cover
Contact Name
Juliana Fisaini
Contact Email
j.fisaini@usk.ac.id
Phone
+6281377412304
Journal Mail Official
jurnaltekniksipil@usk.ac.id
Editorial Address
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala Jl. Syech Abdurrauf No. 7 Darussalam, Banda Aceh 23111
Location
Kab. aceh besar,
Aceh
INDONESIA
Jurnal Teknik Sipil
ISSN : 20889321     EISSN : 25025295     DOI : http://dx.doi.org/10.24815/jts.v12i2.30788
Core Subject : Engineering,
Jurnal Teknik Sipil (Journal of Civil Engineering) Universitas Syiah Kuala is a scientific journal, published by Civil Engineering Department, Faculty of Engineering, Universitas Syiah Kuala. It is aimed at disseminating research results related to civil engineering fields, where readers of the journal are expected from civil engineering researchers/scientists, students in related fields, engineers, and practitioners in this field. Jurnal Teknik Sipil (Journal of Civil Engineering) Universitas Syiah Kuala publishes the scientific articles in area of civil engineering, as follows. Structural Engineering, Water Resources Engineering, Transportation Engineering, Geotechnical Engineering, Construction Engineering & Management, Urban Planning Geospatial and Geomatics Engineering, and Ocean Engineering
Articles 5 Documents
Search results for , issue "Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018" : 5 Documents clear
ESTIMASI BIAYA PROYEK KONSTRUKSI GEDUNG OLEH QUANTITY SURVEYOR (STUDI KASUS: PEKERJAAN STRUKTUR ATAS PROYEK APARTEMENT THE ACCENT JAKARTA) Ariani, Vivi; Peli, Martalius; Fitri, Dinni Fadhilah
JURNAL TEKNIK SIPIL Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v7i2.10078

Abstract

Abstract : Cost Estimating of the upper structure on each construction project is usually done by the civil engineer or architect. However, as the development of science, new professions such as Quantity Surveyor have shifted the task of civil engineering or architects in making cost estimates. The QS profession is a profession that has the ability to analyze the cost and practical components of theproject's physical construction work in a successful way so as to apply its analytical results in solving the problems typical for each project. The case study of this research is the top structural work on the accent Apartments built on an area of 3,300 m2 with a building area of 27,000 m2. Research methodology by literature study and The Accent volume calculation using standard measurement method (SMM), while for unit price partly taken from the reference of PU Permen 2007. From the analysis of volume calculation and unit price analysis, the total cost of the structural work top of Rp. 51,162,851,482.23 with the price per m2 is 2.084,412.47 / m2. Duration of implementation is for 16 months. For cash flow, cash in consists of a 10% down payment, 5% retention, monthly employment progress minus downpayment and retention, and an office cash loan of Rp.6,000,000,000.00 in which the cash is Rp.2,000,000,000.00 per month.Keywords : cost estimating, quantity surveyor, volume, upper structure, ApartementAbstrak: Estimasi biaya pekerjaan struktur atas pada setiap proyek konstruksi biasanya dilakukan oleh civil engineer atau arsitek. Namun, seiring berkembangnya ilmu pengetahuan, profesi baru seperti Quantity Surveyor telah menggeser tugas civil engineering atau arsitek dalam melakukan estimasi biaya. Studi kasus penelitian ini adalah pekerjaan struktur atas pada Apartemen The Accent yang dibangun pada lahan seluas 3.300 m2 dengan luas bangunan 27.000 m2. Metodologi penelitian dilakukan dengan cara studi literatur dan melakukan perhitungan volume menggunakan standar measurement method (SMM), sedangkan untuk harga satuannya sebagian diambil dari acuan Permen PU 45/PRT/M/2007. Dari hasil analisa perhitungan didapat total biaya keseluruhan pekerjaan struktur atas sebesar Rp. 51,162,851,482.23 dengan harga per m2 nya adalah 2,084,412.47/m2. Durasi pelaksanaan adalah selama 16 bulan. Untuk cash flow, cash in terdiri atas uang muka sebesar 10%, retensi sebesar 5%, progress pekerjaan bulanan dikurangi uang muka dan retensi, dan peminjaman kas kantor sebanyak Rp.6,000,000,000.00 yang mana cairnya dana adalah sebesar Rp.2,000,000,000.00 per bulannya.Kata kunci : Estimasi biaya, Quantity Surveyor, Volume, Struktur atas, Apartemen
ANALISIS PERBANDINGAN BIAYA, WAKTU, MATERIAL, DAN TATA LAKSANA PEKERJAAN DINDING MENGGUNAKAN BATA RINGAN, SANDWICH PANEL DAN BETON PRECAST PADA PROYEK PEMBANGUNAN RUMAH SAKIT STC DI KOTA JAKARTA Hidayat, Felix
JURNAL TEKNIK SIPIL Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v7i2.11221

Abstract

Abstract : Hospital deveploment project STC in Jakarta City got delays on the structure work. As the contractor, they shouldconsiderthe next step for accelerate the projects completion time. Replacing materials used in wall work is one of the alternative that can be done by the contractor. There are three alternative material: light brick, sandwich panel, and precast concrete. The choice of three options determined by consider the analysis of cost, time, material, and work procedure required for each material application. The analysis begins by studying literature of work procedure of each material and knowing the situation in the field. The wall area requirement is 10560.76 m2. The budget plan of light brick wall, sandwich panel wall, and precast wallhave a ratio for1: 1.54: 1.07. The time duration of making light brick wall, sandwich panel wall, and precast wall have a ratio for 3.59 : 1.84 : 1. On procedure aspect, precast wall is the most effective procedure to applied on this project. After compairing all the variables, the most suitable material for substitute material is precast wall.Keywords : delays, wall, light brick, sandwich panel, precast concrete, budget, time, procedureAbstrak : Proyek pembangunan Rumah Sakit STC di Kota Jakarta mengalami keterlambatan pada saat pekerjaan struktur sehingga pihak kontraktor harus menentukan strategi yang harus dipakai guna mempercepat penyelesaian dari proyek tersebut. Penggantian material yang digunakan pada pekerjaan dinding merupakan salah satu alternatif yang bisa dilakukan oleh pihak kontraktor. Ada tiga pilihan material yaitu bata ringan, sandwich panel, dan beton precast. Pilihan dari ketiga material ditentukan dengan mempertimbangkan analisis material, tata laksana, biaya, dan waktu yang dibutuhkan pada pemasangan tiap materialnya. Analisis yang dilakukan dimulai dengan mempelajari literatur tata laksana setiap material serta mengetahui keadaan di lapangan. Luas total butuh dinding yaitu sebesar 10.560,476 m2. Rancangan anggaran biaya (RAB) yang dibutuhkan dinding bata ringan, dinding sandwich panel, dan dinding beton precast memiliki perbandingan 1 : 1,54 : 1,07. Durasi yang dibutuhkan untuk pekerjaan dari pembuatan dinding bata ringan, dinding sandwich panel dan dinding beton precast memiliki perbandingan 3,59 : 1,84 : 1. Dari segi tata laksana, dinding beton precast memiliki SOP yang paling efektif untuk diterapkan dalam proyek ini. Dari semua variabel yang dibandingkan, material yang cocok untuk menjadi pengganti material dinding pada proyek ini yaitu dinding beton precast.Kata kunci : keterlambatan, dinding, bata ringan, sandwich panel, beton precast, tata laksana, biaya, waktu, material
ANALISIS VS30 LOKASI KECAMATAN SYIAH KUALA DALAM UPAYA MITIGASI BENCANA GEMPA BUMI KOTA BANDA ACEH Jamaluddin, Khaizal; Iqbal, Farzian; Rusydy, Ibnu; Chairullah, Banta
JURNAL TEKNIK SIPIL Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v7i2.12351

Abstract

Abstract : Banda Aceh is located at the geological segment vulnerable to earthquake. However as the capital of the Aceh province should be a serious concern in order to minimize the impact of the devastating earthquake. Therefore, the assessment of soil layer amplification using shear wave velocity values is done as one of the disaster mitigation efforts. Shallow seismic testing to get the parameters of shear wave by using MASW method. The results showed that Syiah Kuala subdistrict is divided into two zones of soil layers. The results of analysis Vs30 showed that Syiah Kuala subdistrict is divided into medium density and soft layers of soil characteristics.Keywords : earthquake, amplification, seismic and shear wave.Abstrak: Kota Banda Aceh terletak pada segmen geologi yang rentan gempa bumi. Bagaimanapun Banda Aceh sebagai pusat kota Provinsi Aceh semestinya menjadi perhatian serius dalam rangka meminimalisir dampak dari bencana gempa bumi. Oleh karena itu, asesmen karateristik amplifikasi lapisan tanah dengan menggunakan nilai kecepatan gelombang geser dilakukan sebagai salah satu bentuk upaya mitigasi bencana. Penelitian dilakukan di Kecamatan Syiah Kuala, Banda Aceh. Pengujian seismik dangkal untuk mendapatkan parameter gelombang geser dengan mengunakan metode MASW. Hasil analisis Vs30 memperlihatkan bahwa Kecamatan Syiah Kuala terbagi menjadi dua karakteristik lapisan tanah yaitu kepadatan sedang dan lunak.Kata kunci : gempa bumi, amplifikasi, seismik dan gelombang geser.
PENGARUH KENDARAAN BERAT TERHADAP POLUSI SUARA DAN GETARAN DI PITA GETAR Idham, Muhammad
JURNAL TEKNIK SIPIL Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v7i2.8887

Abstract

Abstract: Increasing the number of vehicles and transportation mode on the roads impacted the level of pollution. The fenomena that appear in the last few years in the study areas is using the rumble strips as one of solutions for transport management in order to give shock effect for road users, to be awere of speed of their vehicles, however impacted to noise and vibration on the roads. The research investigated the noise level and vibration of the heavy vehicles, case study in Bengkalis island. The result shows that the faster the heavy vehicles run, the smaller the vibration caused, while the noise level is getting bigger.Keywords : noise, vibration, transport management, polutionAbstrak : Peningkatan jumlah dan jenis kendaraan bermotor di jalan berdampak pada peningkatan tingkat polusi. Fenomena yang muncul dalam beberapa tahun terakhir pada wilayah studi adalah munculnya pita getar sebagai salah satu cara manajemen lalu lintas dengan memberikan efek kejut bagi pengguna kendaraan supaya sadar, akan tetapi hal ini juga berdampak kepada kebisingan dan getaran pada jalan. Pada penelitian ini akan diteliti tentang besaran nilai kebisingan dan getaran yang diakibatkan oleh kendaraan berat dengan studi kasus jalan di Pulau Bengkalis. Adapun hasil dari penelitian ini didapat bahwa semakin tinggi kecepatan kendaraan maka tingkat getaran yang ditimbulkan semakin kecil dan berbanding terbalik dengan kebisingan.Kata kunci : kebisingan, getaran, manajemen transportasi, polusi
ANALISIS GAYA GEMPA PADA BANGUNAN RUMAH TINGGAL DI WILAYAH GEMPA TINGGI Zebua, Alfian Wiranata
JURNAL TEKNIK SIPIL Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v7i2.10126

Abstract

Abstract : Four stories building was used as structure model. Static earthquake loads distribution were determined according to SNI 1726:2012. The effect of dynamic earthquake loads also considered. The result of structural analysis determined using ETABS. It were static shear force 1.082,64 KN and dynamic shear force, Fx = 1.057 KN and Fy = 983,5 KN. Colomn and beam forces were also determined. Support reactions and joint displacements were determined through structural analysis. Mass modal participation has been reached over 90% at mode 5. Story drift was still smaller than the allowable story drift.Keywords : earthquake loads analysis, residential building.Abstrak:Model struktur yang dianalisis yaitu gedung beraturan lantai 4 untuk rumah tinggal. Distribusi beban gempa statik diperoleh sesuai dengan SNI 1726:2012. Pengaruh beban gempa dinamik juga diperhitungkan. Hasil analisis struktur diperoleh antara lain besaran gaya geser statik 1.082,64 KN dan gaya geser dinamik, Fx = 1.057 KN dan Fy = 983,5 KN. Besaran gaya elemen kolom dan balok juga diperoleh. Reaksi tumpuan serta perpindahan titik buhul dapat diketahui dari hasil analisis yang dilakukan. Pada mode 5, partisipasi massa model yang dianalisis sudah mencapai 90%.Simpangan antar lantai yang terjadi pada model struktur tidak melebihi simpangan yang diijinkan.Kata kunci : analisis gaya gempa, bangunan rumah tinggal.

Page 1 of 1 | Total Record : 5


Filter by Year

2018 2018


Filter By Issues
All Issue Vol 14, No 1 (2025): Volume 14 Nomor 1 Mei 2025 Vol 13, No 2 (2024): Volume 13 Nomor 2 November 2024 Vol 13, No 1 (2024): Volume 13 Nomor 1 Mei 2024 Vol 12, No 2 (2023): Volume 12 Nomor 2 November 2023 Vol 12, No 1 (2023): Volume 12 Nomor 1 Mei 2023 Vol 11, No 2 (2022): Volume 11 Nomor 2 November 2022 Vol 11, No 1 (2022): Volume 11 Nomor 1 Mei 2022 Vol 10, No 2 (2021): Volume 10 Nomor 2 November 2021 Vol 10, No 1 (2021): Volume 10 Nomor 1 Mei 2021 Vol 9, No 2 (2020): Volume 9, Nomor 2, November 2020 Vol 9, No 1 (2020): Volume 9 Nomor 1 Mei 2020 Vol 8, No 2 (2019): Volume 8, Nomor 2, November 2019 Vol 8, No 1 (2019): Volume 8, Nomor 1, Mei 2019 Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018 Vol 7, No 1 (2018): Volume 7, Nomor 1, Mei 2018 Vol 1, No 4 (2018): Volume 1 Special Issue, Nomor 4, Februari 2018 Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018 Vol 6, No 3 (2017): Volume 6, Nomor 3, Mei 2017 Vol 6, No 2 (2017): Volume 6, Nomor 2, Januari 2017 Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017 Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017 Vol 6, No 1 (2016): Volume 6, Nomor 1, September 2016 Vol 5, No 3 (2016): Volume 5, Nomor 3, Mei 2016 Vol 5, No 2 (2016): Volume 5, Nomor 2, Januari 2016 Vol 4, No 3 (2015): Volume 4, Nomor 3, Mei 2015 Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014 Vol 3, No 1 (2013): Jurnal Teknik Sipil Volume 3, Nomor 1, September 2013 Vol 2, No 2 (2013): Volume 2, Nomor 2, januari 2013 Vol 2, No 3 (2013) Vol 2, No 1 (2012): Volume 2, Nomor 1, September 2012 Vol 1, No 3 (2012): Volume 1, Nomor 2, Mei 2012 Vol 1, No 2 (2012): Volume 1, Nomor 2, Januari 2012 Vol 1, No 1 (2011): Volume 1, Nomor 1, September 2011 More Issue