cover
Contact Name
Nur Hasanah
Contact Email
nur.hasanah@batan.go.id
Phone
+6221-5204243
Journal Mail Official
jpen@batan.go.id
Editorial Address
Kawasan Kantor Pusat Badan Tenaga Nuklir Nasional Jl. Kuningan Barat, Mampang Prapatan, Jakarta 12710 Kotak Pos 4390 Jakarta 12043
Location
Kota adm. jakarta selatan,
Dki jakarta
INDONESIA
Jurnal Pengembangan Energi Nuklir
ISSN : 14109816     EISSN : 25029479     DOI : https://doi.org/10.17146/jpen
Jurnal Pengembangan Energi Nuklir publishes scientific papers on the results of studies and research on nuclear energy development with the scope of energy and electricity planning, nuclear energy technology, energy economics, management of nuclear power plants, national industries that support nuclear power plants, aspects of the nuclear power plant site and environment, and topics others that support the development of nuclear energy.
Articles 343 Documents
PERKIRAAN PARTISIPASI INDUSTRI NASIONAL DALAM PEMBANGUNAN PLTN HTR Nurlaila Nurlaila; Sriyana Sriyana
Jurnal Pengembangan Energi Nuklir Vol 16, No 1 (2014): Juni 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.1.2538

Abstract

ABSTRAK PERKIRAAN PARTISIPASI INDUSTRI NASIONAL DALAM PEMBANGUNAN PLTN HTR. Salah satu aspek penting dalam penyiapan infrastruktur pembangunan PLTN adalah aspek keterlibatan industri nasional. IAEA memberi rekomendasi bahwa perlu dilanjutkan untuk persiapan fase 2, yakni dengan aspek kebijakan penetapan tingkat partisipasi nasional. Tujuan kajian ini adalah memperkirakan tingkat partisipasi nasional dengan mengetahui tingkat kandungan komponen dalam negeri untuk reaktor tipe HTR berdaya kecil. Metodologi yang digunakan adalah studi literatur, membandingkan hasil kajian potensi industri nasional untuk sistem teknologi PLTN tipe LWR  dengan tipe HTR, melakukan perhitungan perkiraan tingkat partisipasi industri nasional berbasis biaya modal atau investasi yang lingkupnya dibatasi untuk jenis PLTN tipe HTR berdaya kecil dan hanya untuk proyek pembangunan unit pertama. Hasil studi menunjukkan bahwa dibandingkan dengan untuk pembangunan PLTN tipe LWR berdaya menengah hingga besar, tingkat partisipasi nasional dalam pembangunan PLTN diperkirakan sebesar 30%, namun bila dibandingkan dengan pembangunan PLTN tipe HTR berdaya kecil, tingkat partisipasi nasional sebesar 36% (kontrak putar kunci) dan sekitar 38% (kontrak Multi-Package).berdasarkan hal ini, direkomendasikan untuk memilih tipe kontrak putar kunci, hal ini mengingat belum ada pengalaman dalam membangun PLTN. Kata kunci: partisipasi industri nasional, HTR, daya kecil ABSTRACT ESTIMATION OF NATIONAL INDUSTRI PARTICIPATION ON HTR CONSTRUCTION. One of the important aspect in infrastructure preparedness of NPP construction is national industri involvement aspect. IAEA recommended that it required to  continue to the phase 2 by establishing the policy of national participation level decision.The objective of this paper is to estimate the level of local content component or national participation level especially for small HTR type reactor. Metodology used are literature study, comparison of NPP technology system which has been assessed the national participation potention with HTR type of NPP, calculation on national industri participation level estimation based on previous calculation that based on capital cost or investment cost. This estimation scope is limited only on small HTR type of NPP and only for construction project of the first unit. The results show that (a) Based on several studies which has been done, the result of previous national participation study for NPP (for medium and large unit size) construction is 30%. (b) Based on the latest national industri capability data and comparing with previous study, it is estimated that national indusrty participation level is 36% for turnkey contract and about 38% for Multi-Package contract. It is recommended that for the first NPP project would better with the turnkey contract type. Keywords: national industri participation, HTR, small unit size 
Studi Geologi Awal untuk Calon Tapak PLTN di Pulau Singkep dan Lingga, Kepulauan Riau Frederikus Dian Indrastomo; Heri Syaeful; Kurnia Anzhar; June Mellawati
Jurnal Pengembangan Energi Nuklir Vol 21, No 1 (2019): Juni 2019
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2019.21.1.5482

Abstract

STUDI GEOLOGI AWAL UNTUK CALON TAPAK PLTN DI PULAU SINGKEP DAN LINGGA, KEPULAUAN RIAU. Pulau Singkep dan Lingga adalah bagian dari Kepulauan Riau, seperti Pulau Batam, Bintan, Karimun,terletak pada daerah strategis yang dapat menjadi lokasi dikembangkannya perdagangan dan perindustrian. Guna memenuhi kebutuhan teknologi dan listriknya, PLTN merupakan salah satu alternatif pilihan. Berdasarkan hal ini telah dilakukan studigeologi awal guna mengetahui keberadaan daerah interes untuk lokasi PLTN di Kepulauan Riau. Tujuan penelitian untuk mengetahui kelayakan Pulau Singkep dan Lingga dari aspek geologi sebagai daerah interes untuk ditindaklanjuti sebagai calon tapak PLTN. Metodologi penelitian meliputi studi geologi regional melalui pengumpulan data sekunder, dan survei lapangan untuk verifikasi data sekunder. Verifikasi data lapangan meliputi pengamatan batuan untuk menentukan jenis dan karakteristiknya, pengukuran struktur geologi untuk mengetahui potensi sesar dan gempa, pendataan sumber air panas untuk mengetahui aktivitas magmatisme. Pengamatan dilakukan di wilayah pesisir Pulau Singkep dan Lingga. Hasil penelitian awal untuk aspek geologi menunjukkan bahwa ditemukan beberapa daerah interes yang secara kualitatif merupakan lokasipotensial calon tapak PLTN. Dari aspek kegempaan, Pulau Singkep dan Lingga relatif aman. Sebaran batuan metamorfik dari Kompleks Malihan Persing dan granit Tanjungbuku ditemukan di Pulau Singkep, sedangkan sebaran batuan metamorf Formasi Tanjung Datuk di Pulau Lingga. Jenis batuan tersebut merupakankelompok batuan kerasdan resisten, sehinggasangat potensial untuk daerah interes calon tapak PLTN. 
PERHITUNGAN PERCEPATAN TANAH MAKSIMUM DI UJUNG LEMAHABANG PADA BOR D-28 (300 METER) MENGGUNAKAN PROGRAM SHAKE Hadi Suntoko
Jurnal Pengembangan Energi Nuklir Vol 5, No 2 (2003): Desember 2003
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2003.5.2.1921

Abstract

ABSTRAK PERHITUNGAN PERCEPATAN TANAH MAKSIMUM DI UJUNG LEMAHABANG PADA BOR D-28 (300 METER) MENGGUNAKAN PROGRAM SHAKE. Lokasi yang diusulkan oleh Konsultan untuk pondasi reaktor Pembangkit Listrik Tenaga Nuklir (PLTN) terietak tepat di atas lubang bor D28 yang mempunyai kedalaman 300 meter. Bor dalam tersebut diperiukan untuk mengetahui perilaku tanah/batuan secara detil, baik secara statik maupun dinamik. Tujuan perhitungan percepatan tanah maksimum ini secara umum adalah untuk mengetahui sifat dinamik permukaan yang akan berpengaruh terhadap pondasi. Cara yang dilakukan dalam perhitungan ini, menggunakan program Shake dengan memasukan parameter-parameter tanah/batuan, antara lain kedalaman pelapisan, densiti, kecepatan geser tanah, damping dan input gempa iokal maka akan diperoleh nilai percepatan tanah maksimum (maximum acceleration). Untuk parameter input gempa menggunakan gempa daerah lain yang mempunyai kesamaan skala seperti gempa Kobe (M=7.2 skala Richter) karena gempa tersebut sulit diperoleh di daerah penelitian. Hasil running dari penelitian ini sangat dipengaruhi oleh input damping, kedalaman pelapisan, dan input gempa itu sendiri. Sehingga perilaku pondasi untuk struktur bangunan besar yang diperhitungkan adanya gempa, tergantung dari desain awai nilai dinamik tanah seperti halnya percepatan tanah maksimum permukaan.   ABSTRACT THE CALCULATION OF MAXIMUM ACCELERATION AT THE UJUNG LEMAHABANG SITE FOR D-28 (300 METER) USED SHAKE PROGRAM. Proposed site from Consultant to use for a foundation of Nuclear Power Plants lies at the bore hole D28, it has 300 meters depths. The bore hole have done to the soil/stone characteristic including of static and dynamic analysis. Generally the purpose of maximum acceleration for identification a dynamic surfacethat will affect of a founddation. Methodology is used the shake programe with including of the soil/stone parameters, namely depth, density, shear wave velocity, damping, earthquake so it will gate of the maximum acceleration. Input motion earthquake used a other site that it has same scale likes the Kobe Earthquake (M = 7.2 Richter) as earthqquake very difficult in the ULA site. The results of the running from Shake program very affect of a damping, depths of the layers, and input motion earthquake self. So that a foundation characteristic for big stucture will calculate of the earthquake, depending from fisrt desain of a dynamic value like this maximum acceleration.
Hal Belakang JPEN 2014 Volume 16 Nomor 2 Desember Hal Belakang
Jurnal Pengembangan Energi Nuklir Vol 16, No 2 (2014): Desember 2014
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2014.16.2.3237

Abstract

STUDI SUMBER DAYA MANUSIA TERHADAP INDUTRIALISASI DI MADURA Aziz Jakfar; Mochamad Nasrullah; Sriyana Sriyana; Moch. Djoko Birmano
Jurnal Pengembangan Energi Nuklir Vol 9, No 2 (2007): Desember 2007
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2007.9.2.1961

Abstract

ABSTRAK STUDI SUMBER DAYA MANUSIA TERHADAP INDUTRIALISASI DI MADURA. Tujuan dari penelitian adalah memperoleh gambaran yang komprehensif mengenai kesiapan SDM terhadap industrialisasi di Madura dengan : 1). Menentukan arah pengembangan industrialisasi; 2).Mengidentifikasi faktor pendukung dan kendala; 3).Mengidentifikasi alternatif solusi; 4).Menentukan analisis kapasitas SDM dengan Indeks Pembangunan Manusia (IPM) atau Human Development Index (HDI); 5).Mengidentifikasi strategi pengembangan ketenagakerjaan; 6).Mengidentifikasi peran pendidikan dalam pengembangan SDM; 7).Merumuskan agenda pengembangan SDM. Arah dari pengembangan kawasan industrialisasi di Madura adalah memberikan iklim kondusif bagi investor untuk mengoptimalkan industri berbasis potensi dan perluasan/ekspansi industri dari daerah lain. Faktor pendukung skenario industrialisasi di Madura : Jembatan Suramadu, perluasan Gerbang Kertosusiia menjadi Germa Kertosusila dan tersedianya sarana dan prasarana. Faktor kendalanya : rendahnya persepsi masyarakat terhadap pentingnya industrialisasi dan adanya keterbatasan pasokan energi listrik dan air. Alternatif solusi terhadap faktor kendala : sosialisasi pentingnya industrialisasi bagi kemajuan Madura oleh semua komponen stake holders. Sedangkan, keterbatasan pasokan energi listrik dan air bersih di masa mendatang dapat dipertimbangkan alternatif PLTN Desalinasi. Pembangunan kapasitas SDM di Madura masih belum layak dan jauh di bawah rata-rata di Jawa Timur, ditandai dengan rendahnya nilai rataan di Madura. Namun demikian, secara ekonomi sebenarnya sudah baik ditandai dengan nilai daya beli (IDB) diatas rataan jawa Timur. Strategi kebijakan pengembangan ketenagakerjaan yang dapat dilakukan adalah :1). Meningkatkan aksesibilitas untuk memperlancar aliran investasi dan produksi dan menciptakan keterkaitan ekonomi; 2).Mendorong pemanfaatan potensi SDA yang belum tergali; 3). Meningkatkan kelangsungan usaha yang sudah ada; 4). Meningkatkan kemampuan pemerintah daerah untuk menarik investor berdasar keunggulan komparatif dan kompetitif; 5). Meningkatkan kapasitas SDM daerah yang lebih profesional. Kata kunci: sumberdaya manusia (SDM), industrialisasi, PLTN-Desalinasi, tenaga kerja, pendidikan.   ABSTRACT THE STUDY ON HUMAN RESOURCES TOWARD INDUSTRIALIZATION IN MADURA. This research aims at arriving at rich description about human resources’ readiness toward industrialization by 1) determining the direction of industrialization development, 2) discovering supporting as well as interfering factors, 3) identifying alternative solution to the problems, 3) analyzing human resources capacity in terms of Human Development Index, 5) recognizing labor development strategy, 6) noticing the role of education in developing human resources, 7) formulating human resources development agenda. The goal of industrialization development in Madura region is to create such conducive circumstances for the investors that it is likely to trigger optimal industries with its potency and expansion based. Some supporting factors associated with the industrial development scenario in Madura are Suramadu bridge, the expansion of Gerbang Kertosusila into Germa Kertosusila and the availability of facilities and infrastructure. In addition, there are some interfering factors to be considered such as low perception of the local community on the importance of industrialization as well as the shortage of electricity and water intake. The alternative solutions to the obstacles above are to promote socialization program on the importance of industrialization for the advancement of Madura region by all related stakeholders while considering the use of PLTN desalination over water and electricity problems.mHowever, human resources development capacity of Maduresse, whose average capacity is considered both improper and far below the average capacity of the whole population in East Java. Nevertheless, Maduresse relatively has already attained sufficient purchasing power (nilai daya beli/IDB) which is above the average on East Java population as a whole. Labor development strategy policy can be carried through; 1) improving accessibility to Madura to speed up the flow of outside investment, production as well as business; 2) promoting local labor force; 3) improving the prevailing economics activities; 4) improving local government capacity to attract outside investors based on its comparative and competitive superiority; 5) promoting qualified capacity toward local human resources Keywords: human resources, industrialization, PLTN-Desalination, labor force, education.
Hal Muka JPEN 2012 Volume 14 No 2 Desember Hal Muka
Jurnal Pengembangan Energi Nuklir Vol 14, No 2 (2012): Desember 2012
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2012.14.2.3421

Abstract

KEBUTUHAN PELATIHAN SUMBER DAYA MANUSIA PADA OPERASI DAN PERAWATAN PLTN Nurlaila Nurlaila; Yuliastuti Yuliastuti
Jurnal Pengembangan Energi Nuklir Vol 11, No 1 (2009): Juni 2009
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2009.11.1.1431

Abstract

ABSTRAKKEBUTUHAN PELATIHAN SUMBER DAYA MANUSIA PADA OPERASI DAN PERAWATAN PLTN. Makalah ini membahas mengenai kebutuhan Sumber daya Manusia (SDM) pada tahap operasi dan perawatan Pembangkit Listrik Tenaga Nuklir (PLTN) yang dikaitkan dengan kebutuhan pelatihan SDM tersebut. Selain itu, makalah ini juga memaparkan fasilitas pelatihan yang telah tersedia secara domestik serta beberapa saran untuk pengembangan fasilitas pelatihan di Indonesia untuk tahun-tahun ke depan. Asumsi yang digunakan pada studi ini adalah bahwa PLTN yang akan dibangun dan dioperasikan berjumlah dua unit (twin unit) dengan kapasitas tiap unitnya 1000 MWe melalui jenis kontrak turn-key. Jumlah tenaga kerja operasi dan perawatan PLTN berkisar 692 personil yang terdiri atas 42 orang yang bekerja di kantor pusat dan 650 orang yang bekerja di lokasi PLTN. Indonesia telah memiliki pengalaman dalam mengoperasikan dan memelihara pembangkit non-nuklir seperti PLTU dan pengalaman mengoperasikan dan memelihara reaktor riset seperti Reaktor Kartini Yogyakarta, Reaktor Triga Mark II Bandung, dan Reaktor GA Siwabessy Serpong. Selain itu, pengalaman negara-negara lain dalam mengoperasikan dan memelihara PLTN sudah sepatutnya menjadi salah satu referensi bagi Indonesia dalam memformulasikan strategi yang tepat bagi pengembangan SDM PLTN khususnya untuk tahap operasi dan perawatan PLTN. Program pengembangan pendidikan dan pelatihan SDM PLTN dapat dilakukan melalui kerjasama dengan calon vendor.Kata Kunci: operasi dan perawatan PLTN, pelatihan ketenagalistrikan, SDM PLTN ABSTRACT HUMAN RESOURCES TRAINING REQUIREMENT ON NPP OPERATION AND MAINTENANCE. This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the non-nuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates.Keywords: NPP operation and maintenance, electric power training, NPP human resources
ANALISIS KEEFEKTIFAN BIAYA REDUKSI RISIKO REAKTOR DAYA JENIS PWR Heni Susiati
Jurnal Pengembangan Energi Nuklir Vol 1, No 4 (1999): Desember 1999
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.1999.1.4.2005

Abstract

ABSTRAK ANALISIS KEEFEKTIFAN BIAYA REDUKSI RISIKO REAKTOR DAYA JENIS PWR. Dalam bidang teknik manajemen risiko, analisis keefektifan biaya pada reduksi risiko, dikenal sebagai salah satu metode untuk mengevaluasi dan menentukan alokasi optimal sumber-sumber proteksi dan keselamatan dalam sistem industri skala besar. Makalah ini mempertimbangkan beberapa isu yang timbul berkaitan dengan analisis keefektifan biaya reduksi risiko pada Pembangkit Tenaga Nuklir (PLTN). Dua hal penting yang harus diperhatikan yaitu mencakup saling ketergantungan antara kriteria yang mencirikan masalah reduksi risiko dan hasil-hasil agregasi dan prosedur-prosedur penimbangan yang diperlukan ketika kemultidimensian kriteria secara eksplisit diperhitungkan. Pembahasan masalah-masalah ini dijelaskan dengan hasil studi-studi kasus pada reduksi risiko masyarakat dan risiko yang berhubungan dengan pekerjaan di Pembangkit Tenaga Nuklir jenis PWR di Perancis selama pengoperasian normal. ABSTRACT COST-EFFECTIVENESS ANALYSIS OF RISK REDUCTION ON PWR NUCLEAR POWER PLANT. Within the field of risk management techniques, cost-effectiveness analysis of risk reduction is now recognized as an adequate method for evaluating and defining the optimal allocation of protection and safety resources within large industrial systems. The paper considers some of the issues that arise in connection with cost-effectiveness analysis of risk reduction at nuclear power stations. Particular attention is called to both the interdependence between criteria that needed when the multidimensionality of criteria is explicitly taken into account. The discussion of these problems is illustrated with results of case studies on both public and occupational risk reduction at French PWRs during normal operation.
Boric Acid Radiolysis in Primary Coolant Water of PWR at Temperature of 250oC Geni Rina Sunaryo
Jurnal Pengembangan Energi Nuklir Vol 19, No 1 (2017): Juni 2017
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2017.19.1.3192

Abstract

BORIC ACID RADIOLYSIS IN PRIMARY COOLANT WATER OF PWR AT TEMPERATURE OF 250oC. The existence of oxygen in the primary coolant system of PWR could lead to corrosion, hence it is very important to suppress the oxygen concentration in the system. Therefore, study of the effect of boric acid addition into the primary coolant water system of PWR to suppress oxygen concentration resulted from gamma-ray radiation is essential to be performed. The aim of this research is to understand reaction mechanism at temperature of 2500C and the effect of boric acid adding toward oxygen concentration in the PWR primary coolant water. Methodology used is simulation using Facsimile software. Input for the software namely radiolysis reaction mechanism for pure water, G value from radiolysis product, dose rate of 1 and 104 Gy/s, aeration and deaeration system, and specific reaction of boric acid with hydroxyl radical and hydrated electron at temperature 250C and 3000C. The output are in the form of irradiation time vs oxygen concentration time series. The results show that the oxygen production increase significantly with the irradiation time and reach the saturated concentration at 107s. Based on the plot of oxygen’s concentration at 107s vs boric acid, several results are as following: oxygen concentration significantly suppressed by boric acid addition and gives the exponential decreasement, the higher dose rate gives the higher concentration of oxygen, the aeration system gives no effect on suppressing oxygen concentration at boric acid addition up to 0.1M.
PRAKIRAAN PAPARAN RADIASI INTERNA PENDUDUK DI SEKITAR CALON TAPAK PLTN BANTEN Sabam P. Situmorang; June Mellawati
Jurnal Pengembangan Energi Nuklir Vol 13, No 2 (2011): Desember 2011
Publisher : Pusat Kajian Sistem Energi Nuklir, Badan Tenaga Nuklir Nasional

Show Abstract | Download Original | Original Source | Check in Google Scholar | DOI: 10.17146/jpen.2011.13.2.1463

Abstract

ABSTRAKPRAKIRAAN PAPARAN RADIASI INTERNA PENDUDUK DI SEKITAR CALON TAPAK PLTN BANTEN. Telah dilakukan penelitian prakiraan radiasi interna yang diterima penduduk sekitar calon tapak PLTN Banten melalui konsumsi hasil laut ikan teri (Stolephorus) dan kerang (Codakia). Metode yang digunakan adalah wawancara kepada penduduk tentang pola konsumsi ikan teri dan kerang. Lokasi penduduk yang diwawancarai adalah Kampung Peres, Desa Pulau Panjang, Kecamatan Puloampel, Kabupaten Serang, Provinsi Banten karena penduduknya relatif lebih padat dibandingkan kampung lain yang ada di Desa Pulau Panjang. Selanjutnya data yang diperoleh digunakan sebagai penduga dosis interna. Hasil penelitian menunjukkan bahwa dengan pola konsumsi kerang rata-rata per tahun 43,5519 kg dan ikan teri 17,0920 kg maka dapat diperhitungkan prakiraan dosis interna yang diterima penduduk usia dewasa ( 18 tahun) sebesar 0,0025-0,0461 mSv/tahun, namun nilai ini masih dalam kategori aman karena belum melebihi batas dosis efektif yang direkomendasikan oleh IAEA untuk masyarakat (1 mSv/tahun).Kata kunci: radionuklida alam, Stolephorus, Codakia, dosis interna ABSTRACTESTIMATION OF RADIATION EXPOSURE TO RESIDENTS SURROUNDING OF BANTEN NPP SITE CANDIDATE. Research of internal radiation estimation that received by residents around Banten NPP site candidate through the consumption of marine fish (Stolephorus) and shellfish (Codakia) has been conducted. The methods used were interviews to some residents who live in the Peres Kampong, Panjang Island villages, Puloampel District, Serang Regency,Banten Province cause their resident are relatively more high than other Kampong at Pulau Panjang Vilage. Furthermore, the data obtained is used as an estimate for the internal dose. The results showed that the patterns of shellfish consumption on average per year 43.5519 kg and fish 17.0920 kg can then be calculated estimates of the internal dose received by people aged adults ( 18 years) is 0.0025 to 0.0461 mSv/years, and this value is still in the safe category because not exceed an effective dose limit recommended by the IAEA to the public (1 mSv /year).Keywords: natural radionuclides, Stolephorus, Codakia, the internal dose

Filter by Year

1999 2021


Filter By Issues
All Issue Vol 23, No 2 (2021): Desember 2021 Vol 23, No 1 (2021): Juni 2021 Vol 22, No 2 (2020): Desember 2020 Vol 22, No 1 (2020): Juni 2020 Vol 21, No 2 (2019): Desember 2019 Vol 21, No 1 (2019): Juni 2019 Vol 20, No 2 (2018): Desember 2018 Vol 20, No 1 (2018): Juni 2018 Vol 19, No 2 (2017): Desember 2017 Vol 19, No 1 (2017): Juni 2017 Vol 18, No 2 (2016): Desember 2016 Vol 18, No 1 (2016): Juni 2016 Vol 17, No 2 (2015): Desember 2015 Vol 17, No 1 (2015): Juni 2015 Vol 16, No 2 (2014): Desember 2014 Vol 16, No 1 (2014): Juni 2014 Vol 15, No 2 (2013): Desember 2013 Vol 15, No 1 (2013): Juni 2013 Vol 14, No 2 (2012): Desember 2012 Vol 14, No 1 (2012): Juni 2012 Vol 13, No 2 (2011): Desember 2011 Vol 13, No 1 (2011): Juni 2011 Vol 12, No 2 (2010): Desember 2010 Vol 12, No 1 (2010): Juni 2010 Vol 11, No 2 (2009): Desember 2009 Vol 11, No 1 (2009): Juni 2009 Vol 10, No 2 (2008): Desember 2008 Vol 10, No 1 (2008): Juni 2008 Vol 9, No 2 (2007): Desember 2007 Vol 9, No 1 (2007): Juni 2007 Vol 8, No 2 (2006): Desember 2006 Vol 8, No 1 (2006): Juni 2006 Vol 7, No 2 (2005): Desember 2005 Vol 7, No 1 (2005): Juni 2005 Vol 6, No 2 (2004): Desember 2004 Vol 6, No 1 (2004): Juni 2004 Vol 5, No 2 (2003): Desember 2003 Vol 5, No 1 (2003): Juni 2003 Vol 4, No 2 (2002): Desember 2002 Vol 4, No 1 (2002): Juni 2002 Vol 3, No 2 (2001): Desember 2001 Vol 2, No 4 (2000): Desember 2000 Vol 2, No 3 (2000): September 2000 Vol 2, No 2 (2000): Juni 2000 Vol 2, No 1 (2000): Maret 2000 Vol 1, No 4 (1999): Desember 1999 Vol 1, No 3 (1999): September 1999 Vol 1, No 1 (1999): Maret 1999 More Issue