 specimens for testing strong adhesion. By using reinforcement thread diameter D10mm and 10 mm reinforcment glace.From the research of the study isstudy iscompressive strengthwith a mixture of sawdustdeclineswith the powder in each variation the capability of strong stickbetween reinforcing steel and concreteplain wood fiber and strong adhesion between reinforcment glace stee land concrete screw woodfiber show that the strong ability adhesion reinforcment thread more thanreinforcment glace.Whilemore of fibers in the concrete mix variation, the lower the magnitude of the strong adhesion betweenthe concrete and reinforcement plain tacky.Keywords : Concrete, sawdust, compressive strength ,strong adhesive

Page 2 of 2 | Total Record : 16