cover
Contact Name
Muhamad Karnoha Amir
Contact Email
karnohaamir020594@gmai.com
Phone
+6285298238037
Journal Mail Official
karnohaamir020594@gmai.com
Editorial Address
Jl. Kapten Piere Tendean No.109, Baruga, Kec. Baruga, Kota Kendari, Sulawesi Tenggara 93870
Location
Kota kendari,
Sulawesi tenggara
INDONESIA
Mining Science and Technology Journal
ISSN : -     EISSN : 29624339     DOI : -
Mining Science & Technology Journal merupakan jurnal yang diterbitkan oleh Program Studi Teknik Pertambangan Universitas Sulawesi Tenggara yang berfokus pada penelitian mengenai perkembangan sains dan teknologi di bidang rekayasa pertambangan. Mining Science & Technology Journal menjadi sarana publikasi hasil penelitian bagi para akademisi, peneliti dan praktisi di bidang ilmu rekayasa pertambangan. Jurnal teknologi pertambangan diterbitkan Tiga (3) kali dalam satu (1) tahun yaitu pada bulan April, Agustus dan Desember. Ruang Lingkup Kajian Mining Science & Technology Journal yaitu 1. Eksplorasi Pertambangan 2. Lingkungan Pertambangan 3. Ekonomi Mineral dan Batubara 4. Geomekanik/geoteknik Petambangan 5. Pengelolaan dan Pemurnian Mineral dan Batubara 6. Perencanaan Tambang 7. Peledakan Tambang 8. Konstruksi Pertambangan 9. dll.
Articles 7 Documents
Search results for , issue "Vol 3 No 1 (2024): Mining Science and Technology Journal" : 7 Documents clear
Analisis Geometri Peledakan Terhadap Fragmentasi Hasil Peledakan pada PT. Diamond Alfa Propertindo Kecamatan Mawasangka Tengah Kabupaten Buton Tengah Provinsi Sulawesi Tenggara Marina, Marina; Salu, Sahrul Poalahi; Dzakir, La Ode
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.548

Abstract

ABSTRACT PT. Diamond Alfa Propertindo is a company operating in the mining sector located in Gundu-gundu Village, Central Mawasangka District, Central Buton Regency, Southeast Sulawesi Province, with an area of 4,905 Ha. Where the research location is located in Pit Mr. Cheng. Where the results of geometric calculations based on R.L Ash's theory are Burden (B) 2 meters, Spacing (S) 3 meters, Stemming (T) 2 meters, Length of filled column (PC) 4 meters, Depth of blast hole (H) 6 meters, Subdrilling ( J) 0.4 meters, and ladder height (L) 5.6 meters, resulting in production of 6,609.6 bcm/blast. The geometric results in the field are burden 2,9 meters, spacing 2,91 meters, stemming 0,78 meters, depth of blast hole 3,58 meters, Subdrilling is not used in the field so it is called a Quarry floor, Fill column length is 2,8 meters, resulting in a production of 3,099.11 bcm/blast with the amount of Anfo used being 16,32 kg, resulting in an average fragmentation size for 10 blasts of 22,25 cm with rock passing using the Kuz-ram model of 53,51%. Meanwhile, based on the Split Desktop 2.0 software, it produces an average fragmentation size of 22,71 cm with 80% rock escap e.
Rancangan Teknis Penambangan dan Penjadwalan Produksi Jangka Pendek (Short Term Scheduling) pada Penambangan Bijih Nikel PT. Gerbang Multi Sejahtera Aprilia, Aprilia; Rembah, Rina; Nurfasiha, Nurfasiha
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.550

Abstract

Block U8 is one of the front of PT. Gerbang Multi Sejahtera which is still virgin condition with an area 14,5 ha. The aim of this research is to estimate reserves, design mining techniques, and make production cheduling based on the design result. The data needed in this research is drill logs. Data from the result of estimating laterite nikel reserve using the Kriging method using Surpac 6.5.1 software shows that the one tonnage is 1.063.919 tons with an average Ni content of 1,80%. The tier geometry used is in accordance with the company’s geotechnical records, namely a tier height of 5 m, a tier depth of 2 m and a single tier slope of 50o. The width of the haul road on a straight road is 12,63 m dan the width of the haul road on bends is 13,97 m, the road grade used is 12%. The planned mining method is open pit which is divided into 3 sequences and consists of 21 ming pushback with a minr life 21 month. The need for Excavator Doosan DX 200A must-dig tools for the progress of the mine from the 1st moth to the 21st month are constant. 1 unit OB digging tool, 1 unit of Ore digging tool, and 1 unit of mush material Ore. The mean of transportation killed were 3 unit in Pit 1 and Pit 2, while in Pit 3 it was 4 units.
Evaluasi Perhitungan Biaya Operasional Penambangan pada PT Putra Mekongga Sejahtera Kecamatan Pomalaa Kabupaten Kolaka Provinsi Sulawesi Tenggara Mulimin, Muslimin; Rembah, Rina; Hasriyanti, Hasriyanti
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.568

Abstract

ABSTRAKEVALUASI PERHITUNGAN BIAYA OPERASIONAL PENAMBANGAN PADA PT. PUTRA MEKONGGA SEJAHTERA KECAMATAN POMALAA KABUPATEN KOLAKA PROVINSI SULAWESI TENGGARA OLEH:MUSLIMIN170920197(Program Studi Teknik Pertambangan)Wilayah Izin Usaha Pertambangan (WIUP) PT. Putra Mekongga Sejahtera berada pada status Operasi Produksi, sesuai Surat Keputusan Bupati Kolaka Nomor: 155 tahun 2010 dengan luas 388 ha, berlaku selama 10 tahun. Kegiatan penambangan yang dilakukan oleh PT. Putra Mekongga Sejahtera terdiri dari tahapan sebagai berikut: pembukaan lahan, penambangan, pengangkutan bijih nikel dari front tambang sampai stock yard pelabuhan serta kegiatan pengapalan (eksport bijih). Sebelum melaksanakan kegiatan penambangan, perlu dibuat suatu rencana anggaran biaya penambangan. Tujuannya agar dapat memberikan gambaran biaya yang akan dikeluarkan oleh perusahaan untuk kegiatan penambangan. Salah satu biaya kegiatan penambangan yang harus direncanakan adalah biaya operasional penambangan.Berdasarkan pengamatan yang dilakukan di PT. Putra Mekongga Sejahtera maka di dapatkan hasil produktivitas alat Stripping OB yaitu : Untuk melakukan Stripping OB dengan menguunakan alat excavator Komatsu PC 200 dapat diperoleh yaitu : 22.272,48 ton/bulan dan untuk melakukan Ore Getting dengan mengunakan alat excavator Komatsu PC 200 dapat diperoleh yaitu : 18.809,28 ton/bulan Untuk pengamatan yang dilakukan di PT. Putra Mekongga Sejahtera maka, didapatkan hasil biaya operasional stripping OB yaitu, untuk alat Excavator Komatsu menggunakan 1 unit Alat sebesar Rp. 74.874.800/bulan Dan untuk biaya operasional ore getting yaitu, untuk alat Excavator Komatsu menggunakan 1 unit Alat sebesar Rp. 72.427.000/bulanDapat kita simpulkan bahawa produksi pada bulan Juli 2023 melebihi target produksinya. Sedangkan produksi Ore Getting pada bulan agustus 2023 tidak melebihi target produksi setiap bulannyaKata Kunci: Biaya Produksi Dan Biaya Operasional, Cycle Time, Produktivitas
Estimasi Cadangan dan Desain Tambang Nikel Laterit Menggunakan Software Surpac Pada PT. Hikari Jeindo Kabupaten Konawe Utara Sulawesi Tenggara Asliadi, Amril; Rembah, Rina; Nurfasiha, Nurfasiha
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.569

Abstract

Hikari Jeindo is a private company engaged in nickel mining with its head office in the city of Kendari, Southeast Sulawesi and a mining location in the Langgikima sub-district. North Konawe Regency. This research was carried out in block 4 with a block area of ​​48 hectares. For the IUP area of ​​PT. Hikari Jeindo has an IUP area of ​​177.70 Ha. In this research, the problem is how to design a laterite nickel deposit pit in the research area using the Inverse Distance Weight (IDW) method and what the volume and tonnage of reserves should be. The aim of this research is to create a pit design for laterite nickel deposits in the research area and to estimate the volume and tonnage of reserves in the research area The research results obtained during the final assignment research at PT. Hikari Jeindo in block 4 where a pit design is carried out which functions to limit the mining block that will be carried out, with a pit opening area of ​​48 Ha. Where the height of the ladder is 5 m, the width of the ladder is 2.5 m and the slope of the ladder is 45%. Estimations were carried out with the help of Surpac 6.3 software by using the method and what was obtained was a volume of 258,593 m3 with a tonnage of 387,890 m3/ton with an average Ni content of 1.82% and Fe 11.18%.
Uji Kekuatan Tekan Beton FC’ 20 MPa Dengan Menggunakan Semen OPC dan Bahan Aditif SP Sikament-ln Jamaludin, Jamaludin; Masgode, Muhammad Buttomi; Hidayat, Arman; Indah, Mutiara
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.596

Abstract

Pembangunan infrastruktur di Indonesia tidak lepas dari penggunaan beton. Pondasi, plat lantai, kolom, bendungan, jalan, dan jembatan adalah semua pekerjaan yang menggunakan beton. Tujuan dari penelitian ini adalah untuk menentukan kekuatan tekan beton dengan mutu rencana Fc 20 Mpa yang menggunakan semen OPC dan aditif Sikament-LN. Pengujian ini menggunakan metode eksperimen di laboratorium PT. PP sesuai dengan standar nasional Indonesia (SNI). 30 sampel, dengan ukuran 150 mm x 300 mm, (27 sampel aditif dan 9 sampel non-aditif), memiliki umur rencana 7, 14 dan 28 hari. Hasil pengujian kuat tekan normal (0%) untuk beton normal adalah 22,08 Mpa pada hari ke-7, 23,97 Mpa pada hari ke-14, dan 25,52 Mpa pada hari ke-28. Nilai kuat tekan beton 0,3% bahan aditif adalah 26,52 Mpa pada 7 hari, 28,79 Mpa pada 14 hari, dan 30,30 Mpa pada 28 hari. Nilai kuat tekan beton 0,8% adalah 15,02 Mpa pada 7 hari, 24,84 Mpa pada 14 hari, dan 27,56 Mpa pada 28 hari. Setelah menambah 1,2% bahan aditif, nilai kuat tekan beton selama 7 hari sebesar 17,34 Mpa, 14 hari sebesar 21,45 Mpa, dan 28 hari sebesar 31,28 Mpa. Dari data ini, dapat disimpulkan bahwa penambahan SP Sikament-LN pada beton dapat meningkatkan nilai kuat tekan bon dari mutu rencana Fc 20 Mpa.
Audit Keselamatan Jalan Pada Daerah Rawan kecelakaan di Ruas Jalan Kolaka – Kolaka Timur Ode, Al Tafakur La; Dirgantara, Arya; Purnama, Haerul; Adnan, Septi; Kamarullah, Kamarullah
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.597

Abstract

Kabupaten Kolaka Utara merupakan salah satu daerah yang berkembang di Sulawesi Tenggara khususnya dalam hal pembangunan infrastruktur dengan pembangunan yang berkembang di beberapa daerah. Di Jalan Poros Kolaka - Kolaka Timur ada beberapa titik yang ditetapkan rawan kecelakaan oleh Satlantas Polres Kolaka bahkan menjadi titik hitam akibat seringnya terjadi kecelakaan. Audit Keselamatan Jalan (RSA) merupakan salah satu cara yang tepat untuk melakukan inspeksi tahap operasional jalan. Penelitian ini dilaksanakan langsung di lapangan dengan menggunakan metode Audit Checklist dari Departemen Pekerjaan Umum tentang Audit Keselamatan Jalan untuk mengetahui kondisi permukaan jalan dan fasilitas jalan (rambu dan marka jalan), serta mengetahui penyebab terjadinya kecelakaan lalu lintas pada jalan raya. Jalan Kolaka - Poros Kolaka Timur, Kabupaten Kolaka. , Kabupaten Kolaka. Hasil penelitian di jalan poros Kolaka - Kolaka Timur, Kecamatan Kolaka, Kabupaten Kolaka, terjadi kerusakan lebih dari satu kali, badan jalan menyempit di beberapa titik, bahu jalan mengalami penurunan dan pada ruas tertentu juga ditemukan rambu-rambu yang seharusnya tidak ada. pernah kesana, dan penyebab kecelakaan banyak terjadi pada ruas jalan Poros Kolaka - Kolaka Timur, tingkat tertinggi adalah faktor manusia sebesar 59,82%, karena kelalaian pengguna atau pengemudi, selain itu juga terdapat faktor kendaraan sebesar 31,12 %, dan faktor kondisi lingkungan fisik sebesar 9,06%. Penyebab kecelakaan sepanjang tahun 2020-2022 poros Kolaka - Kolaka Timur sebanyak 331 kecelakaan dengan jumlah korban 579 orang (meninggal 90 orang, luka berat 31 orang, luka ringan 458 orang), serta kerugian materil sebesar Rp. 1.319.220.000.
Estimasi Cadangan Nikel Laterit Menggunakan Metode Inverse Distance Weight dan Kriging di Blok X pada PT. Tambang Bumi Sulawesi, Kabaena Selatan Kabupaten Bombana, Sulawesi Tenggara Safarudin, La Ode; Syahrul, Syahrul; Kumalasari, Rizky
Mining Science And Technology Journal Vol 3 No 1 (2024): Mining Science and Technology Journal
Publisher : Program Studi Teknik Pertambangan, Fakultas Teknik, Universitas Sulawesi Tenggara

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.54297/minetech-journal.v3i1.601

Abstract

PT Tambang Bumi Sulawesi merupakan perusahaan yang bergerak di bidang pertambangan mineral, yang berada di kecamatan Kabaena Selatan, Kabupaten Bombana, Provinsi Sulawesi Tenggara. Penelitian ini dilakukan pada blok X dengan luas area 10 Ha. Tujuan penelitian ini adalah untuk mengetahui selisih nilai dari cadangan, volume, dan tonnase endapan nikel laterit menggunakan metode Inverse Distance Weight dan metode Kriging. Data yang dibutuhkan dalam penelitian ini adalah data assay, collar, geology dan survey dari 30 titik bor eksplorasi. Hasil estimasi cadangan dengan menggunakan metode Inverse Distance Weight adalah sebesar 590.243 ton dan volume 393.493 m3 , dengan kadar 1,50%-1,60% atau low grade ore 129.526 ton, kadar 1,61%-1,80% atau medium grade ore sebesar 159.338 ton, kadar > 1,80% atau high grade ore sebesar 301.379 ton sedangkan hasil estimasi cadangan menggunakan metode Kriging sebesar 510.978 ton dan volume 340.650 m3 , dengan kadar 1,50%-1,60% atau low grade ore sebesar 108.750 ton, kadar 1,61%-1,80% atau medium grade ore sebesar 137.138 ton dan kadar > 1,80% atau high grade ore sebesar 265.090 ton. Berdasarkan hasil Estimasi cadangan terdapat perbedaan selisih cadangan antara metode Inverse Distance Weight dan metode Kriging adalah untuk cadangan kadar 1,50%-1,60% atau low grade ore sebesar 20.776 ton, kadar 1,61%-1,80% atau medium grade ore sebesar 22.200 ton, dan kadar > 1,80% atau high grade ore sebesar 36.290 ton.

Page 1 of 1 | Total Record : 7