cover
Contact Name
Agus Siswanto
Contact Email
mestro@untagcirebon.ac.id
Phone
+6281330945481
Journal Mail Official
mestro@untagcirebon.ac.id
Editorial Address
Jl. Perjuangan No. 17, UNTAG-Cirebon, 45135, Indonesia
Location
Kab. cirebon,
Jawa barat
INDONESIA
Mestro
ISSN : -     EISSN : 26571072     DOI : doi.org/10.47685/mestro
Mestro merupakan jurnal ilmiah dalam bidang ilmu pengetahuan dan teknologi yang diterbitkan oleh Fakultas Teknik Universitas 17 Agustus 1945 Cirebon, dalam satu tahun terbit dua kali terbitan yaitu bulan Juni dan Desember. Jurnal MESTRO mewadahi artikel hasil penelitian dan telaah ilmiah kritis dengan berbagai disiplin ilmu meliputi: Mechanical Engineering, Electrical Engineering, Civil Engineering, Computer Engineering and Manufacturing Engineering.
Articles 74 Documents
Penilaian Kinerja Struktur Dari Penambahan Fungsi Bangunan Studi Kasus: Pembangunan Kantor SPKT Polres Ciamis) Wahyu Sumarno; Moch Rijalulgad Indra Praja; Yanti Defiana
Mestro Vol 4 No 03 (2023): Peran Energi Baru Terbarukan dan Robotik di Era Industri 4.0
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v4i01.391

Abstract

Ciamis sebagai salah satu provinsi di Jawa Barat, dengan memiliki luas wilayah yang luas dan stategis, ciamis selalu bersinergi dengan semua sektor salah satunya dengan Kepolisian Resort Ciamis dalam meningkatkan kualitas sumber daya manusia, meningkatkan ketersediaan infrastruktur wilayah yang mendukung perkembangan wilayah, dan meningkatkan tata kelola pemerintahan yang efektif dan efisien. Salah satunya dengan memanfaatkan kantor SPKT sebelumnya yang memiliki 2 lantai bangunan yang sudah berfungsi menjadi pusat pelayanan terpadu yang optimal, sebagai salah satu langkah yang dapat dilakukan adalah dengan menambahkan fungsi bangunan yang sebelumnya 2 lantai mejadi 4 lantai, maka perlu dilakukan penelitian penilaian kinerja struktur dari penambahan fungsi bangunan tersebut terhadap struktur bangunan awal (eksisiting). Sehingga dapat memanfaatkan kantor SPKT sebelumnya menjadi pusat pelayanan terpadu yang optimal dengan bertambahnya ruangan dalam melayani pelayanan di Polres Ciamis. Evaluasi kinerja struktur pada bangunan SPKT yang dianalisis adalah struktur atap (plat atap) dan struktur lantai 1-4 (plat lantai, balok, dan kolom) yang mengacu pada PPPURG (SKBI-1.3.53.1987), SNI 2847:2013, SNI 1726:2012, dan peraturan lainnya. Serta digunakan program bantu berupa SAP2000. Perencanaan balok dan kolom pada lantai 2-4 dapat digunakan balok B3 200x300 mm, B4 300x300 mm, dan balok B6 200x200 mm, dengan kolom K3 300x300 mm dan kolom K4 300x300 mm. Balok eksisitng B3 dan Kolom eksisting K2 yang digunakan pada lantai 2 TIDAK AMAN digunakan karena tidak dapat menahan beban yang telah ditambahkan sehingga perlu adanya PERKUATAN. Lendutan yang terjadi pada plat lantai dengan tebal 120 mm dan plat atap dengan tebal 100 mm relatif masih aman, plat pada bangunan SPKT Polres Ciamis masih dapat menahan beban diatasnya.
Carburizing Hammer Blacksmith Dengan Arang Cangkang Kerang & Kulit Durian Reza Saeful Amri; Galuh Renggani Willis; M. Fajar Sidiq
Mestro Vol 4 No 03 (2023): Peran Energi Baru Terbarukan dan Robotik di Era Industri 4.0
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v4i01.392

Abstract

Penelitian yang dilakukan bertujuan untuk mengetahui pengaruh penambahan carbon pada proses carburizing terhadap nilai kekerasan dan juga nilai impact baja karbon rendah (ST-37). Perbedaan variasi perbandingan karbon yang telah ditentukan berpengaruh terhadap sifat mekanik spesimen dan hasil akhir yang diperoleh. Metode penelitian ini menggunakan material baja karbon rendah (ST-37) yang akan melalui proses carburizing dengan perbandingan 70% arang cangkang kerang: 30% arang kulit durian, 50% arang cangkang kerang : 50% arang kulit durian, 30% arang cangkang kerang: 70% arang kulit durian. Proses carburizing menggunakan suhu sebesar 900°C dengan waktu penahanan selama 1 jam. Setelah itu, spesimen yang telah melalui proses carburizing akan dilakukan proses quenching dengan menggunakan media air laut. Maka, selanjutnya spesimen akan melalui proses tempering dengan suhu 300°C dengan waktu penahanan selama 30 menit. Hasil yang diperoleh spesimen uji kekerasan dengan nilai tertinggi terdapat pada perbandingan 50% arang cangkang kerang: 50% arang kulit durian dengan nilai kekerasan rata rata 48,33 HRC. Nilai rata - rata uji impact dengan spesimen yang telah melalui proses carburizing adalah perbandingan 70% arangcangkang kerang: 30% arang kulit durian yakni 2,20 Joule/mm2.
Pengaruh Penggunaan Precedence Diagram Method (Pdm) Terhadap Waktu Dan Biaya Pada Proyek Jalan Wahyu Sumarno; Ihsan Sanjaya; Atep Maskur
Mestro Vol 4 No 03 (2023): Peran Energi Baru Terbarukan dan Robotik di Era Industri 4.0
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v4i01.393

Abstract

Pembangunan di Indonesia semakin pesat. Berbagai proyek berskala besar dikerjakan untuk memenuhi kebutuhan masyarakat yang semakin kompleks. Hal tersebut memicu perkembangan industri konstruksi di Indonesia. Pembangunan tersebut salah satu nya peningkatan jalan. Perlu suatu pengelolaan yang serius, mengingat semakin besarnya ukuran proyek dan semakin kompleksnya ketergantungan antara satu bagian pekerjaan dengan pekerjaan yang lain dalam satu proyek untuk mencapai hasil yang diinginkan. Pada proyek peningkatan jalan cibadak-gardu ini direncanakan durasi pengerjaan selesai dalam waktu 150 hari kalender. Berdasarkan dari penjadwalan proyek / time schedule diuraikan ke dalam diagram network untuk menentukan percepatan waktu / durasi pelaksanaan dengan alternatif menambah jam kerja (lembur) kemudian di hitung optimasi biaya yang di hasilkan, terjadi penambahan waktu 16 hari kalender dengan nilai proyek sebesar Rp.14.526.778.000,00. Tujuan dari penelitian ini adalah untuk mengetahui pengendalian waktu dan biaya pekerjaan Peningkatan Jalan Cibadak – Gardu Kecamatan Jatinagara-Kecamatan Kawali Kabupaten Ciamis dengan menggunakan Metode Precedence Diagram Method (PDM), sehingga membantu kontraktor dalam penjadwalan proyek supaya proyek dapat selesai tepat pada waktunya.. Hasil penelitian yang dilakukan dengan penjadwalan proyek Precedence Diagram Method (PDM) dan percepatan durasi dengan crashing didapatkan waktu percepatan proyek selama 18 hari kalender dan nilai optimasi biaya pelaksanaan sebesar Rp. 10.804.638. Sehingga waktu yang dibutuhkan setelah dilakukan penjadwalan dan percepatan menjadi 148 hari kalender atau 2 hari lebih cepat dari existing dengan penambahan jam kerja (lembur).
Analysis of Heat Transfer in the Process of Smelting Plastic Waste in the Form of Paving Blocks Maulani, Irna Sari; Syamsuri, Heris
Mestro: Jurnal Teknik Mesin dan Elektro Vol 5 No 1 (2023): Edisi Juni
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v5i1.398

Abstract

Plastic waste is an inseparable part of human life. People's habit of burning accumulated plastic waste can release heavy metal content in plastic and toxic chemicals such as dioxins which can interfere with the respiratory process. There is another way to reduce plastic waste, namely by melting plastic waste into paving blocks. The process of melting plastic waste is carried out in a melting furnace. The purpose of this study is to analyze the heat transfer that occurs in the smelting furnace. The method used in this research is heat transfer analysis using FEM analysis and heat transfer analysis through experimental studies. The results obtained in the FEM analysis, the heat generated by the smelting furnace ranges from 212-300 ⁰C. While the heat generated in the measurement process is 280 ⁰C. Analysis of heat transfer that occurs in the smelting furnace obtained a figure of 1.95 Watt. The value of the wasted heat from the smelting furnace is 6.77 W. This means that the wasted heat is greater than the heat generated from the smelting furnace, this will result in a waste of energy. To overcome wasted heat, it is recommended to add insulating material to the furnace around smelting.
Model Design of Helical Type Vertical Shaft Wind Turbine with Capacity of 5 W Achdi, Endang; Syahbardia, Syahbardia; Rusdianto, Fadhilah Fahmi
Mestro: Jurnal Teknik Mesin dan Elektro Vol 5 No 1 (2023): Edisi Juni
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v5i1.399

Abstract

A vertical axis wind turbine (VAWT) is a power generator that uses wind power to generate torque. The VAWT can be pointed in any direction, meaning it doesn't need to be pointed into the wind to generate power. Thus, there is potential for large power plants using VAWTs as their size can be significantly increased. However, there are also some drawbacks to the VAWT. VAWT has the characteristics of self-starting. But still, an additional power source is needed to start the turbine rotation until a certain rotation speed is reached or it must operate at high wind speeds. The main objective of our work is to create a 5 W VAWT model (helical type) to optimize self-starting of vertical axis wind turbines. The outline of this report is regarding the design of our VAWT model, which will have self-starting characteristics. To increase the self-starting status, our efforts are to optimize the type, dimensions and material of the turbine blades. We also optimized the rotor dimensions. As a result, a model helical three-blade turbine was built and tested. The blade turbine made of composites has been balanced with the rotor prior to testing. The test uses 2 fans with a speed of 3-5m/s, the test is carried out to obtain wind turbine performance data.
Design Water Turbine as Pump Drive for Irrigating Paddy Fields in the Highlands in the Panjalu Ciamis Region Herdiana, Ade; Riyadi, Slamet
Mestro: Jurnal Teknik Mesin dan Elektro Vol 5 No 1 (2023): Edisi Juni
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v5i1.400

Abstract

In electrical systems, safety is the main factor, but it is often overlooked because it is quite expensive. The current conventional outlet, although it has been standardized by the Indonesian national standard, is a fact in the field that there are still many incidents of electric shock, because the voltage continues to flow through the copper terminals inside the plastic frame protector. This incident can occur because the terminal is plugged into a conducting object such as a fork, spoon, iron rod, or held directly with a finger. For this reason, in this study, a safety system is made that uses the main component of the Relay as an intermediary for DC voltage and AC voltage. Trials carried out 50 times on each socket box resulted in solving the problem by conditioning the plug that had not been plugged into the terminal so that there was no voltage flowing into the outlet, this certainly distinguishes safety from using an ELCB which must have contact with the human body first.
Analysis Energy Losses in the Distribution Network System at PT. PLN (Persero) ULP Indramayu (Case Study of Loh Beneficial Feeders) Soleh, Muhamad; Taryo, Taryo; Kurniawan, Aditya
Mestro: Jurnal Teknik Mesin dan Elektro Vol 5 No 1 (2023): Edisi Juni
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v5i1.401

Abstract

At PT PLN (Persero) Indramayu Customer Service Unit, it was recorded that electrical energy supplied from the substation at PT PLN (Persero) Indramayu Area in 2019 was 347,133,287.9 ​​kWh, while the energy sold was 312,676,929 kWh and the amount of energy losses of 34,456,358.9 kWh.[5] The difference in the amount is due to energy losses or losses. Energy losses are the amount of energy lost in the energy flow process from the substation or distribution substation to the consumer. This is caused by two factors, namely technical and non-technical factors. Technical factors caused by distribution network problems. The study carried out was a study of energy loss on feeders, namely the Lohbene feeder, this name is an aid to the name of the feeder from ULP Indramayu. The object specification data for this study were obtained based on data from ULP Indramayu and the Indramayu Service Unit. After conducting the research, it can be concluded that the technical losses in the Lohben feeder are 1120.94 kW, while the non-technical losses are 189.96 kW. The annual losses in the Lohben feeder are 8,315,678.42 kWh. reduced to 482.69kW, which was previously 875.486kW. After technical improvements, losses decreased to 406.430 kW per month
Optimizing Production of Kwh Legon PLTD PLTD Using Wind Turbine Generator Model B. Ventus 250 KW(Case Study on Karimunjawa Island) Safrizal, Safrizal; Sutikno, Ery; Arifin, Zaenal
Mestro: Jurnal Teknik Mesin dan Elektro Vol 5 No 1 (2023): Edisi Juni
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v5i1.407

Abstract

Electricity supply must be able to reach all users, including those on small islands in Indonesia, one of which is Karimunjawa Island. Starting in 2016 Karimunjawa Island is supplied by 2 units of Legon Bajak Diesel Power Plant (PLTD) with a capacity of 2x2.2 MW. Based on the peak electricity demand on Karimunjawa Island, each month from January 2017 to December 2018 increased by about 3.9% with an hourly peak load of 1,146 kWh. The average consumption of PLTD Legon Bajak every month in 2018 is 194,877 liters / month. The higher the kWh production of a PLTD, the higher the operational costs for fuel. In addition to the high price of fuel, combustion results from PLTD operations also cause air pollution. Based on these problems in this study will analyze the optimization of the kWh Legon Bajak PLTD using a wind turbine generator model b.ventus 250 kW of 3 units with an assumption of 50% of the peak load, because on Karimunjawa Island has a high enough wind energy potential. The average wind speed from 2004 to 2015 in several areas of Karimunjawa Island was 5.7 m / s. In this study will calculate technical analysis and economic analysis. In the technical analysis the wind turbine generator power output is calculated using the weibull method based on wind speed and power curve b.ventus 250 kW while the economic analysis calculates the cost of fuel savings that can be achieved after optimization calculations. Calculation results show wind turbine power output of 990,981 kWh / year. Based on the specific value of fuel consumption (SFC) of 0.432 liters / kWh fuel consumption during 2017 amounted to 1,605,453.9 liters / year while for 2018 it was 2,338,528.1 liters / year. From the 3 wind turbine electricity supply of 2,972,943 kWh / year, it will reduce fuel consumption by 1,284,311.4 liters / year with a saving cost of Rp.15,989,291,338.00. The amount of optimization of the kWh PLTD after the supply of 3 units of b.ventus 250 kW wind turbine model in 2017 was 80% while in 2018 it was 54.9%.
SAVING ELECTRICITY ON NORMAL AND HOT WATER DISPENSERS BY INSULATING THE HEATING TUBE USING GLASS WOOL Achdi, Endang; Soemantri, Herman; Marpudin, Asep
Mestro: Jurnal Teknik Mesin dan Elektro Vol 5 No 02 (2023): Edisi Desember
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v5i02.464

Abstract

Efforts to apply science and technology are very important, namely improving the welfare of the wide community. The water dispenser is a household electronic item that many people like because it is practical to use. The water dispenser has a main part, namely a heating tube which functions as a heater and a container for storing hot water. This heating tube has an electric heating element of around 400 - 500 W. In the water dispenser, the heating tube is open to the air, resulting in heat loss. Because the source of heating energy comes from electrical energy, saving efforts need to be made. In this research, modification efforts were made, namely by covering the surface of the heating tube using a heat insulating material, namely glass wool. The next step is testing the dispenser before and after modification. The test includes observing the duration of time required from normal water temperature to hot water temperature and from the heater not turning on until it turns on again. Analysis of the test results data is then carried out to obtain the performance of the water dispenser. Based on the results of the analysis, electricity consumption for one water dispenser unit after modification was 11.7 kWh/month and before modification 36.8 kWh/month. Thus, modifying the water dispenser by covering the surface of the heating tube with glass wool can reduce electricity consumption by around 25 kWh/month.
Performance Testing of DHT11 and DS18B20 Sensors as Server Room Temperature Sensors Baehaqi, Mudofar; Rosyid, Abdul; Siswanto, Agus; Subiyanta, Erfan
Mestro: Jurnal Teknik Mesin dan Elektro Vol 5 No 02 (2023): Edisi Desember
Publisher : Fakultas Teknik Universitas 17 Agustus 1945 Cirebon

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.47685/mestro.v5i02.466

Abstract

Temperature is important parameter in many technological and scientific applications. Accurate temperature measurement is needed to monitor and control various processes, including in industry, agriculture, and in other system settings. There are several temperature sensors that can be used in measuring and monitoring microcontroller-based temperatures, for example DS18B20, DHT11, DHT22, LM35, SHT40, each of these sensors has advantages and disadvantages. In this study, we will discuss testing of two types of sensors, namely DHT11 and DS18B20. The performance of the two sensors will be tested, value of accuracy and the level of error in reading compared to tools commonly used in measuring temperature in the server room. The method used in this study is an experimental approach to compare the performance of the DHT11 and DS18B20 temperature sensors. The experimental approach allows us to perform tests and measurements directly on both sensors to obtain objective and accurate data. From the results of testing the temperature in the server room using the DHT11, DS18B20 sensors and compared with the Fluke 179 True-RMS Digital Multimeter, 10 trials were carried out, showing an average error value of 3.37 for the DHT11 sensor and 1.17 for the DS18B20 sensor. for the accuracy value of 96.63% for the DHT11 sensor and 98.83 for the DS18B20 sensor.