cover
Contact Name
Suherwin
Contact Email
jurnalj44@gmail.com
Phone
+6285321800066
Journal Mail Official
jurnalj44@gmail.com
Editorial Address
Universitas Pejuang Republik Indonesia Jl. Bukit Baruga Antang Kota Makassar Propinsi Sulawesi Selatan
Location
Kota makassar,
Sulawesi selatan
INDONESIA
JTT: Journal Teknik Dan Teknologi
ISSN : -     EISSN : 31106005     DOI : -
Core Subject : Engineering,
JTT: Journal Teknik Dan Teknologi : Berperan dalam merancang, menganalisis, dan memelihara sistem mekanik seperti alat berat, mesin bor, sistem transportasi tambang, dan peralatan produksi. Teknik Mesin memberikan dasar keteknikan untuk memastikan efisiensi kerja alat serta ketahanan terhadap tekanan dan keausan. Fokus pada eksplorasi, ekstraksi, dan pengolahan sumber daya mineral. Dalam kolaborasi ini, Teknik Pertambangan menyediakan data kondisi medan dan kebutuhan operasional di lapangan tambang untuk menyesuaikan desain alat dan proses kerja agar sesuai dengan karakteristik geologi dan keselamatan kerja. Menjadi penghubung sistem mekanik dan operasi tambang dengan teknologi digital, melalui pengembangan perangkat lunak, sistem berbasis IoT, pemrosesan data real-time, serta penerapan kecerdasan buatan dan sistem pakar untuk monitoring, prediksi kerusakan, dan optimasi proses tambang.
Articles 7 Documents
Search results for , issue "Vol. 1 No. 02 (2025): Juni" : 7 Documents clear
OPTIMALISASI ALAT MUAT ALAT ANGKUT SERTA ANALISIS BIAYA OPERASIONAL ORE GETTING DARI PIT KE STOCKPILE DI PT. FORMAT TEKNIK MANDIRI SITE SUBAIM KABUPATEN HALMAHERA TIMUR PROVINSI MALUKU UTARA Gina Audina P Alhabsyi; Iyan Suryani; Ruth Bunga Ranggu; Andi Nurul isma
Journal Teknik Dan Teknologi  Vol. 1 No. 02 (2025): Juni
Publisher : Journal Teknik Dan Teknologi 

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT. Format Teknik Mandiri is a private company operating in the mining sector which has a work contract in Subaim Village, Wasile Sub-district, East Halmahera Regency, North Maluku Province. Mining is carried out using an open mining system (Surface Mining) using the Open Cut Mining method, namely cutting from the ridge downwards. To create a mining activity that is sustainable, efficient and profitable, it is necessary to pay attention to every aspect that influences operational costs during mining. Controlling operating costs carried out regularly will make it easier for company management to control production costs for each mining/production activity so that expenses can be reduced to a minimum and can produce maximum profits. The aim of this research is to determine the production capabilities of mechanical equipment, analyze the costs that must be incurred by the company for ore getting activities. After conducting research, the author obtained a production volume of loading equipment of 3,844 m3 per day and production of transportation equipment for 3 Shacman F3000 units of 5,426 m3 per day with a total cost for 30 days (target time) the costs incurred were Rp. 738,061,200p.
Sistem Pakar Diagnosa Awal Penyakit Kulit Sapi Berbasis Web Menggunakan Metode Certainty Factor Gihon Life Purba; Rachmat
Journal Teknik Dan Teknologi  Vol. 1 No. 02 (2025): Juni
Publisher : Journal Teknik Dan Teknologi 

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Public understanding of skin diseases in cattle is still low. Many people still rely on manual expertise from experts. So the costs borne by the community are quite expensive and in terms of time it is also less efficient. This consultation media is an application of a computer-based Expert System that uses facts and reasoning techniques to solve problems that usually can only be solved by an expert in a particular field. Expert systems provide added value to technology to help in dealing with an increasingly sophisticated information era. This Expert System application produces output in the form of an application program or tool that can be used to diagnose possible skin diseases in cattle based on the symptoms input by the user. This system also displays the level of confidence of these symptoms in skin diseases entered by the user. The magnitude of the trust value is the result of calculations using the probability method. System testing shows that the system is able to diagnose cowhide disease based on the symptoms suffered by the patient even though these symptoms contain uncertainty. The diagnosis results are accompanied by a Certainty Factor value which shows the level of truth and accuracy of possible skin diseases in cattle.
Penerapan Algoritma C4.5 Seleksi Penerima Beasiswa Bidikmisi Pada Kampus Stmik Agamua Wamena WILYAM ARIESTA HALUK; Syafruddin Syarif; Supriadi Sahibu
Journal Teknik Dan Teknologi  Vol. 1 No. 02 (2025): Juni
Publisher : Journal Teknik Dan Teknologi 

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Bidikmisi Scholarship is a financial aid program aimed at economically disadvantaged students with strong academic performance. The selection process for recipients of this scholarship often faces challenges, particularly in determining the eligibility of candidates, which requires numerous criteria and complex data analysis. This study aims to develop a scholarship selection system using the C4.5 algorithm. It is expected that this algorithm can automate and expedite the selection process with more transparent and objective results. The dataset used includes applicants for the Bidikmisi scholarship from 2015 to 2020. The methods applied include oversampling and undersampling techniques to address class imbalance in the data. Based on testing, this system achieved an accuracy of 76%, with a precision of 76% and recall of 71%, indicating that the system can be relied upon for the scholarship selection process at STMIK Agamua Wamena.
ANALISIS PRODUKSI ALAT MUAT DAN ALAT ANGKUT PADA PENGUPASAN OVERBURDEN PT. WIJAYA INTI NUSANTARA KABUPATEN KONAWE SELATAN PROVINSI SULAWESI TENGGARA Ariel; Hendra Sani; Ruth Bunga R
Journal Teknik Dan Teknologi  Vol. 1 No. 02 (2025): Juni
Publisher : Journal Teknik Dan Teknologi 

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Loading and transporting overburden is one of the activities carried out in nickel mining by moving overburden from the mining front to the disposal site. Research Objectives: 1) Determine the efficiency of loading and transporting equipment in loading and transporting overburden. 2) The production capacity of loading and transporting equipment used in loading and transporting overburden. 3) The compatibility factor between loading and transporting equipment used in loading and transporting overburden. The methods used in this study were interviews and observation. The interview method was conducted with people in the company area regarding data to be collected at the company itself. Then, the observation method involved directly observing the data to be collected at the company. The results achieved in this study are the work efficiency value for loading equipment is 83% and for transport equipment is 83%, the production of 1 unit of loading equipment is 37,788.16 Bcm/month and 4 units of transport equipment is 37,333.6 Bcm/month so that it has met the target, the work harmony factor of loading equipment and transport equipment is 0.98 so that MF<1, which means that the transport equipment is working fully and the loading equipment still has waiting time. It is necessary to add transport equipment so that the loading equipment does not have waiting time.
ANALISIS KADAR NIKEL PADA PT.SINAR CIKOANG GEMILANG KECAMATAN BUNGKU TIMUR KABUPATEN MOROWALI Ihzal Nurdin Tahir; Hendra Sani; Syamsuddin; Gina Audina
Journal Teknik Dan Teknologi  Vol. 1 No. 02 (2025): Juni
Publisher : Journal Teknik Dan Teknologi 

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Sinar Cikoang Gemilang Edifice is a company engaged in the mining sector, especially in nickel ore mine located in the village of buleleng Regency of morowali kecamatan bungku coastal province of Central Sulawesi. IUP Pt. SCG. PT. Sinar Cikoang Gemilang (SCG) is one of the laterite nickel mining company using the system of open mining (surface mining). Levels of supervision will be conducted strictly by Quality Control both from the front of the mine until the placement of ore in the area of the Stock Pile and continuously perform the taking of the sample to control grade and do blending ore with appropriate methods so that the desired levels can be achieved. The order of the mining activities in PT. Sinar Cikoang Gemilang includes disassembly, loading and hauling. PT. Sinar Cikoang Gemilang provides various mechanical tools in helping the forefront, such as gali transport tools, tools, fit and support. In conducting the activities of the mining of nickel ore (ore) is done by using the tool fit excavator and ore minerals results material loaded into dump trucks brought to the dom/stockpile. Research issues do occur between the mining front levels and stockpile as well as causative factor of difference. The purpose of the study to find out how large the difference levels and cause factor levels of distinction. To get the desired data will then be carried out observation/observation methods where the author will engage directly with activities on the spot. As for the results of the data mining in the production is a dom2:1.85, dom 3:1.76 and realization in the stockpile is dom 2:1.83, dom 3:1.79 and distortion levels to dom 2 amounted to 1.08% and 1.7% of dom 3. From the observations, then retrieved the factors cause decline tonage and decreased levels of among others the following: The skills of the operator when taking ore getting and mixing, Thoroughness in sampling, Tertukarnya sample preparation of work time, Doping and lost when the ore mining.
ANALISIS GEOMETRI JALAN ANGKUT TAMBANG PADA PT. NATURAL PERSADA MANDIRI KECAMATAN LASOLO KEPULAUAN KABUPATEN KONAWE UTARA PROVINSI SULAWESI TENGGARA Erwin; Kasmira; Zulfahmi; Gina Audina P Alhabsyi
Journal Teknik Dan Teknologi  Vol. 1 No. 02 (2025): Juni
Publisher : Journal Teknik Dan Teknologi 

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The purpose of this study is to Analysis of the geometry of the mine haul road at PT. Natural Persada Mandiri, especially in the Bumi Pit 7 Block to the stockpile based on the mine haul road recommendation that refers to the AASTHO standard, which is located in Waturambaha, Lasolo Islands District, Konawe Utara Regency, Southeast Sulawesi Province in the IUP (Mining Business Permit) area of PT. Binanga Hartama Raya. Based on the design results of the mine haul road using Surpac 6.3, the road from Blok Bumi Pit 7 to the stockpile has a track length of ± 610 meters referring to the recommendation of the mining road geometry where the straight road width is 9 meters, the road width at the bend is 11 meters, 4% super elevation, slope the length of the road ranges from 8% - 10%. Because the new land clearing will be held, the researchers designed a road that is in accordance with existing safety standards, thus obtaining safe results for the Hino 500 FM 260 JD transportation means.
ANALISIS DESAIN DISPOSAL PADA PENAMBANGAN PT. VALE INDONESIA, Tbk Herichzon Tandiasa; Gina Audina P Alhabsyi; Syamsuddin; Hendra Sani
Journal Teknik Dan Teknologi  Vol. 1 No. 02 (2025): Juni
Publisher : Journal Teknik Dan Teknologi 

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT Vale Indonesia Tbk (PTVI) is a subsidiary of Vale, a global mining company based in Brazil. Before being named PT Vale Indonesia Tbk, the company located in South Sulawesi was named PT International Nickel Indonesia Tbk. (PT INCO). The research problem is how to calculate the disposal design that requires later storage that can be used overburden material from the nearest Pit and the amount of geometry of each design that has been made. The method used to analyze using Vulcan software version 9.0, using formulas, interview methods and documentation. The results showed the total disposal design capacity of 12,213,531 (wmt), Disposal Storage Capacity of 18,791,082 (wmt) and Geometry s_disp_block_2g0_01: Slope Angle: 400, Number of Benches: 2 and Width of Storage: 40,791,082 (wmt) and Geometry s_disp_block_2g0_02: Slope Angle: 260, Number of Benches: 2 and Berm Width: 40m (40,835), Geometry s_disp_block_2g0_03: Angle of Slope: 340, Number of Benches: 2 and Width Width: 40m (40,835), Geometry s_disp_block_g04 Slope 450, Berm Width 42m (42,092), Number of Bench 5, 40 M), Slope Angle 450, Number of Benches 6, s_disp_block_2g0_05: Slope Angle: 340, Berm Width: 40,603 (41 M), Number of Benches 3. Number of overburden results from the nearest pit.

Page 1 of 1 | Total Record : 7