cover
Contact Name
Juliana Fisaini
Contact Email
j.fisaini@usk.ac.id
Phone
+6281377412304
Journal Mail Official
jurnaltekniksipil@usk.ac.id
Editorial Address
Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala Jl. Syech Abdurrauf No. 7 Darussalam, Banda Aceh 23111
Location
Kab. aceh besar,
Aceh
INDONESIA
Jurnal Teknik Sipil
ISSN : 20889321     EISSN : 25025295     DOI : http://dx.doi.org/10.24815/jts.v12i2.30788
Core Subject : Engineering,
Jurnal Teknik Sipil (Journal of Civil Engineering) Universitas Syiah Kuala is a scientific journal, published by Civil Engineering Department, Faculty of Engineering, Universitas Syiah Kuala. It is aimed at disseminating research results related to civil engineering fields, where readers of the journal are expected from civil engineering researchers/scientists, students in related fields, engineers, and practitioners in this field. Jurnal Teknik Sipil (Journal of Civil Engineering) Universitas Syiah Kuala publishes the scientific articles in area of civil engineering, as follows. Structural Engineering, Water Resources Engineering, Transportation Engineering, Geotechnical Engineering, Construction Engineering & Management, Urban Planning Geospatial and Geomatics Engineering, and Ocean Engineering
Articles 345 Documents
PENILAIAN TINGKAT RISIKO BENCANA TSUNAMI UNTUK KAWASAN KOTA BANDA ACEH BERDASARKAN SKENARIO TSUNAMI DESEMBER 2004 Fauziah Fauziah; Eldina Fatimah; Syamsidik Syamsidik
JURNAL TEKNIK SIPIL Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Realignment of Banda Aceh devastated by the tsunami has put forward the concept of disaster mitigation. As the city is aware of the disaster, the availability of disaster risk map is an essential requirement in developing sustainable development and disaster mitigation based. This research aims to generate a map of tsunami risk assessment by loading element of threat,  vulnerability, capacity using spatial data and information in the region of Banda Aceh. Risk analysis is conducted using a  semi-quantitative weighting factors and the index values arebased on the analysis conducted by BNPB and TDMRC-Unsyiah. Mapping analysis is conducted by overlaying layer(overlay) and vector-based GIS grid. Based on the results of the analysis show that the risk areas with low-to-high tsunami consists of 73 villages high with an area of each is 6.05 km2 (10%). 20.66 km2 (35%) and 16.23 km2. The area is not an area of 17.02 km2 risk or 28% of the total area of the city of Banda Aceh.
FEASIBILITY STUDY INVESTASI PEMBANGUNAN PERUMAHAN HONCO LINGKE RESIDENCE DI KOTA BANDA ACEH Ivan Widardo; Mochammad Afifuddin; Hafnidar Abd Rani
JURNAL TEKNIK SIPIL Vol 4, No 3 (2015): Volume 4, Nomor 3, Mei 2015
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract : Banda Aceh city is a that became the center of all activities, both government, and education trade so as to make very rapid populayion growth and led to the housing needs. At this point PT. Honco Primatama in palace Banda Aceh will invest to make residential Honco Lingke Residence, located street Cendana in Banda Aceh. The subject matter of issue in thisstudy is to analyze the feasibility of investment Honco Lingke Residence. Review of aspects optimation, market aspects, technical aspects, and financial aspects by a feasibility assessment (Benefit Cost Ratio, Net Present Value, Internal Rate of Return, and Payback Period) the costs in curred. The purpose of this study determine whether development projects. Residential Honco Lingke Residence, deserves to be built by investor who will invest. The benefit of this research will be used PT. Honco Primatama as the developer. As a benchmark for evaluation the construction of residential Honco Lingke residence as well as the evaluation of science in the investment. Investment analysis result be value NPV= Rp. 1.024.870.917,- (NPV 0), IRR= 16,26 %  ( MARR 15 %) dan BCR= 1,08    (BCR 1). The result of this investment indicator viewer  that the investment to be made PT. Honco Primatama to building residentialHonca Lingke Residence at Banda Aceh already worth doing.Keywords : Investment, evaluation, market aspects, technical aspects, financial aspectsAbstrak : Kota Banda Aceh merupakan kota yang menjadi pusat segala aktifitas-aktifitas baik itu pemerintahan, perdagangan dan pendidikan sehingga membuat pertumbuhan penduduk yang sangat cepat dan menyebabkan meningkatnya kebutuhan akan rumah. Pada saat ini PTHonco Primatama yang berkedudukan di Banda Aceh akan menanam modal untuk membuat perumahan Honco Lingke Residence, yang berlokasi di kawasan Jalan Cendana di Banda Aceh. Pokok permasalahan pada penelitian ini adalah menganalisa kelayakan investasi perumahanHonco Lingke Residence ditinjau dari aspek optimal, aspek pasar, aspek teknis serta aspek finansial berdasarkan penilaian kelayakan (Benefit Cost Ratio, Net Present Value, Internal Rate of Return, and Payback Period) terhadap biaya yang telah dikeluarkan. Tujuan penelitian ini adalah untuk mengetahui apakah proyek pembangunan perumahan Honco Lingke Residence layak untuk dibangun oleh  investor yang akan menanamkan modalnya. Manfaat dari penelitian ini dapat dimanfaatkan oleh PT. Honco Primatama selaku pihak pengembang sebagai suatu acuan untuk mengevaluasi pembangunan perumahan Honco Lingke Residence,serta pengembangan ilmu pengetahuan di bidang investasi. Hasil analisa investasi diperoleh nilai NPV= Rp. 1.024.870.917,- (lebih besar dari 0), IRR = 16,26 %  (lebih besar daripada MARR 15 %) dan BCR= 1,08 (lebih dari 1).Dari hasil ketiga indikator investasi ini menunjukkan bahwa investasi yang akan di lakukan oleh PT. Honco Primatama untuk membangunan perumahan Honco Lingke Residence di Kota Banda Acehsudah layak dilakukan.Kata kunci : Investasi, evaluasi, aspek pasar, aspek teknis, aspek finansial
ANALISIS KELAYAKAN EKONOMI PEMBANGUNAN JALAN KRUENG MANE - BUKETRATA DENGAN CONSUMER SURPLUS Amirullah Amirullah; Sofyan M. Saleh; Renni Anggraini
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: The national road in North Aceh District is very buzy, especially roads that pass through the Vital Project of Lhokseumawe and its surrounding areas are now called Special Economic Zones (SEZ) Lhokseumawe. Because it's built the way evasion from Krueng Mane to Buketrata along 32 Km, but this road  is not perfect yet, especially at the STA 14+750 to STA 21+400. The current reasearch aims to determine the value of time and the Vehicle Operating Costs (VOC); and economic feasibility in Benefit Cost Ratio (BCR), Net Present Value (NPV), and Economic Internal Rate of Return (EIRR) aspects. This study uses a productivity method to calculate the value of time, and the Pacific Consultant International method for calculating the VOC; and Bina Marga method was used to determine the economic feasibility in BCR, NPV, and EIRR aspects. The results of this research shown that   daily traffic volume of the annual average (LHRT) on alternative road obtained 9,583 vehicles /day in 2017; the difference in total time value was obtained Rp87,788.- /vehicle and the difference BOK is Rp3,289.- /vehicle; and economic feasibility of the alternative road construction in North Aceh Regency was obtained in 2026. EIRR’s value obtained was at a discount rate of 13.51%, this indicates that the alternative road construction was very feasible to develop with bank lending rates up to 13.51%.Abstract: The national road in North Aceh District is very buzy, especially roads that pass through the Vital Project of Lhokseumawe and its surrounding areas are now called Special Economic Zones (SEZ) Lhokseumawe. Because it's built the way evasion from Krueng Mane to Buketrata along 32 Km, but this road  is not perfect yet, especially at the STA 14+750 to STA 21+400. The current reasearch aims to determine the value of time and the Vehicle Operating Costs (VOC); and economic feasibility in Benefit Cost Ratio (BCR), Net Present Value (NPV), and Economic Internal Rate of Return (EIRR) aspects. This study uses a productivity method to calculate the value of time, and the Pacific Consultant International method for calculating the VOC; and Bina Marga method was used to determine the economic feasibility in BCR, NPV, and EIRR aspects. The results of this research shown that   daily traffic volume of the annual average (LHRT) on alternative road obtained 9,583 vehicles /day in 2017; the difference in total time value was obtained Rp87,788.- /vehicle and the difference BOK is Rp3,289.- /vehicle; and economic feasibility of the alternative road construction in North Aceh Regency was obtained in 2026. EIRR’s value obtained was at a discount rate of 13.51%, this indicates that the alternative road construction was very feasible to develop with bank lending rates up to 13.51%.
Evaluasi Lokasi Rawan Kecelakaan Lalu Lintas Pada Ruas Jalan Nasional Kabupaten Aceh Timur Provinsi Aceh Muksalmina Muksalmina; Renni Anggraini; Cut Mutiawati
JURNAL TEKNIK SIPIL Vol 11, No 1 (2022): Volume 11 Nomor 1 Mei 2022
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v11i1.25186

Abstract

Abstract: Traffic accidents are the third leading cause of death in Indonesia, after heart disease and tuberculosis, according to the World Health Organization (2013). According to the East Aceh Police Traffic Unit, the number of traffic accident cases in the East Aceh region in 2020 was 446, the highest in the previous five years. As a result, the purpose of this study is to investigate the severity of traffic accidents on the black spot locations in National Road, East Aceh Regency. The Safety Index approach was used to determine the severity of the traffic accident. The top three highest safety indexes were reviewed after ranking the six locations of those highest accident cases. Field observations were conducted to determine the current infrastructure conditions at the three black spot locations. The findings showed that in the three accident-prone segment locations, a standard of signs, markings, and road geometric proportions is feasible. Jalan Desa Paya Demam Dua (Sta. 328+550), SI 0.80, Jalan Desa Blang Nie (Sta. 335+000), SI 0.78, and Jalan Desa Gampong Jalan (Sta. 366+420), SI 0.69 are the highways with the highest safety index. Since the SI value is approaching 1, the three roads are classified as risky. The three locations' signage capabilities are still lack, particularly on Jalan Desa Paya Demam Dua. Meanwhile, several road markings remain unfinished, particularly on Jalan Desa Gampong Jalan, which has no road markings. Based on the recommendations from this study, the local government needs to take action immediately so that the number of traffic accidents can be reduced.Keyword: Deficiency, Road Safety, Infrastructure, Safety Index, Volume, Accident Abstrak: Menurut World Health Organization (2013), kecelakaan lalu lintas di Indonesia dinilai menjadi pembunuh terbesar ketiga setelah penyakit jantung koroner dan Tuberculosis. Satlantas Aceh Timur mengungkapkan bahwa jumlah kasus kecelakaan lalu lintas di wilayah Aceh Timur tahun 2020 sebanyak 446 kasus. Kasus tersebut merupakan yang tertinggi selama lima tahun terakhir (2016-2020). Oleh karena itu, penelitian ini bertujuan untuk mengetahui angka safety index kecelakaan di lokasi black spot Jalan Nasional Kabupaten Aceh Timur. Metode yang digunakan untuk mengidentifikasi tingkat keparahan kecelakaan menggunakan metode Safety Indeks. Setelah dilakukan perangkingan pada enam lokasi dengan kasus kecelakaan tertinggi, didapat tiga segmen dengan angka indeks keselamatan tertinggi. Selanjutnya dilakukan observasi lapangan untuk mengidentifikasi kondisi eksisting infrastruktur pada ketiga lokasi black spot tersebut. Hasil yang diperoleh dari penelitian ini merupakan hasil analisis deskriptif yang menunjukkan standar perambuan, marka serta ukuran geometrik jalan pada ketiga lokasi segmen rawan kecelakaan. Urutan jalan yang memiliki safety index tertinggi adalah sebagai berikut: Jalan Desa Paya Demam Dua (Sta. 328+550), SI  0,80, Jalan Desa Blang Nie (Sta. 335+000), SI 0,78, dan Jalan Desa Gampong Jalan (Sta. 366+420), SI 0,69. Ketiga jalan tersebut dikategorikan berbahaya karena nilai SI mendekati angka 1 (Satu). Fasilitas perambuan pada ketiga lokasi belum sepenuhnya lengkap sehingga perlu adanya penambahan terutama pada Jalan Desa paya Demam Dua. Sementara marka jalan juga masih banyak yang belum terpenuhi terutama pada Jalan Desa Gampong Jalan yang sama sekali tidak memiliki marka pembatas jalan. Berdasarkan rekomendasi yang diberikan pemerintah setempat perlu melakukan perbaikan sehingga angka kecelakaan lalu lintas dapat berkurang.Kata kunci : Defisiensi, Keselamatan Jalan, Infrastruktur, Indeks keselamatan, Volume, Kecelakaan
KAJIAN AKIBAT VARIATION ORDER PADA TAHAP PELAKSANAAN PROYEK KONSTRUKSI DI PROVINSI ACEH Ibnu Abas Majid; Nurul Malahayati
JURNAL TEKNIK SIPIL Vol 2, No 2 (2013): Volume 2, Nomor 2, januari 2013
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: In any construction project there are often a changes or commonly referred to as variation orders. These changes vary from a change related to the drawings or specifications changes that may affect the scope of work of the project. Often the issues on variation orders at a construction projects may affect the implementation of the project performance and the performance of the contractor in carrying out the project. This study aimed to identify the factors arising from variation order on the implementation phase of a construction projects. Primary data collection is used to obtain data and to identify the characteristics factors respondent to variation orders by distributing questionnaires to 95 respondents consisting of owners, contractors, and consultants who manage a construction project in the province of Aceh from the period 2009-2010 in the department of Public Works (Bina Marga and Cipta Karya). Data processing is conducted by using a statistical method which consists of reliability analysis, frequency analysis, analysis of the Relative Importance Index and Spearman rank correlation analysis and computational tools utilizing the SPSS software version 16.0 and Microsoft Excel 2007. Based on the research results it obtained top 5 factors that occurred to the addition of the variation order. These factors are the  time, schedule delay completion, increase costs, claims and disputes as well as late payment of contractors..Keywords : variation order, project constructionAbstrak: Dalam setiap proyek konstruksi sering terjadi perubahan atau yang biasa disebut dengan variation order. Perubahan ini bervariasi dari adanya suatu perubahan yang berkaitan dengan gambar atau spesifikasi hingga perubahan yang dapat mempengaruhi lingkup pekerjaan dari suatu proyek.  Sering terjadinya masalah variation order pada pelaksanaan proyek konstruksi dapat mempengaruhi kinerja proyek dan kinerja kontraktor dalam melaksanakan proyek.  Penelitian ini bertujuan untuk mengidentifikasikan faktor-faktor yang timbul akibat terjadinya variation order  pada tahap pelaksanaan proyek konstruksi. Pengumpulan data primer untuk mendapatkan data karakteristik responden dan identifikasi faktor akibat terjadinya variation order menggunakan penyebaran kuisioner kepada 95 responden yang terdiri dari owner, kontraktor, dan konsultan yang pernah mengelola proyek konstruksi di Provinsi Aceh pada kurun waktu tahun 2009-2010 pada dinas Bina Marga dan Cipta Karya.  Pengolahan data dilakukan dengan menggunakan metode statistik yang terdiri dari analisis reliabilitas, analisis frekuensi, analisis Relative Importance Index dan analisis korelasi rank spearman serta memanfaatkan alat bantu komputasi yaitu software SPSS Versi 16.0 dan Microsoft Excel 2007. Berdasarkan hasil penelitian diperoleh 5 faktor teratas akibat yang terjadinya variation order yaitu penambahan waktu, tertundanya jadwal penyelesaian, penambahan biaya,  klaim,  dan perselisihan serta keterlambatan pembayaran kontraktor.Kata kunci : variasi order, akibat, pelaksanaan, proyek konstruksi.
ANALISIS DINAMIS RIWAYAT WAKTU JEMBATAN GANTUNG AKIBAT PEJALAN KAKI DAN KENDARAAN RODA DUA Edhi, Sarwo; Hasan, Muttaqin; Husaini, Husaini
JURNAL TEKNIK SIPIL Vol 1, No 4 (2018): Volume 1 Special Issue, Nomor 4, Februari 2018
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v1i4.10046

Abstract

Abstract : Suspended footbridges has a lot of constructed in Indonesia to access manyespecially rural-regions. Due to its flexiblity, understanding and design of the suspension bridge is not enough to rely on static analysis. This paper deal with the dynamic behaviour of simply unstiffening suspended bridges subjected to pedestrian load and motor-cycles moving load.As the SNI 03-3428-1994 codeof the technical planning for pedestrian suspension bridge is not set in consideration of dynamic analysis and design,pedestrian-load model is based on British Standard BS 5400-4: 1990 and Eurocode EN1991-2:2003. Modeling pedestrian load is done in three conditions; single pedestrian, group, and crowd. The motor-cycles moving load is modeled as a moving force model, accurate for low speed. Variations in the speed used was 10 km / h, 20 km / h, 30 km / h are considered representative. Dynamic analysis done by the time history Newmark direct integration method with the help of finite element analysis program SAP2000 v.15. Span 60 m, 80 m and 100 m was studied. As these results, dynamic interaction between the bridges and pedestrian load is not significant.The analyses have shown that the responses greatly differ between the British Standard and Eurocode.However, motor-cycle load has same results but higher with the largest DAF value 7.27% for speeds of 30 km / h interval of 2 seconds on a span of 100 m.Abstrak: Jembatan gantung pejalan kaki telah banyak sekali dibangun di Indonesia, sebagai pemecah masalah akses antar wilayah. Dikarenakan strukturnya yang fleksible, pemahaman dan desain jembatan gantung tidak cukup sekedar mengandalkan analisis statis. Tujuan penelitian ini adalah untuk memperlihatkan respons dinamis jembatan gantung pejalan kaki sederhana tanpa pengaku. Hal yang akan dipelajari adalah simpangan vertikal dan percepatan ditinjau dari sisi kenyamanan. Beban yang dikenakan adalah beban pejalan kaki dan kendaraan roda dua. Dikarenakan SNI 03-3428-1994 Tata cara perencanaan teknik jembatan gantung untuk pejalan kaki tidak mengatur analisis dinamis dalam pertimbangan analisis dan desain, pemodelan beban pejalan kaki didasarkan pada British Standard BS 5400-4:1990 dan Eurocode EN1990. Pemodelan beban pejalan kaki dilakukan dalam tiga kondisi; pejalan tunggal, pejalan kelompok, dan arus keramaian. Untuk beban kendaraan dimodelkan sebagai beban berjalan yang cukup akurat untuk kecepatan rendah. Variasi kecepatan yang digunakan adalah 10 km/jam, 20 km/jam, 30 km/jam dianggap cukup representatif. Analisis dinamis dilakukan secara riwayat waktu dengan metode integrasi langsung Newmark dengan bantuan program analisa elemen hingga SAP2000 v.15. Bentang yang diteliti adalah 60 m, 80 m dan 100 m. Dari hasil tersebut didapati bahwa percepatan akibat beban pejalan kaki masih kecil sehingga tak berpengaruh secara signfikan. Sedangkan beban sepeda motor juga demikian, dengan nilai DAF terbesar 7,27 % untuk kecepatan 30 km/jam selang 2 detik pada bentang 100 m.
KAJIAN POLA SEBARAN SEDIMEN PADA SALURAN BANJIR SUNGAI KRUENG ACEH Alfaisal Alfaisal; Syamsidik Syamsidik; Masimin Masimin
JURNAL TEKNIK SIPIL Vol 6, No 3 (2017): Volume 6, Nomor 3, Mei 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Krueng Aceh River is one of the main river in Aceh Province located in Krueng Aceh River Basin Area (DAS) with in 17.800 Acre wide and 145 km length. In order to minimize the flood impact in Banda Aceh with 1.300 m3/s flood discharge design, 900 m3/s discharge has been redirected to Krueng Aceh river floodway while the rest had distributed to the Krueng Aceh existing river. Meanwhile for 900 m3/s of the flood discharge is distributed through the floodway from the diversion weir. It is worried that the water will reach the top of the dike in some location of the main river. It is because of the swallow in the estuary due to the sediment concentration. This research aims is to investigate the sediment distribution pattern, estimating volume of the deposited sediment. Furthermore, the investigation is also to find how the sediment transport occured while the flood. The flood simulation had been done by the Delft3D Model which combine with the hydrodynamics and the sediment transport calculation. This model use 20x20 m grid for the domain. Topography and bathimetry data were collected from Balai Wilayah Sungai Sumatera–I (BWSS-I). Sediment characteristic had been primerly collected in the field. Simulation results had shown that the sediment distribution pattern on Krueng Aceh river floodway has a particular pattern remain relatively on the right side of the estuary. The sediment increase of 868.236 m3 and produced 2.039.560 m3 massive erosion during 3 month simulation with flood scenario. The sedimentation process is smaller compared to the erosion. But the erosion only happen in the area with the greater than value of current. The simulation complimented by 5 years return flood design was uncapable to flush the sediment which deposited on the eastern side of the estuary. The phenomenon happened because of the river morphology with it meandering channel, not enough length of left jetty and the current that not equally distributed. The solution for this problem is by lengthening the left side of the jetty toward the breakwater and constructing the river training toward the current in the left side of the estuary. Abstrak: Krueng Aceh merupakan salah satu sungai besar di Provinsi Aceh, berada dalam wilayah Daerah Aliran Sungai (DAS) Krueng Aceh dengan luas DAS 17.800 Ha dan panjang sungai 145 Km. Untuk meminimalisir terjadinya banjir di kota Banda Aceh dengan debit banjir rancangan sebesar 1.300 m3/detik, maka untuk debit banjir 400 m3/detik dialirkan melalui Sungai Kr. Aceh existing. Sedangkan untuk debit banjir sebesar 900 m3/detik dialirkan melalui saluran banjir dari bendung pelimpah banjir (Diversion Weir). Pada beberapa lokasi di sungai induk dikhawatirkan elevasi muka air akan mencapai puncak tanggul. Ini akibat dari pendangkalan yang terjadi di bagian muara dengan adanya konsentrasi sedimen. Penelitian ini bertujuan untuk mengetahui pola sebaran sedimen pada bagian hilir saluran banjir, mengetahui volume sedimen yang terkonsentrasi setelah kejadian banjir dan mengetahui bagaimana pergerakan sedimen terjadi setelah banjir. Penelitian dilakukan dengan simulasi numerik menggunakan software Delft3D yang berfungsi sebagai model traspor sedimen pada lokasi simulasi. Model ini menggunakan grid  dengan ukuran 20 m x 20 m. Data yang digunakan adalah data topografi dan batimetri dari Balai Wilayah Sungai Sumatera-I dan parameter sedimen dari hasil pengambilan sampel di lokasi kajian. Hasil simulasi menunjukkan bahwa, pola sebaran sedimen pada saluran banjir sungai Krueng Aceh memiliki pola yang relatif tetap khususnya pada sisi kanan muara, peningkatan sedimen setelah terjadinya banjir sebesar 868.236 M3 dan yang tergerus sebesar 2.039.560 M3. Artinya volume sedimen yang mengendap lebih kecil dari pada yang tergerus. Namun yang tergerus tersebut hanya pada jalur dengan arus yang lebih besar. Hasil dari simulasi dengan menggunakan debit banjir rancangan lima tahunan, sedimen yang berada di sisi kanan muara tidak mampu tergelontor ke laut. Hal ini diakibatkan karena bentuk meander saluran yang berbelok, jetty di sisi kiri yang kurang panjang dan arus banjir yang tidak merata. Upaya yang dapat dilakukan yaitu dengan memperpanjang jetty sisi kiri  sampai kedalaman gelombang pecah dan membuat river training untuk mengarahkan arus ke bagian sedimen di sisi kanan muara.
EFEKTIFITAS KONSEP RUANG EKSTRA SEBAGAI ALTERNATIF MITIGASI PENJALARAN TSUNAMI DI SUNGAI Amra, Rajuli; Samsunan, Samsunan
JURNAL TEKNIK SIPIL Vol 9, No 1 (2020): Volume 9 Nomor 1 Mei 2020
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.24815/jts.v9i1.15735

Abstract

Gelombang tsunami dapat berpropagasi jauh ke hilir sungai dan menghasilkan kerusakan yang serius bagi infrastruktur wilayah sungai dan juga menyebabkan banjir ke area pemukiman. Meninggikan tanggul sungai terbukti tidak efektif dalam mengurangi efek yang ditimbulkan oleh intrusi gelombang tsunami. Relokasi tanggul sungai dengan konfigurasi tertentu memberikan ruang ekstra untuk sungai (extra-room) terbukti dapat mereduksi ketinggian gelombang tsunami di sungai. Efektifitas dari metode ruang ekstra ditentukan oleh kapasitas ruang dan layout perluasan. Penelitian ini bertujuan untuk mengetahui layout yang efektif dalam mengurangi dampak penjalaran gelombang di sungai yang bermeander. Investigasi dilakukan secara numerik menggunakan model matematika COMCOT untuk mensimulasikan propagasi tsunami selama satu jam dengan berbagai variasi ketinggian gelombang awal (2m dan 3m). Geometri sungai (panjang 1 km dan lebar 0,4 km) yang digunakan berbentuk meander simetris dengan sudut pembelokan maksimum sebesar 60 derajat (moderat). Geometri sungai mengadopsi konsep sine generated curve, sedangkan topografi dasar sungai dimodelkan menggunakan pendekatan tranversal bed elevation. Hasil simulasi dari beberapa konfigurasi layout perluasan ruang sungai (diasumsikan bentuk sungai tetap dan tidak bermigrasi) menunjukkan bahwa konfigurasi along-river expansion lebih signifikan dalam mereduksi laju penjalaran tsunami sebesar 63%, dibandingkan dengan konfigurasi lateral-river expansion. Hasil simulasi juga menunjukkan bahwa perluasan ruang di titik awal pembelokan sungai tidak berkontribusi secara signifikan dalam mendisipasi transmisi gelombang intrusi, dibandingkan dengan perluasan di bagian muara sungai. Penerapan konsep ruang ekstra tidak berlaku menyeluruh, dimana gelombang limpasan yang menghasilkan inundasi lokal masih mungkin terjadi ketika amplitudo gelombang awal melewati ambang batas gelombang rencana. Untuk itu, diperlukan penelitian lanjutan dengan batasan yang lebih fleksibel. Penelitian lanjutan diharapkan juga dapat memvalidasi keabsahan hasil yang telah diperoleh melalui penelitian ini.Kata kunci : Tsunami, ruang ekstra, mitigasi alternative, sungai bermeander, simulasi numerik
EVALUASI POTENSIAL LIKUIFAKSI PESISIR PANTAI KRUENG RAYA ACEH BESAR PROVINSI ACEH Reza P. Munirwan; Hendra Gunawan
JURNAL TEKNIK SIPIL Vol 1, No 2 (2012): Volume 1, Nomor 2, Januari 2012
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: Aceh – Indonesia, is a province that is prone to the earthquake strike because of the position of it which is close to earth fault. There are subduction tectonic fault, Indo-Australia, Euo-Asia tectonic faults, and Sumatra fault.  The aim of this research was to analyse the probability of sand soil failure (liquefaction potency) as the earthquake strike. The earthquake waves when it reaches the saturated of sand soil layer as a cyclic loads, leads the sand soil layers to fail (soil liquefaction). The soil formation will be change due to the cyclic loads and increase the pore water pressure, as a result the soil shear strength will decrease or even loss strength and becomes like fluida. The location of the research is in Krueng Raya beach in Aceh Besar – Aceh province. The data were obtained from N-SPT test and showed that the soil layers are dominant with sand soil layers. Seed et al (1976) and Castro (1975) were used to analyse the liquefaction potency. The research shows that liquefaction occurs in the depth of 3 m – 15 m for Seed et al (1976) method whereas no indication of liquefaction shows from Castro (1975) methods in any depths.Keywords : Liquefaction, subduction, potential, cyclic load, N-SPT.Abstrak: Aceh – Indonesia, merupakan provinsi yang rawan terhadap gempa dikarenakan antara lain Aceh berada di sekitar pantai barat Sumatera yang merupakan daerah pertemuan dari plat tektonik dasar laut (subduksi), plat tektonik Indo-Australia, Euro-Asia, dan patahan Sumatra Fault yang dapat mempengaruhi gempa. Penelitian ini bertujuan untuk menganalisis potensi keruntuhan struktur tanah pasir (potensi likuifaksi) apabila terjadi gempa bumi. Pada suatu lapisan tanah pasir yang jenuh air, getaran-getaran gempa bumi menyebabkan potensi terjadi suatu gejala likuifaksi yang merupakan gejala keruntuhan struktural tanah akibat menerima beban siklis (berulang). Beban siklis ini menimbulkan perubahan-perubahan di dalam deposit, berupa peningkatan tekanan air pori sehingga kuat geser tanah menjadi berkurang atau bahkan hilang (loss strength) sehingga berperilaku seperti fluida. Studi ini dilakukan pada lokasi pantai Krueng Raya Aceh Besar Provinsi Aceh. Berdasarkan data sekunder N-SPT, diperoleh lubang bor yang struktur tanah per lapisan dominan pasir. Potensi likuifaksi dianalisis dengan menggunakan metode-metode analisis Seed et al., (1976), dan Castro (1975). Hasil studi ini menunjukkan bahwa analisis likuifaksi dengan menggunakan metode Seed et al. (1976) terjadi pada kedalaman 3 m - 15 m dengan magnitude lebih besar dari 7,0 SR. Sedangkan analisis dengan menggunakan metode Castro (1975) pada kedalaman yang sama dengan tinjauan Seed et al (1976) likuifaksi tidak terjadi.Kata kunci : Likuifaksi, subduksi, potensi, beban siklis, N-SPT.
ANALISIS RISIKO PENAWARAN UNDERESTIMATE COST TERHADAP KUALITAS PROYEK KONSTRUKSI JALAN DI PROVINSI ACEH Hamdani Hamdani; Muhammad Isya; Hafnidar Abd Rani
JURNAL TEKNIK SIPIL Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017
Publisher : Jurusan Teknik Sipil, Fakultas Teknik, Universitas Syiah Kuala

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Abstract: This study aimed to analyze the most dominant factor in the risk of deals underestimate the cost, analyzing the relationship between risk factors deals underestimate the cost of the quality of road construction projects in the province of Aceh, and analyze the risk factors deals underestimate the cost of the most likely to affect the quality of construction projects road in the province of Aceh. Road construction were observed which have been completed in the province of Aceh starting from the year 2013 to 2015. This study uses interviews aimed at Budget Authority (KPA), as well as a questionnaire aimed to contractors of roads, with the qualification of K1, K2, K3, M1, M2 and B1. Based on data from Construction Services Development Board (LPJK) 2016 Aceh province, the population number is obtained as much as 2,717 contractors. Through equation Slovin the study sample was obtained by 97 contractors. The dominant factor underestimate the risk of cost deals on a road construction project in the province of Aceh is the cost factor contingency, with a mean value of 4,374. The relationship between risk factors underestimate cost deals on the quality of road construction projects in the province of Aceh are all associated very low partially with a Pearson correlation coefficient value 0,200. The risk factors underestimate deals cost the most likely to affect the quality of road construction projects in the province of Aceh is located on factors sighting locations, with a regression coefficient of 3,327. This suggests that if an enhanced review of the location, the workforce in terms of both quality and productivity on the quality of road construction projects in the province of Aceh will increase.Abstrak: Penelitian ini bertujuan untuk menganalisis faktor yang paling dominan terjadinya risiko penawaran underestimate cost, menganalisis hubungan antara faktor-faktor risiko penawaran underestimate cost terhadap kualitas proyek konstruksi jalan di Provinsi Aceh, dan menganalisis faktor-faktor risiko penawaran underestimate cost yang paling berpeluang mempengaruhi kualitas proyek konstruksi jalan di Provinsi Aceh. Proyek konstruksi jalan yang diamati adalah yang telah selesai dilaksanakan di Provinsi Aceh mulai dari tahun 2013-2015. Penelitian ini menggunakan wawancara yang ditujukan pada Kuasa Pengguna Anggaran (KPA), serta kuesioner yang ditujukan kepada kontraktor bidang jalan, dengan kualifikasi K1, K2, K3, M1, M2 dan B1. Berdasarkan data dari Lembaga Pengembangan Jasa Konstruksi (LPJK) Provinsi Aceh Tahun 2016, jumlah populasi diperoleh sebanyak 2.717 kontraktor. Melalui persamaan Slovin maka sampel penelitian diperoleh sebanyak 97 kontraktor. Faktor dominan terjadinya risiko penawaran underestimate cost pada proyek konstruksi jalan di Provinsi Aceh adalah faktor biaya contingency, dengan nilai mean sebesar 4,374. Hubungan antara faktor-faktor risiko penawaran underestimate cost terhadap kualitas proyek konstruksi jalan di Provinsi Aceh adalah semuanya mempunyai hubungan yang sangat rendah secara parsial dengan nilai koefisien korelasi Pearson 0,200. Faktor risiko penawaran underestimate cost yang paling berpeluang mempengaruhi kualitas proyek konstruksi jalan di Provinsi Aceh berada pada faktor peninjauan lokasi, dengan nilai koefisien regresi sebesar 3,327. Hal ini menunjukkan bahwa apabila faktor peninjauan lokasi ditingkatkan, maka tenaga kerja yang baik dari segi kualitas dan produktivitas pada kualitas proyek konstruksi jalan di Provinsi Aceh akan semakin meningkat.

Page 1 of 35 | Total Record : 345


Filter by Year

2011 2025


Filter By Issues
All Issue Vol 14, No 1 (2025): Volume 14 Nomor 1 Mei 2025 Vol 13, No 2 (2024): Volume 13 Nomor 2 November 2024 Vol 13, No 1 (2024): Volume 13 Nomor 1 Mei 2024 Vol 12, No 2 (2023): Volume 12 Nomor 2 November 2023 Vol 12, No 1 (2023): Volume 12 Nomor 1 Mei 2023 Vol 11, No 2 (2022): Volume 11 Nomor 2 November 2022 Vol 11, No 1 (2022): Volume 11 Nomor 1 Mei 2022 Vol 10, No 2 (2021): Volume 10 Nomor 2 November 2021 Vol 10, No 1 (2021): Volume 10 Nomor 1 Mei 2021 Vol 9, No 2 (2020): Volume 9, Nomor 2, November 2020 Vol 9, No 1 (2020): Volume 9 Nomor 1 Mei 2020 Vol 8, No 2 (2019): Volume 8, Nomor 2, November 2019 Vol 8, No 1 (2019): Volume 8, Nomor 1, Mei 2019 Vol 7, No 2 (2018): Volume 7, Nomor 2, November 2018 Vol 7, No 1 (2018): Volume 7, Nomor 1, Mei 2018 Vol 1, No 4 (2018): Volume 1 Special Issue, Nomor 4, Februari 2018 Vol 1, No 3 (2018): Volume 1 Special Issue, Nomor 3, Januari 2018 Vol 6, No 3 (2017): Volume 6, Nomor 3, Mei 2017 Vol 6, No 2 (2017): Volume 6, Nomor 2, Januari 2017 Vol 1, No 2 (2017): Volume 1 Special Issue, Nomor 2, Desember 2017 Vol 1, No 1 (2017): Volume 1 Special Issue, Nomor 1, September 2017 Vol 6, No 1 (2016): Volume 6, Nomor 1, September 2016 Vol 5, No 3 (2016): Volume 5, Nomor 3, Mei 2016 Vol 5, No 2 (2016): Volume 5, Nomor 2, Januari 2016 Vol 4, No 3 (2015): Volume 4, Nomor 3, Mei 2015 Vol 3, No 2 (2014): Volume 3, Nomor 2, Januari 2014 Vol 3, No 1 (2013): Jurnal Teknik Sipil Volume 3, Nomor 1, September 2013 Vol 2, No 2 (2013): Volume 2, Nomor 2, januari 2013 Vol 2, No 3 (2013) Vol 2, No 1 (2012): Volume 2, Nomor 1, September 2012 Vol 1, No 3 (2012): Volume 1, Nomor 2, Mei 2012 Vol 1, No 2 (2012): Volume 1, Nomor 2, Januari 2012 Vol 1, No 1 (2011): Volume 1, Nomor 1, September 2011 More Issue