cover
Contact Name
Muhammad Fahmi Hakim
Contact Email
fahmi@polinema.ac.id
Phone
+62341-440424
Journal Mail Official
elposys@polinema.ac.id
Editorial Address
UPT-P2M Politeknik Negeri Malang Gedung Graha Polinema Jalan Soekarno - Hatta No. 9 Malang, 65141
Location
Kota malang,
Jawa timur
INDONESIA
ELPOSYS: Jurnal Sistem Kelistrikan
ISSN : 2407232X     EISSN : 24072338     DOI : https://doi.org/10.33795
ELPOSYS adalah jurnal nasional yang menyediakan sumber informasi ilmiah bagi peneliti dan akademisi, lembaga penelitian, lembaga pemerintah, dan industri. Kami menerbitkan research papers, review articles, dan case studies yang berfokus pada bidang ketenagalistrikan serta topik yang terkait. Semua makalah di-review oleh setidaknya dua reviewer. ELPOSYS diterbitkan oleh UPT – P2M Politeknik Negeri Malang dan diterbitkan tiga kali setiap tahun, yaitu Bulan Februari, Juni, dan Oktober. Artikel yang dipublikasikan bidang ilmunya sesuai atau relevan dengan topik-topik Jurnal ELPOSYS yang meliputi bidang (namun tidak terbatas pada): - Pembangkit, - Distribusi dan Transmisi Daya, -Konversi Daya, - Sistem Proteksi, - Transformator, - Teknologi Instalasi Listrik, - Kualitas Daya, - Aplikasi Teknologi Informasi pada Sistem Daya, - Aplikasi Kontrol Cerdas pada Sistem Daya, - Teknologi Pembangkitan berbasis Energi Terbarukan, - Mesin-mesin Listrik, - Pemodelan dan Simulasi Sistem Daya, - Elektronika Daya, - Pengukuran Besaran Listrik, - Kestabilan Sistem Daya, - Topik lain yang terkait.
Articles 184 Documents
Analisis Perencanaan Pemasangan Recloser pada Penyulang untuk Meminamilisr Pemadaman Wijaya Kusuma; Ahmad Hermawan; Aulia Nur Rahma; Muhammad Ilham Rifqi
Elposys: Jurnal Sistem Kelistrikan Vol. 8 No. 3 (2021): ELPOSYS vol.8 no.3 (2021)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v8i3.83

Abstract

One of the feeders in PT. PLN (Persero) ULP is the Selecta Feeder. Based on data, the Selecta Feeder experienced 34 disturbances from January 2018 to November 2020, with a feeder load of 164 A, 106 distribution transformers (GTT), and a network length of 62.602 km. The Selecta Feeder is the feeder with the highest load in PT. PLN (Persero) ULP Batu, and the high number of disturbances on the Selecta Feeder will have a significant impact on the revenue of PT. PLN (Persero). There are 7 load break switches (LBS) and 1 recloser installed on the Selecta Feeder. During the period of January 2018 to November 2020, most of the disturbances occurred due to external factors and happened in sections 3 and 4. Therefore, it is necessary to ensure the continuity of electrical energy supply on the Selecta Feeder to anticipate widespread power outages by adding an installed recloser. A recloser is a protective device that can detect excessive current due to short circuits between phases or phase-to-ground faults, where the recloser automatically interrupts and recloses the circuit with an adjustable time delay.
Perencanaan Instalasi Penangkal Petir Pada Bangunan Industri Bengkel Pembuatan Mesin CV. Karya Brawijaya Rohmanita Duanaputri; Ruwah Joto; Sigi Syah Wibowo; Fery Nova Dwi Prasetyo
Elposys: Jurnal Sistem Kelistrikan Vol. 8 No. 3 (2021): ELPOSYS vol.8 no.3 (2021)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v8i3.53

Abstract

In this era, Indonesia's industry is rapidly developing and relies heavily on electrical components, especially in the Agro-Industry Machine Workshop of CV. Karya Brawijaya. CV. Karya Brawijaya is an industry that produces agro-industrial machinery. In the planning of external protection systems, the commonly used methods are conventional lightning rods and electrostatic methods. Therefore, to further examine the situation, observations conducted in the industry revealed the absence of a lightning protection system. Hence, the author aims to plan and compare the two types of lightning protection systems, namely conventional (Franklin) and electrostatic (E.F. Lightning Protection System), in terms of protection, technical aspects, economy, advantages, and disadvantages. The research and observations were conducted in the CV. Karya Brawijaya building area, using data collection techniques such as direct observation, interviews, and literature studies. This process yielded building layout data (height, width, and length) and data on thunderstorm days in 2019 (IKL 243). These data were then used to calculate the parameters for lightning protection system installation planning according to the standards set by SNI 07015-2004 and PUIPP. The results of the conventional method (Franklin) planning, with air terminations using rolling spheres, showed that 9 finials were installed, allowing the building to withstand currents up to 160.06 kA. On the other hand, the electrostatic method (E.F. Lightning Protection System) planning resulted in the installation of 1 finial, enabling the building to withstand currents up to 23.737 kA. If the current exceeds these values, the lightning protection system will capture the lightning strike.
Analisis Audit Energi di Hotel Kota Malang Menggunakan Web-Based Monitoring System Ahmad Hermawan; Rosina Ahda Dini; Chandra Wiharya
Elposys: Jurnal Sistem Kelistrikan Vol. 10 No. 2 (2023): ELPOSYS vol. 10 no. 2 (2023)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v10i2.1219

Abstract

Energy audits are evaluation activities carried out to determine the condition of the energy used in a system. Audits are carried out to provide the efficiency of an electrical system. The first energy audit conducted was the initial energy audit. By using the specifications of the installed electrical system and using monitoring data. Followed by a detailed energy audit, to determine the condition of a more specific electrical system. The data used is measurement/monitoring data, and data calculations are then compared with the provision of the electricity standard. In calculating the intensity of energy consumption in the initial energy audit process, the IKE Fave Hotel results were still by the standards with an IKE value of 213.59 kWh/m2. Meanwhile, based on the results of a detailed energy audit, it was found that the lighting system and cooling system were not up to standard because the lux results for several rooms showed results that were less than the lux standard. Thus, it is necessary to provide recommendations for improvements to the lighting and cooling system. Providing lighting recommendations can use dialux as a calculation comparison. In the lighting system, it is necessary to replace some of the lamp specifications installed because they are far from standard values. This also needs to be done on the cooling system, by replacing the installed air conditioner according to existing calculations. This replacement was carried out to save energy for the continuity of the hospitality industry process at Fave Hotel Malang.
Analisis Kualitas Daya dan Rekomendasi Perbaikan Sistem Kelistrikan di Gedung Perhotelan Ahmad Hermawan; Jamik Apriliasari; Chandra Wiharya
Elposys: Jurnal Sistem Kelistrikan Vol. 10 No. 2 (2023): ELPOSYS vol. 10 no. 2 (2023)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v10i2.1220

Abstract

Fave Hotel is supplied by 2 PLN transformers, with capacities of 250 kVA and 100 kVA. The supply of electrical energy at Fave Hotel is very important because the possibility of disruption is very large in the process of distributing electrical energy. Load variations at Fave Hotel will also affect the electrical system. One of the disturbances that occur in the electric power system is power quality. The research method used is data observation, monitoring, analysis, and simulation using ETAP software. Based on the results of the analysis of various power quality parameters that were measured, the power quality conditions of the fave hotel were not good. A power quality problem has been identified at Fave Hotel, specifically a voltage imbalance occurs at MDP 2 on weekend is 2.64%. In addition, there is also a current imbalance occurs at MDP 1 and 2 during both weekends and weekdays, with the largest current imbalance occurs at MDP 2 on weekdays is 64.15%. To overcome the problem of voltage imbalance and current imbalance, it is recommended to perform load balancing on the system or install compensating equipment such as a voltage compensator.
Analisis Koordinasi Relai Proteksi Transformator I 150/20kV GI Bumicokro Akibat Uprating Daya 50MVA Menjadi 60MVA Anang Dasa Novfowan; Mochammad Mieftah; Heri Sungkowo
Elposys: Jurnal Sistem Kelistrikan Vol. 10 No. 2 (2023): ELPOSYS vol. 10 no. 2 (2023)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v10i2.2521

Abstract

Nowadays, Electricity is a important thing for people. As the load grown at the Bumicokro Substation, transformer I had replaced from 50 MVA to 60MVA. Because of that, the relays protection had to be resetting because of the changes of nominal current. Therefore, the objectives of this research are calculated and simulated the setting of OCR (Over Current Relay), GFR (Ground Fault Relay), SBEF (Stand by Earth Fault), differential and REF (Resistance Earth Fault) relay. ETAPv12.6 software is used to get the relay coordination Outgoing 22kV, Incoming 150kV, OCR (Over Current Relay), GFR (Ground Fault Relay), SBEF (Stand by Earth Fault), differential and REF (Resistance Earth Fault) after the calculation and simulation finished, then the result indicated the appropriate conditions to overcome the distrubance at the transformer according to the protection zone. The result of current setting for Differential relay is 2,88A, Primary REF is 0,5A, Secondary REF is 1,1A, 150kV OCR is 3,5A, and the moment setting is 28A, 22kV OCR 150kV 4,7A, GFR 1,44A, SBEF 1,0A. While, the result of time setting for Differential relay, Primary REF, Secondary REF are instant, for 150kV OCR is 1,06s, 22kV OCR is 1,07s, GFR 1,51s, and SBEF 8,8s.
Audit Energi dan Rekomendasi Penghematan Energi Listrik di Gedung Rumah Sakit Muhammad Fahmi Hakim; Ahmad Hermawan; Fandi Kurniawan; Kumala Mahda Habsari
Elposys: Jurnal Sistem Kelistrikan Vol. 10 No. 2 (2023): ELPOSYS vol. 10 no. 2 (2023)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v10i2.2522

Abstract

The actions for electricity consumption more efficiently is reducing the amount of electricity consumption of renewable and non renewable energy for human living sustainability or we can called energy conservation. Energy audit purposed to the energy utilization evaluation progress, is still infrequently applied in Indonesia, especially in huge building. The analyzing result of A building in the Dr. Radjiman Wediodiningrat Asylum, the first value audit of Energy Use Intensity (EUI) is 21,944 kwh/m2/year it was include the criteria of efficient. This EUI value is below EUI research that was issued by ASEAN-USAID in 1992 and the EUI value average of hospital in Korea, while detailed audit obtained energy value of EUI is 23,213 kWh/m2/year is included to the criteria of efficient. The THDi value in electricity system is IR= 33,2%, IS=24,48%, IT= 34,85% and IN=122,96%, the THDi value is not complied with IEEE 519-2014 permission which is the value is ISC/IL> 1000 has restraint value by 20%. Whereas the THDv value in electricity system is VR-S= 2,04%, VS-T= 2,11%, VT-R= 1,97%, VR-N= 3,83%, VS-N= 3,69%, VT-N= 3,73% and VL-L= 2,04% and VL-N= 3,75%, the value of THDv is complied the permissiod by IEEE 519-2014 with Voltage system of identification by 0,4 kV, therefore the limit value of THDV which permitted is 8%.
Perencanaan Control Valve Pada Head Tank PLTA Tulungagung Menggunakan PLC Hidayat, Mohammad Noor; Nursal, Elan Causa; Ronilaya, Ferdian; Muhammad Fahmi Hakim
Elposys: Jurnal Sistem Kelistrikan Vol. 10 No. 2 (2023): ELPOSYS vol. 10 no. 2 (2023)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v10i2.2676

Abstract

Head Tank of the Tulungagung Hydro Electric Power Plan of PT PJBUP Brantas still has a manual control valve which consists of  a gate valve and a pair of  float valves. There are some problems when the pipe of the float valve is blocked by cediment and debris, it could affect the cooling water system and make damage to the power plant. In this research, there would build a plan of the automatic control valve of the Tulungagung HEPP. PLC Siemens Simatic Step 7 was used as a control base on a SCADA software Wonderware Intouch version 10.0.0. In this modification plan, a pair of float valve changed over solenoid valve and manual gate valve change over motorized valve. For the water level that would be ultrasonic sensor SICK UM 30 as a input for the power meter Omron Procces Meter K3MA-J. The reliability of this modification are excellence and complete for the auto/manual control even for the long distance one. Moreover this modification also has excellence safety.
Analisis Kestabilan Transien Akibat Penambahan Generator di Pabrik Gula Duanaputri, Rohmanita; Muhammad Fahmi Hakim; Reyhan Aulia Rachman; Nuha Nadhiroh
Elposys: Jurnal Sistem Kelistrikan Vol. 10 No. 2 (2023): ELPOSYS vol. 10 no. 2 (2023)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v10i2.3064

Abstract

The Assembagoes sugar factory has a production capacity of 3000 TCD and was revitalized in 2015, increasing the capacity to 6000 TCD. With the increase in production capacity, the supply of electrical energy, which had previously only come from one generator unit, was supplemented with one new 13 MW generator unit, increasing the total generation capacity to 23 MW. With this addition, the operation pattern of the electrical system changes, and the problem of system stability becomes one of the primary concerns that must be analyzed with improvements to the Assembaggoes sugar factory's electrical system. The goal of this research is to determine the system's frequency and voltage response when a brief stability disturbance occurs.
Analisis Pengaruh Suhu Dan Partial Shading Terhadap Output Daya PV 100-WP Untuk Sistem Hidroponik Saputra, Masramdhani; Santoso, Asfari Hariz; Gumilang, Binar Surya; Pratama, Tio Chandra Ardhi
Elposys: Jurnal Sistem Kelistrikan Vol. 10 No. 2 (2023): ELPOSYS vol. 10 no. 2 (2023)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v10i2.3066

Abstract

This experiment discusses the effect of the variability of solar radiation due to partial shading and surface temperature of the PV Panel on the output power of 100 Wp solar panels. This study begins by determining the load of the system, i.e. DC pump in the nutrient circulation system of the DFT hydroponic system. From there, we can observe the change in solar panel power output and PV surface temperature change due to partial shade. This survey method actually measures the temperature and intensity of solar radiation  and measures the power output of a solar panel, and the tools used are thermal sensors used to measure the surface temperature of solar panels. Solar power meter. to measure the solar irradiance and use the multimeter to measure the voltage and current, 10A capacity SCC battery, 100Wp capacity solar panel and 65Ah battery. The test will be conducted for 5 days, starting from 09:00 to 15:00 every day. This result shows that temperature increase affects the output power decrease when the solar panel is in normal condition (not half shaded condition). On the other hand, when partial shade conditions increase, the temperature does not affect the decrease in solar panel output power. The greater the intensity of partial shade produced by the solar panel, the lower the output power. However, for short periods of partial shade, the output power produced tends to be more stable than under normal conditions.
Pengembangan Uji Eksperimental Penuaan Dipercepat Sistem Isolasi Kertas Terendam Minyak Transformator Duanaputri, Rohmanita; Prasojo, Rahman Azis; Wiwaha, Sigit Setya; Akbar , Divac Nabiel; Handani, Galuh Prawestri Citra; Andrianto, Arif; Elyasa, Rizki Dias
Elposys: Jurnal Sistem Kelistrikan Vol. 10 No. 3 (2023): ELPOSYS vol. 10 no. 3 (2023)
Publisher : Politeknik Negeri Malang

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.33795/elposys.v10i3.3070

Abstract

A transformer is a static electric device that is used to change the alternating voltage to a higher or lower level and is used to transfer energy from one electric circuit to another without changing the frequency. When the transformer is working, there is a temperature rise in the transformer which affects the degradation of the insulating paper and transformer oil. This accelerated aging tester applies the drying and vacuuming process as well as the arrangement of paper insulation racks to achieve maximum test results. The research method refers to IEC 60216-3 2006 for aging time, IEC TS 62332-1 2014 and IEC TS 62332-1 2011 as a reference for the Development of Accelerated Aging Experimental Test Cells for Transformer Oil-immersed Paper Insulation Systems. After achieving the existing goals, the addition of the drying process resulted in quite good Breakdown Voltage test results, not only that after the addition of vacuum it produced a good oil color according to ASTM D1500 as well as after the presence of paper placement racks the results of good tensile strength testing were proven by a graph which relatively decreased from sample 1 to sample 3.