cover
Contact Name
sulistiyanto
Contact Email
wjowo2020@gmail.com
Phone
+6281332986888
Journal Mail Official
jurnalvonis@gmail.com
Editorial Address
PERUM BUMI BULU INDAH Gg. Rambutan No.1, RT:01/RW: 06, Desa BULU Kecamatan KRAKSAAN Probolinggo, JAWA TIMUR
Location
Kab. probolinggo,
Jawa timur
INDONESIA
Journal of Science and Engineering
Published by CV. Akira Java Bulu
ISSN : -     EISSN : 31236561     DOI : -
Core Subject :
This journal is a scientific publication dedicated to the dissemination of research findings and advances in all types of engineering sciences, including civil engineering, mechanical engineering, architectural engineering, geodetic engineering, electrical engineering, biological sciences, microbiology, chemistry, astronomy, and all fields of science. This peer-reviewed journal serves as a platform for researchers, academics, and professionals to share their innovative contributions and insights in various fields. Through rigorous evaluation and publication of high-quality research papers, the journal aims to foster collaboration, exchange of ideas, and technological advancement in the field of engineering.
Arjuna Subject : -
Articles 27 Documents
Analisis Investasi Rumah Tinggal 2 Lantai Proyek Berdasarkan Metode NPV, IRR, BCR dan Cash Flow Yoga Alvian Pratama; Amri Gunasti
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The construction of a two-storey residential house requires a detailed cost estimation to ensure that the project is financially feasible. This study aims to analyze the investment value of the Adel House two-storey housing project based on the Bill of Quantity (RAB) data and cash flow evaluation. The research method used in this study is a quantitative descriptive method through documentation study using project budget plan data obtained from the Excel-based Bill of Quantity (RAB). The research stages include data collection, cost recapitulation, cash flow preparation, and financial feasibility analysis using Net Present Value (NPV), Internal Rate of Return (IRR), and Benefit Cost Ratio (BCR) methods. The cost data include several main work components such as preparation works, earthworks, reinforced concrete works, wall works, roofing and ceiling works, floor and wall finishing works, aluminum and steel works, painting works, and mechanical-electrical-plumbing (MEP) works. The total direct construction cost of the project is IDR 256,070,300, with an additional calculated amount leading to a total project cost of approximately IDR 284,238,000. The results of the financial feasibility analysis indicate that investment feasibility can be determined by comparing the present value of benefits and costs over the project life cycle. A project is considered financially feasible if the NPV is positive, the IRR exceeds the discount rate, and the BCR value is greater than 1. This study provides a financial assessment framework for residential construction projects based on cost planning and economic engineering principles.
Analisa Rencana Anggaran Biaya Untuk Efisiensi Studi Kasus Pembangunan Rumah Tinggal 2 Lantai Rafi Ramadhan; Amri Gunasti
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The Cost Estimate (RAB) is a crucial component in planning a two-story residential construction project, which is more intricate and complex than building a single-story house; therefore, an efficient cost estimate is required to minimize costs without compromising safety or the structural integrity of the building. This study aims to analyze cost components within the BEP that have the potential to cause cost overruns without compromising the quality of the building itself. The methods used are quantitative and descriptive analysis, reviewing BEP data from the perspectives of preparatory work, structure, architecture, and finishing. The analysis results indicate that expenditures can be made more efficient by re-evaluating the selection of more economical materials that still meet technical standards. Additionally, efficiency can be further enhanced by implementing good project management and eliminating non-essential expenditures. Thus, a comprehensive evaluation of the cost estimate can produce a more efficient and effective budget plan for the construction of a two-story house.
Analisis Struktur Biaya Proyek Konstruksi Pendidikan Dengan Metode Klasifikasi Biaya  Ekonomi Teknik Muhammad Hilman Nur Ikrom
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Penelitian ini bertujuan menganalisis struktur biaya pembangunan ruang kelas baru di Madrasah Ibtidaiyah Darut Tauhid dengan pendekatan klasifikasi biaya dalam ekonomi teknik, yang berangkat dari pentingnya pengelolaan biaya konstruksi tidak hanya sebagai angka nominal dalam Bill of Quantity (BOQ), tetapi juga sebagai dasar pengendalian anggaran dan evaluasi efisiensi proyek. Metode penelitian yang digunakan adalah deskriptif-kualitatif dengan studi kasus, di mana data diperoleh melalui dokumentasi BOQ dan dianalisis dengan klasifikasi biaya berdasarkan waktu, sifat penggunaan, produk, dan volume pekerjaan. Hasil penelitian menunjukkan bahwa biaya terbesar terdapat pada pekerjaan beton bertulang (23,97%), plesteran (17,56%), dan pasangan (14,38%), dengan seluruh biaya termasuk kategori present cost karena merupakan pengeluaran aktual, mayoritas tergolong variable cost dan direct cost sehingga sangat dipengaruhi oleh volume pekerjaan fisik di lapangan. Temuan ini menegaskan bahwa pengendalian volume pekerjaan dan ketelitian dalam penyusunan BOQ menjadi faktor utama dalam menjaga efisiensi anggaran, sementara penelitian ini memberikan kontribusi berupa penerapan konsep klasifikasi biaya ekonomi teknik secara sistematis pada proyek konstruksi pendidikan serta manfaat praktis bagi pengelola proyek dalam meningkatkan transparansi, akuntabilitas, dan efektivitas pengendalian biaya.
Analisis Kelayakan Ekonomi Pembangunan Gedung Kos Defilla Tiga Lantai Berdasarkan Data Rencana Anggaran Biaya Insyiroh Hazhiyatil Fathinah; Amri Gunasti
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

The construction of boarding house buildings is one form of property investment that has promising prospects in urban areas. This study aims to analyze the economic feasibility of the Defilla Three-Story Boarding House construction project based on the Budget Plan (RAB) data. The study uses secondary data obtained from a previous undergraduate thesis regarding the cost estimation and tender process of the Defilla Three-Story Boarding House project in Semarang. The data were further analyzed using the Net Present Value (NPV), Internal Rate of Return (IRR), Benefit Cost Ratio (BCR), and Payback Period (PP) methods. The total investment cost based on the Budget Plan data was Rp1,570,137,000. The analysis results showed an NPV value of Rp430,521,112, an IRR value of 13.91%, a BCR value of 1.27, and a Payback Period of 6 years and 8 months. Based on these results, the construction project of the Defilla Three-Story Boarding House is considered economically feasible and has the potential to provide long-term investment benefits.
Perencanaan Investasi Fasilitas Gudang Tambang Pasir Berdasarkan Analisis Struktur Biaya Dan Evaluasi Kelayakan Finansial Menggunakan Metode Benefit Cost Ratio (BCR) Cholby Efendy; Amri Gunasti
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This stu The establishment of a sand mining storage facility requires careful engineering and economic planning to ensure long-term structural durability and finansial efficiency. This study evaluates the investment planning for a sand mining warehouse by analyzing its cost structure and financial feasibility using the Benefit-Cost Ratio (BCR) method. High-volume bulk materials like sand exert significant lateral and vertical loads, necessitating robust reinforced concrete design and optimal material selection. Financial data were analyzed over a 10-year planning horizon with an assumed discount rate of 10% per annum. The initial capital expenditure (CapEx) includes land acquisition, earthworks, and structural concrete construction, while operational expenditure (OpEx) covers maintenance and logistical management. The cash flow simulation integrates projected annual revenues from enhanced logistics and reduced material degradation. The structural analysis ensures that the facility complies with Indonesian concrete standards to prevent failure under peak load configurations. The financial evaluation yields a BCR value greater than 1.0, indicating that the discounted benefits outweigh the total capitalized costs. This comprehensive approach proves that integrating structural integrity with rigorous financial parameters provides a reliable framework for industrial infrastructure investment, minimizing economic risks while maximizing structural service life.
Analisis Komponen Biaya Pemeliharaan Taman Kampus UIN Berdasarkan RAB Menggunakan Metode AHSP dan Pendekatan Kuantitatif azam ibnu; Amri Gunasti
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pemeliharaan taman kampus merupakan bagian penting dalam menjaga kualitas lingkungan, kenyamanan, serta fungsi estetika kawasan perguruan tinggi. Penelitian ini bertujuan untuk menganalisis komponen biaya pemeliharaan taman Kampus UIN Kiai Haji Achmad Siddiq Jember berdasarkan dokumen Rencana Anggaran Biaya (RAB) menggunakan metode Analisa Harga Satuan Pekerjaan (AHSP) dan pendekatan kuantitatif. Data penelitian diperoleh dari dokumen Engineer Estimate (EE) pekerjaan pemeliharaan taman Kampus UIN tahun anggaran 2022 dengan total nilai anggaran sebesar Rp152.000.000. Analisis dilakukan terhadap beberapa item pekerjaan utama seperti pekerjaan persiapan, pembuatan papan nama, pekerjaan gazebo, perbaikan jalan setapak, pergola bunga, pagar tanaman, tempat duduk, instalasi listrik, dan pekerjaan taman. Hasil penelitian menunjukkan bahwa komponen biaya terbesar terdapat pada pekerjaan taman sebesar Rp53.025.532,50 atau sekitar 34,88% dari total anggaran. Selanjutnya pekerjaan perbaikan jalan setapak memiliki kontribusi sebesar Rp40.123.622,88 atau 26,40% dari total biaya. Sementara itu, pekerjaan dengan nilai terendah terdapat pada pekerjaan persiapan sebesar Rp4.287.375,00. Penggunaan metode AHSP mampu memberikan perhitungan biaya yang lebih sistematis, terukur, dan sesuai dengan kebutuhan lapangan karena mempertimbangkan komponen tenaga kerja, bahan, dan peralatan. Pendekatan kuantitatif dalam penelitian ini membantu mengidentifikasi distribusi biaya pada setiap jenis pekerjaan sehingga dapat digunakan sebagai dasar evaluasi efisiensi anggaran pemeliharaan taman kampus di masa mendatang.
Analisis Komponen Biaya Produksi Pembangunan Rumah Tinggal 2 Lantai Berdasarkan Work Breakdown Structure (WBS) vina vina amaliyah; Amri Gunasti
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

This study aims to develop a Work Breakdown Structure (WBS) for a two-story residential construction project, analyze production cost components based on each work group, and determine the cost distribution within the project. The research method used is a quantitative descriptive method utilizing secondary data in the form of working drawings, technical specifications, work volumes, and unit prices. The research stages include WBS preparation, work volume calculations, work unit price analysis (AHSP), preparation of a Cost Budget Plan (RAB), and cost distribution analysis based on the WBS structure. In a study on the Analysis of Production Cost Components for the Construction of a Two-Story Residential House based on a Work Breakdown Structure (WBS), the use of a WBS simplifies and streamlines the work identification process compared to using this approachCost analysis based on the WBS indicates that each work group has a different cost contribution to the total project cost. Structural work, including foundations, footings, columns, beams, floor slabs, and stairs, is the work component that contributes the most to costs due to the high material and labor requirements. Furthermore, the implementation of a WBS has been proven to improve the accuracy of RAB preparation, facilitate cost control, and assist in project monitoring and evaluation during construction.
Analisis Efisiensi Biaya Menggunakan Metode Value Engineering Proyek Rumah Tinggal Minimalis 2 Lantai Iqbal Yuliantama
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Peningkatan harga material konstruksi di Indonesia menyebabkan biaya pembangunan rumah tinggal terus mengalami kenaikan, sehingga diperlukan upaya efisiensi biaya tanpa mengurangi fungsi dan kualitas bangunan. Penelitian ini bertujuan untuk menganalisis efisiensi biaya menggunakan metode Value Engineering pada proyek rumah tinggal minimalis 2 lantai. Metode penelitian yang digunakan adalah deskriptif kuantitatif dengan menganalisis data Rencana Anggaran Biaya (RAB), kebutuhan material, dan rincian pekerjaan proyek dari Indo Design Center. Tahapan penelitian dilakukan melalui identifikasi item pekerjaan dengan biaya terbesar, analisis material dominan, serta evaluasi alternatif efisiensi biaya menggunakan pendekatan Value Engineering. Hasil penelitian menunjukkan bahwa pekerjaan struktur beton bertulang merupakan komponen biaya terbesar yaitu sebesar Rp544.074.464 atau sekitar 39,50% dari total biaya proyek Rp1.376.572.812. Selain itu, pekerjaan dinding sebesar 20,52% dan pekerjaan keramik sebesar 6,85% dari total biaya proyek. Material dominan yang paling mempengaruhi tingginya biaya konstruksi meliputi semen, besi beton, dolken, balok kayu, granite tile, beton ready mix, dan kaca tempered. Penerapan metode Value Engineering dilakukan melalui pengendalian penggunaan material, optimasi volume pekerjaan, dan pemilihan alternatif material yang lebih ekonomis tanpa mengurangi fungsi utama bangunan. Berdasarkan hasil analisis, metode Value Engineering efektif membantu meningkatkan efisiensi biaya konstruksi pada proyek rumah tinggal minimalis 2 lantai.
Analisis Kelayakan Investasi Pembangunan Gudang Distribusi Baja Ringan PT. SAGUN LAGUNA Dengan Metode Capital Budgeting sahrul laguna; Amri Gunasti
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Pertumbuhan industri konstruksi yang pesat meningkatkan permintaan material baja ringan secara signifikan. PT. Sagun Laguna berencana mengoptimalkan rantai pasoknya melalui pembangunan gudang distribusi baru. Penelitian ini bertujuan untuk menganalisis kelayakan investasi proyek tersebut dengan menggunakan pendekatan Capital Budgeting. Metode evaluasi finansial yang diterapkan meliputi Net Present Value (NPV), Internal Rate of Return (IRR), Payback Period (PP), dan Profitability Index (PI) dengan asumsi umur ekonomis proyek selama 10 tahun dan biaya modal (WACC) sebesar 12%. Total investasi awal yang dibutuhkan adalah sebesar Rp 4.500.000.000. Hasil analisis kuantitatif menunjukkan nilai NPV sebesar Rp 1.841.455.000 (bernilai positif), IRR sebesar 21,54% (lebih besar dari WACC), Payback Period dicapai dalam waktu 4 tahun 2 bulan, dan Profitability Index sebesar 1,41 (> 1). Berdasarkan indikator-indikator finansial tersebut, investasi pembangunan gudang distribusi PT. Sagun Laguna dinyatakan layak untuk dijalankan
Eksplorasi Isolat Bakteri Rizosfer Musa acuminata Pada Fermentasi Ampas Tebu Sebagai Kandidat Biofertilizer Dian Ramadhani H; Widyawati Mantulangi; Mohammad Fadel Tangahu; Ani Hasan; Wirnangsi Din Uno
Journal of Science and Engineering Vol. 2 No. 1 (2026)
Publisher : CV. Akira Java BUlu

Show Abstract | Download Original | Original Source | Check in Google Scholar

Abstract

Rizosfer tanaman adalah lingkungan mikroorganisme yang memiliki kemampuan besar sebagai sumber bakteri fungsional untuk mendukung praktik pertanian yang berkelanjutan. Tujuan dari penelitian ini adalah untuk mengkarakterisasi isolat bakteri dari rizosfer Musa acuminata, menilai kemampuan mereka dalam fermentasi ampas tebu, dan mengeksplorasi potensinya sebagai calon biofertilizer berdasarkan produksi Asam Indole Asetat (IAA). Penelitian ini dilakukan melalui eksperimen di laboratorium dengan metode isolasi bakteri menggunakan media Nutrient Agar (NA), pemurnian isolat dengan metode streak plate, pewarnaan Gram, uji produksi IAA menggunakan reagen Salkowski, serta fermentasi ampas tebu selama 14 hari dan menghitung viabilitas bakteri menggunakan metode Total Plate Count (TPC). Hasil penelitian mengungkapkan bahwa isolat bakteri memiliki morfologi koloni yang berwarna putih krem, berbentuk bulat, dengan elevasi cembung dan tepian yang rata. Pewarnaan Gram menunjukkan bahwa bakteri tersebut bersifat Gram positif dan berbentuk sel kokus yang berkelompok. Uji IAA menghasilkan perubahan warna menjadi merah muda setelah penambahan reagen Salkowski, yang menandakan adanya produksi IAA secara kualitatif. Fermentasi ampas tebu membawa perubahan karakteristik fisik, termasuk peningkatan kekeruhan, munculnya aroma asam, serta terbentuknya endapan setelah inkubasi selama 14 hari. Perhitungan TPC pada pengenceran 10⁻⁶ menunjukkan ada 34 koloni dengan total viabilitas sebesar 3,4 × 10⁸ CFU/mL. Dengan demikian, isolat bakteri dari rizosfer Musa acuminata menunjukkan potensi awal sebagai kandidat biofertilizer yang berbasis fermentasi ampas tebu.

Page 2 of 3 | Total Record : 27