KAJIAN PELELANGAN KONSTRUKSI BERDASARKAN KEPPRES 80/2003 DAN PERPRES 54/2010 (Studi Kasus : LPSE Universitas Diponegoro) Wahyu Kuncoro; Nur Wakhid; M. Agung Wibowo; Hari Nugroho
Jurnal Karya Teknik Sipil Volume 2, Nomor 1, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (721.376 KB)

Abstract

Construction sector has an important role in increasing economic growth. To create a condition that all necessary infrastructure that can guarantee an increase in economic activity. Procurement of facilities and infrastructure as well as the government's infrastructure, using the budget of income and expenditure (APBN/APBD). To supervise the use of budget, procurement regulations are arranged Keppres 80/2003 and amended by Perpres 54/2010. The tender process is expected to use electronic media (e-procurement) to be more transparent, accountable, effective and efficient, in line with efforts to eradicate corruption, collusion and nepotism. The method of research used descriptive research. The sampling technique used purposive sampling with data taken from Diponegoro University LPSE and questionnaires to the respondents as service providers, service users, and the auction committee. A descriptive analysis of data processing and data processing using a Likert scale questionnaire on the subject of the study variables.The results of comparative analysis based on the tender for the construction of Perpres 54/2010 is better than the Keppres 80/2003. In terms of the duration of the execution of the auction package is based on Perpres 54/2010 1.76 is faster, there was the time efficiency of 50%. The cost, Perpres 54/2010 is cheaper. In the case of list requirements, both rules have the same relative terms. In terms of accuracy in the selection of service providers in the Perpres 54/2010 be better. In terms of selection of participants is more stringent Perpres 54/2010 instead of Presidential Decree 80/2003. In terms of transparency in the determination of winners, that the new regulations more transparent. General opinion of the regulation services provider 54/2010 is better.
NORMALISASI SUNGAI DOLOK SEMARANG – DEMAK, JAWA TENGAH Gezzy Satria Pitanggi; Intan Tri Lestari; Suseno Darsono; Salamun Salamun
Jurnal Karya Teknik Sipil Volume 6, Nomor 4, Tahun 2017
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (597.531 KB)

Abstract

Banjir yang sering terjadi di Kabupaten Demak disebabkan oleh meluapnya Sungai Dolok. Kondisi Sungai Dolok yang mengalami penyempitan alur serta pendangkalan menyebabkan berkurangnya kapasitas penampang sungai untuk mengalirkan debit banjir. Akibatnya, pada musim penghujan Kabupaten Demak sering mengalami banjir. Sungai Dolok memiliki panjang sekitar 47 km dan luas daerah aliran sungai sekitar 145 km2. Hidrograf banjir Sungai Dolok dianalisis dengan menggunakan program HEC-HMS dan untuk analisis hidrolika menggunakan program HEC-RAS. Hasil analisis menunjukan kondisi penampang eksisting Sungai Dolok tidak mencukupi untuk mengalirkan debit banjir Q50th sebesar 216 m3/dt. Akibatnya, terjadi bencana banjir di Kabupaten Demak. Dari studi dan perhitungan yang telah dilakukan, pemecahan masalah ini adalah mengadakan normalisasi Sungai Dolok dengan melakukan perbaikan penampang sungai Dolok yang sesuai perencanaan. sehingga Sungai Dolok dapat mengalirkan debit banjir dan mengurangi tingkat bencana banjir di Kabupaten Demak.
PERENCANAAN EMBUNG TAMANREJO KECAMATAN SUKOREJO, KABUPATEN KENDAL Arvie Narayana; Bachtiar Khoirom W.; Abdul Kadir; Dwi Kurniani
Jurnal Karya Teknik Sipil Volume 4, Nomor 1, Tahun 2015
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (860.8 KB)

Abstract

Residents in the village Tamanrejo, District Sukorejo, Kendal in general to work as farmers who rely on irrigation water requirements of Kajar river to irrigate the fields. But it is not uncommon for residents of the village Tamanrejo crop failures due to river discharge Kajar can not meet the needs of irrigation water. To overcome this building constructed in the form of reservoir water. Extensive watershed of Embung Tamanrejo is 12,88 km2 . Embung Tamanrejo planned to meet the needs of irrigation water in the District Sukorejo, irrigation area that will be served an area of 750 hectares. Determination of dimensions Embung Tamanrejo using flood discharge plan of HSS Gama first method of 83,189 m3 / sec with a return period of 50 years. Debit mainstay Kajar River is calculated based on the method of water balance. In August to November there is a shortage of water at 95.822,61 m3. Small Dam volume of 162.636,19 m3 is at an elevation of + 140,00m to + 148,00m. The results of the water balance calculations indicate that the volume of 162.636,19 m3 can meet the need of irrigation water when the river flow shortage. Development Embung Tamanrejo be making buildings with construction masonry spillway and dam body using land fill. Embung planned height of 11 m, with a base elevation at the dam crest elevation +140,00 m and the top reservoir at +151,00 m. Dam crest width 5,00 m, the upstream slope of 1:3 and the downstream slope of 1: 2,25. In planning Embung Tamanrejo used Concrete drop Open Ogee type (overflow spillway) with a width of 25 m, a length of 13 m and a peak elevation at +148,00 m, using an megrim USBR Type III with a length of 5,00 m.Plan implementation time is 24 weeks with work plan budget of RP.6.258.700.000,00 ( Six Billion Two Hundred Fiffty Eigth Million Seven Hundred Thousand Rupiah). Conclusion with built small dam can overcome the shortage of irrigation water
EVALUASI GEOTEKNIK DAN STRUKTUR PADA DERMAGA EKSISTING TERMINAL PETI KEMAS SEMARANG Aditya Yoga Satria; Dhimas Noor Fattah; Indrastono Dwi Atmanto; Himawan Indarto
Jurnal Karya Teknik Sipil Volume 2, Nomor 4, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (562.764 KB)

Abstract

ABSTRACTOne of the Semarang Tanjung Emas flagship facility is a container terminal with field accumulation which is a container handling facility. When viewed from the tendency of the flow of goods through ports, each year has increased. However, an increase in loading and unloading activities are often disrupted by tidal water that flooded dock container terminals. Therefore, the needs of adding  elevation dock container terminals, so that loading and unloading activities are not disrupted. Prior to the adding elevation of the wharf, first geotechnical and structural must be evaluated. From the results of the analysis, geotechnical existing capable of withstanding the load adding elevation dock. Consolidation settlement on geotechnical dock container Semarang is 11 cm, with the consolidation time is 16 months. So the plan elevation of 1.5 m must be added by 11 cm. The decrease was due to land subsidence 11cm/year, so plan elevation of 1.5 m can extend the life of the wharf service to 13 years and 10 months. For existing dock structure able to withstand loads due to the adding elevation of the wharf so it is not necessary to adding capacity. So that the evaluation can be continued into the planning for the elevation of the wharf form of additional beams and plates were riveted by the column.
PENGARUH PENGEMBANGAN KAWASAN INDUSTRI CANDI TERHADAP SUNGAI KREO DI KOTA SEMARANG DAN PENANGANANNYA Luluk Afidah; Nuring Nafisah; Hary Budieny; Suharyanto Suharyanto
Jurnal Karya Teknik Sipil Volume 6 ,Nomor 1, Tahun 2017
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

PT IPU (Indo Permata Usahatama) selaku developer KIC (Kawasan Industri Candi) akan melakukan pengembangan perluasan wilayah pada KIC. Lokasi KIC terletak di antara dua sungai besar di Kota Semarang yaitu Sungai Bringin di sebelah barat dan Sungai Kreo di sebelah selatan. Pengembangan KIC menyebabkan beberapa dampak negatif, salah satunya dengan bertambahnya debit banjir. Dalam Tugas Akhir ini, disajikan hasil kajian pengaruh dari pengembangan KIC terhadap debit banjir di Sungai Kreo. Perhitungan debit banjir dilakukan dengan dua metode, yaitu metode Rasional dan HSS Gama 1. Penanganan dari dampak pengembangan kawasan industri tersebut direncanakan dengan membangun beberapa long storage pada sub DAS Kreo yang terkena dampak pengembangan, yaitu pada sub DAS 1, 2, dan 6. Untuk keperluan Tugas Akhir ini, perencanaan dilakukan pada long storage 1c, meliputi mercu (pelimpah) dan pintu air penguras. Dari perencanaan long storage ini diharapkan dapat menanggulangi dampak banjir yang bisa saja terjadi akibat dari pengembangan kawasan industri Candi  pada daerah Sungai Kreo Semarang. Dari analisis hidrologi didapat debit banjir rencana dengan periode 50 tahun sebesar 29,66 m3/s. Volume tampungan long storage didapat dengan mengurangkan debit sesudah dan sebelum pengembangan. Dari hasil perencanaaan didapatkan volume tampungan sebesar 5418 m3, elevasi dasar +77, elevasi mercu +80, tinggi mercu 3 meter, rencana anggaran biaya sebesar Rp 825,463,000.00 dalam waktu 34 minggu dengan menyertakan penjadwalan pekerjaan long storage.
PENERAPAN METODE CRASHINGPROYEK PEMBANGUNAN ELIZABETH BUILDING RS. SANTO BORROMEUS PAKET 1 BANDUNG Vincensius Palma Ragajiwandana Handri Putra; Arief Andriansyah; Mochammad Agung Wibowo; Bambang Pudjianto
Jurnal Karya Teknik Sipil Volume 3, Nomor 3, Tahun 2014
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (596.52 KB)

Abstract

Project scheduling system is of great importance in the implementation of construction project. To create an effective implementation of construction projects and efficient, all sorts of things should be well planned. In planning the construction of St. Elizabeth Hospital Building borromeous package 1 in Bandung , the author intends to carry out the project duration by accelerating simulation takes into account the magnitude of the project costs incurred. Authors applied the method to simulate the acceleration of crashing the project. In completing this final project, the authors use multiple sources of data, namely the curve S plan, budget plan (RAB), shop drawings projects, and interviews with experts. The research methods used in the final project is to design a network (network planning), calculate the amount of labor required, calculate the costs (direct costs) and indirect costs (indirect costs) on any activity that changes due to changes in the duration of implementation, acceleration duration of the implementation of each heading of work, calculation of cost slope, and the determination of cost and optimum duration of crashing as a result of the application of the method .Final results on Elizabeth Building Development projects RS . Santo Borromeous package 1 Bandung, crashing process is done in two scenarios in which each - each carried 11 times simulation. Based on the graph the relationship between time and cost, obtain the most optimal duration, ie the duration of the minimum total cost is the total project duration of 259 days on the job Crashing 10 occurred in the 1st floor with a slope that is equal to the value of cost Rp.1,861,065.00 per days. Shortening the duration of the Structural Work Level 1 for 7 days, from the normal duration Structural Work Level 1 by 77 days to 70 days . This causes a change in direct costs (direct costs) the normal duration of Rp.46.892.151.077, 89 increased by Rp.117.521.52, be Rp.47.009.672.594.89 , changes in indirect costs (indirect costs) the normal duration of Rp.1,484 .832.000,00 reduced by Rp.428.316.923,00 to Rp. 1,056,515,077.00 and the total cost of the changes from the normal duration of the cost Rp.48.376.983.077,89, reduced by Rp.310.795.400 becomes Rp.48.066.187.677,89. Changes in the cost of the total project cost of the project is equal to ± 0.64 % .
PERENCANAAN SUBMERGED DAN NON SUBMERGED BREAKWATER UNTUK PENANGANAN ABRASI, DI PANTAI MOROSARI DEMAK Zhafarina Hafizha Kautsar; Tubagus Nauval Dzaki; Sriyana Sriyana; Slamet Hargono
Jurnal Karya Teknik Sipil Volume 7, Nomor 2, Tahun 2018
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

ABSTRAK Perubahan garis pantai dapat disebabkan oleh faktor alam maupun ulah manusia. Pantai Morosari Demak salah satu pantai yang mengalami abrasi disetiap tahunnya sehingga menenggelamkan pemukiman warga serta ekosistem mangrove. Tujuan dari perencanaan bangunan pelindung pantai ini adalah mengembalikan daratan pantai beserta eksistensi dari mangrove yang tenggelam akibat abrasi dengan merencanakan bangunan pelindung pantai. Bangunan pelindung pantai inilah yang nantinya berfungsi untuk meredam energi gelombang dan membuat garis pantai maju akibat sedimentasi. Dari analisa windrose dengan data angin selama 10 tahun 5 bulan (2007 - Bulan Mei 2017) diketahui arah angin dominan berasal dari barat laut. Gelombang rencana menggunakan periode ulang 25 tahun. Simulasi terhadap tinggi gelombang dan periode gelombang maksimum menggunakan program Mike21. Perbandingan perubahan garis pantai sebelum dan sesudah adanya bangunan pantai menggunakan program Genesis. besarnya deformasi bangunan pelindung pantai menggunakan program Plaxis. Besarnya kedalaman cerucuk bambu pada bangunan pelindung pantai menggunakan program Foundation Pro V1. Perencanaan bangunan pelindung pantai berupa bangunan submerged dan non submerged breakwater yang ditempatkan rangkap pada dua lokasi, yaitu dari arah barat laut garis pantai sebagai lokasi 1 dan dari arah barat daya garis pantai sebagai lokasi 2. Susunan lapisan dari yang paling bawah sampai ke lapisan yang paling atas pada bangunan pelindung pantai submerged dan non submerged breakwater adalah lapisan geoteknik berupa cerucuk bambu dengan kedalaman 12 m untuk non submerged breakwater dan kedalaman 20 m untuk submerged breakwater, matras bambu dengan tebal 3 lapisan atau setebal 0,5 m, lapisan geogrid setebal 20 cm; dilanjutkan pada lapisan diatasnya terdapat tumpukan batu mulai dari lapisan inti dan berm kaki, untuk lapis lindung kedua dari kedua bangunan tersebut menggunakan tumpukan batu kasar dengan berat 50 kg per butir, pada lapisan yang paling atas terdapat lapis lindung luar menggunakan struktur tetrapod dengan berat 500 kg per butir. Rekapitulasi rencana anggaran biaya untuk pembangunan submerged dan non submerged breakwater pada lokasi 1 sebesar Rp. 71.252.574.500, sedangkan rekapitulasi rencana anggaran biaya untuk pembangunan submerged dan non submerged breakwater pada lokasi 2 sebesar Rp. 30.727.219.500.
KAJIAN PANJANG WORK ZONE DAN SISTEM PENGATURAN LALU LINTAS PADA PROYEK PERBAIKAN JALAN SEMARANG – GODONG Ericha Marthina; Arini Novita Sari; Bambang Riyanto; Amelia Kusuma Indriastuti
Jurnal Karya Teknik Sipil Volume 4, Nomor 4, Tahun 2015
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (758.644 KB)

Abstract

Road of Semarang – Godong is a type of road 2/2 UD currently under repair and greatly affected the result of the open – closed system, so the road was made the object of research. The aim of the research was to analyze the characteristics of the traffic, looking for the relationship between the volume of arrivals – long queues – the length of the work zone and reviewing traffic management system in the work zone. Analyze that done are analyze on existing condition and traffic management system with a length of 1,070 km using the method of the approach to the junction signal with two phases on MKJI 1997. This analysis also simulated on the variant length of the work zone. The results showed an analysis of existing conditions with observations data each cycle can’t proceed, so analysis only use data classification. The system settings can minimize the length of the traffic queues and the degree of saturation. From the results of the simulation of different length work zone obtained a value of DS and the minimum of the queue length 0.2 km. Other results obtained is increasingly large flows of arrival on-site queue getting longer, but the rate of increase in the existing conditions in the queue is larger compared to the results of the analysis of the traffic management system. Further research is required related factors on damage to roads and the length of the segment that is most optimal. To streamline traffic settings can use APILL portable or using more appropriate implementation method.
EVALUASI KINERJA BATIK SOLO TRANS (STUDI KASUS : KORIDOR I KARTASURA-PALUR, SURAKARTA) Purnomo Dwi Sujatmiko; Nadhia Puspita R.; Ismiyati Ismiyati; Wahyudi Kushardjoko
Jurnal Karya Teknik Sipil Volume 2, Nomor 3, Tahun 2013
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (363.898 KB)

Abstract

The results of the performance evaluation BST corridor I obtained some indicators that meet the standards of the Department of Transportation and the World Bank that headway, speed, travel time on Saturday and Sunday, as well as most of the distance between the shelter, while the load factor is still below the standard which is still less than 70 %. Load factor due to non-fulfillment by the results of the questionnaires are reluctant to switch to using BST for several reasons including watu waiting periods, the route less BST, BST facilities are lacking, long travel times BST, is also proved from the results of the survey where the travel time for the day Monday more than 3 hours. Despite the low load factor based on the analysis of vehicle operating costs BST rate applicable experience keutungan that will be able to meet the operational costs of vehicles. With the results of the analysis did not meet the standard, it can be improved by adding corridors that intersect with the corridor so that the people I want to switch to using BST as it has many routes. Making other transport as feeder so that the corridor I just BST operate and can facilitate people to the shelter BST which will be raising load factor.Contra flow system on the road Slamet Riyadi tracking and bus priority at junctions can shorten travel times BST faster. With that expected performance can be optimized BST serve passengers and non-users can switch to using a BST as a mode of daily transportation.
ANALISIS OPTIMALISASI PENGEMBANGAN SARANA DAN PRASARANA TERMINAL PETI KEMAS SEMARANG Nanda Putri Djambek; Dea Gusta Ariska; Wahyudi Kushardjoko; Kami Hari Basuki
Jurnal Karya Teknik Sipil Volume 6, Nomor 2, Tahun 2017
Publisher : Departemen Teknik Sipil, Fakultas Teknik Universitas Diponegoro

Show Abstract | Download Original | Original Source | Check in Google Scholar | Full PDF (682.15 KB)

Abstract

Tujuan studi penelitian ini untuk mengetahui kinerja dan kapasitas dermaga, kinerja dan kapasitas container yard, dan kapasitas alat yang berada di Terminal Peti Kemas Semarang, yaitu Container Crane (CC), Automatic Rubber Tyred Gantry (ARTG) dan Rubber Tyred Gantry (RTG). Metode yang digunakan untuk mengetahui kinerja dermaga adalah Berth Occupancy Ratio (BOR), yaitu perbandingan antara waktu penggunaan dermaga dengan waktu yang tersedia yang dinyatakan dalam presentase. Sedangkan kinerja dari container yard dapat dianalisis menggunakan metode Yard Occupancy Ratio (YOR), yaitu nilai yang  menunjukan persentase dari terminal yang dimanfaatkan untuk penumpukan peti kemas untuk periode tertentu. Kapasitas dermaga dan container yard dihitung menggunakan persamaan kapasitas dermaga terpasang (KDL) dan persamaan luasan container yard (At). Selain itu metode BTP (Berth Throughput) digunakan dalam studi penelitian ini untuk mengetahui tingkat pemakaian dermaga. Nilai BOR dengan persamaan beberapa tambatan pada tahun 2016 adalah 54,33% dan nilai BOR dengan persamaan tambatan umum 22,87%. Besarnya nilai BTP tahun 2016 adalah 3.696 TEUs/m/tahun dan nilai KDL adalah 1.995.640 TEUs. Jika nilai BTP terpasang dibandingkan dengan nilai BTP terpakai (1.139 TEUs/m/tahun) dan nilai KDL dibandingkan dengan jumlah peti kemas tahun 2016 (615.133 TEUs/tahun), maka disimpulkan pada tahun 2016 TPKS  masih mampu melayani kedatangan peti kemas. Luasan kebutuhan Container Yard (CY) dihitung menggunakan persamaan At didapatkan hasil sebesar 17,68 ha. Jika dibandingkan dengan luas terpasang container yard (18,5 ha), maka disimpulkan bahwa container yard TPKS masih mampu melayani penumpukkan peti kemas. Kinerja container  yard di TPKS ditunjukkan melalui nilai YOR pada tahun 2015 yaitu sebesar 62,95%, nilai tersebut dipengaruhi oleh dwelling time. Sebaiknya pada studi selanjutnya didasarkan pada kaidah ISPS Code (International Ship and Port Security) dan memperhitungkan tingkat pertumbuhan industri dan angkutan barang.